Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51,576Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
Tender Value
₹57,951
EMD Value
₹1,449
Closing Date
8 Mar 2024, 6:00 pmClosed
AE LSGD PUTHIGE
AE
Annual Plan-PUTHIGE GP PR NO 336/2023- 24-MUNDITHADKA ANGANWADI IMPROVEMENT-General Civil Work
2024_LSGD_664124_4
11/AE/LSGD/PTG/2023-24
Open Tender
Civil Works - Roads
Item Rate
180 days
AE LSGD PUTHIGE
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹1,449
Yes
13 Mar 2024
1 Mar 2024
11 Mar 2024
1 Mar 2024
8 Mar 2024
1 Mar 2024
Amount
maintanance
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD401149/2023-2024: Laterite masonry with neatly dressed laterite stone of size 35x20x20cm for foundation and basement including all cost etc. complete as directed by the engineer in charge
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD401161/2023-2024::Providing and laying 60mm thick factory made cement concrete interlocking paver block made by block machine with strong vibratory compaction of approved size design and shape laid in required colour and pattern over and including 50mm thick compacted bed of stone aggregate 6mm nominal size filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. vertically including cost and conveyance of all materials all labour charges, fabricating etc. complete. (Modified 16.68 by replacing Sand bed 6mm stone aggregate bed)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
K ABDUL RAHIMAN
Bidder Name
K ABDUL RAHIMAN
MOHAMMED ISMAIL C H
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1034506.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .