Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹49.6 L
Closing Date
29 Mar 2022, 4:00 pmClosed
Executive Engineer TDA Kargil
Beamathang Kargil
Construction of Parking Place ( Extension Part) at Hunderman near View Point
2022_LAHDC_6024_1
E-Tender64ofTDA Kargil
Open Tender
Civil Works - Others
Item Rate
60 days
Hunderman Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Payable To CEO TDA Kargil
Exempted
31 Mar 2022
14 Mar 2022
31 Mar 2022
14 Mar 2022
29 Mar 2022
14 Mar 2022
Amount
Earthwork in excavation by manual means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10sqm. on plan, depth upto 1.5mtr. Including disposal of excavated earth upto 1mtr. from cutting edge disposed earth is to be levelled and neatly dressed in:- All kinds of soil 80%
Earthwork in excavation by manual means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10sqm. on plan, depth upto 1.5mtr. Including disposal of excavated earth upto 1mtr. from cutting edge disposed earth is to be levelled and neatly dressed in:- Hard Rock 20%
Providing and laying cement concrete in retaining walls, returns walls (any thikness ) including attached pilasters, clumns, pirs, abutments, pillars, posts, etc. Including curing but excluding the cost of centring, shuttring and finishing with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) Crushed
Centering and shuttering including strutting, propping etc. complete and removal of form for:
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Filling of stone behind retaining wall including supply and carraige upto 3km complete.
Carriage of sand/bajree for average lead of 15km by mechanical transport.
Carriage of stone for average lead of 3Km by Mechnical transport.
Carriage of cement for average lead of 6km by mechanical transport.
M/S MOHD HADI
M/S FEROZ AHMAD
M/S MOHD QASIM
M/S MOHD HUSSAIN
M/s K.K Construction
M/S Ghulam Raza
M/S SADIQ ALI
M/S Mohd Ismail
M/S Anwar Hussain
M/S MOHD ALI
M/S NIYAZ ALI
AQAIN ENGINEERING WORK(OPC) PRIVATE LIMITED
M/S MOHAMMAD ABASS
Abdul hussain
M/S MOHD KAZIM BEIGH
M/S SHABIR HUSSAIN
M/S MOHAMMAD JAWAD
Aflah Group Of Engineering And Construction Co
Haji hussain
MS Dokspa Automobiles and Construction
ASGAR ALI
zakir hussain
M/S NU TECH. CONSTRUCTION
M/S MOHD IBRAHIM
M/S MOHAMMAD HUSSAIN
M/S MOHAMMAD ALI
HNA GROUP OF ENGINEERING AND CONSTRUCTION CO.
M/S TARIQ AHMAD KHAN
stage.html
html • 0.08 MB
finance_14688.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .