Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC ASSISTANT ENGINEER LID EW ALAYAM GRAMA PANCHAYAT | FARIDABAD | HARYANA | 121004 | L1 | Accepted-AOC LOWEST QUOTED | |
| 2 | Rejected-Technical COMPLETION WORK AND ELECTRIFICATION OF TAKE A BRAKE COMFORT STATION ELECTRIFICATION GENERAL ELECTRICAL WORK | - | Rejected-Technical Highest quoted |
| Sl No | Description | Qty | Unit | RAFEEKH KP L2 | Sunil K L1 |
|---|---|---|---|---|---|
| 1.00Construction of Mavulla Chalil Well for DWSS | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 182.27 | cum | 240.45 ₹43,826.58 | 239.79 ₹43,706.28 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 52.86 | cum | 122.28 ₹6,463.48 | 121.94 ₹6,445.5 Lowest |
| 1.00 | OD409322/2025-2026:3.00m to 4.50m Extra for every additional lift 1.5 m or part there of in excavation / banking
excavated or
stacked materials.
All kinds of soil | 52.86 | cum | 244.56 ₹12,926.95 | 243.89 ₹12,891.54 Lowest |
| 1.00 | OD409323/2025-2026:4.50m to 5.00m Extra for every additional lift of 1.5 m or part thereof in excavation/banking
excavated or
stacked materials.
All kinds of soil | 17.62 | cum | 366.85 ₹6,463.53 | 365.84 ₹6,445.73 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 50 | hour | 322.5 ₹16,125 | 321.61 ₹16,080.5 Lowest |
| 1.01 | 50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 10.78 | cum | 9,190.88 ₹99,077.69 | 9,165.51 ₹98,804.2 Lowest |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 77.04 | sqm | 288.37 ₹22,215.45 | 287.57 ₹22,153.82 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,077.95 | kilogram | 104.93 ₹1,13,109.61 | 104.64 ₹1,12,797 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.04 | cum | 8,620.24 ₹17,576.67 | 8,596.45 ₹17,528.16 Lowest |
Tender Value
₹17.7 L
EMD Value
₹44,267
Closing Date
10 Mar 2026, 6:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER VALAYAM GP
Mavullachalil DWSS
2026_LSGD_843043_1
194/AE/LIDEW/VLYM/2025-26
Open Tender
Civil Works - Water Works
Item Rate
360 days
VALAYAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹44,267
Yes
17 Jul 2026
3 Mar 2026
13 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Mavulla Chalil Well for DWSS | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.6 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 1 | cum | - | - |
| 1.003 | OD409322/2025-2026:3.00m to 4.50m Extra for every additional lift 1.5 m or part there of in excavation / banking
excavated or
stacked materials.
All kinds of soil | 1 | cum | - | - |
| 1.004 | OD409323/2025-2026:4.50m to 5.00m Extra for every additional lift of 1.5 m or part thereof in excavation/banking
excavated or
stacked materials.
All kinds of soil | 1 | cum | - | - |
| 1.005 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.006 | 50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | - | - |
| 1.007 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 0.2 | sqm | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.2 | kilogram | - | - |
| 1.009 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1422741.xls
BOQ • 0.34 MB
sbd.pdf
Tender Documents • 1.69 MB
tender1.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .