| 1 | L1₹23.8 LAccepted-AOC ACCREDITED ENGINEER BOROBAZAR T D BLOCK | JALPAIGURI | WEST BENGAL | 734001 | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹23.8 LSame as L1Rejected-Finance VILL BANDUGURI P O P S SIDLI DIST CHIRANG BTC ASSAM PIN 783394 | CHIRANG | ASSAM | 783394 | L2 | Rejected-Finance quoted high | |
| 3 | L3₹25.8 L+₹2.1 L (8.64%)Rejected-Finance | L3 | Rejected-Finance quoted very high |
Tender Value
₹23.8 L
EMD Value
₹47,525
Closing Date
1 Feb 2024, 2:00 pmClosed
BDO, Sidli-Chirang Dev. Block, Sidli
O/o the BDO, Sidli-Chirang Dev. Block, Sidli
Construction of Road at North Garlabary near Amen house under 15th Finance for the year 2022-23 during 2023-24
2024_BoTC_35581_1
BTC/SCDB/05/2023(Re-Tender) - 03
Open Tender
Civil Works
Works
180 days
North Garlabary - CHIRANG
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹47,525
Yes
17 Mar 2024
20 Jan 2024
1 Feb 2024
20 Jan 2024
1 Feb 2024
20 Jan 2024
20 Jan 2024 - 1 Feb 2024
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means (A) In area of non thorny jungle
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement. (I) Private Land
By mix in place method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material
HP Culvert Earthwork in excavation for structures as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material 1) In ordinary Soil Upto 3.00 m depth
Plain cemwnt concrete M 10 in open foundations complete as per drawings and technical specifications clause 1109
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 1109 II. Brick masonry in 1:4 cement mortar
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 600 mm dia
Back filling in foundation trenches as per technical specification clause 1108
TEKLO BORO BASUMATARY
Sola Basumatary
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .