Loading…
Loading…
Tender Value
₹4.2 L
EMD Value
₹10,395
Closing Date
9 Jul 2026, 12:00 pm5d left
Assistant Manager (PED)
STEEL INDUSTRIALS KERALA LTD. ATHANI P.O THRISSUR- 680 581
MP-LADS- 2025-26 of Sri.Francis George MP Ward-08,Bharananganam GP-Construction of Bus shelter (4.5 M x 1.5 M) at Bharananganam Pilligrim center on Erattupetta to Pala road side in Bharananganam GP, Ward- 08, Kottayam District
2026_SILK_858566_1
SILK/PED/S-15/2026-27/464A
Open Tender
Miscellaneous Works
180 days
Kottayam
As per the tender documents
6 documents required · 6 mandatory
₹981
₹10,395
Yes
2 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
2 Jul 2026 - 9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 1.01 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 1 | cum | - | - |
| 1.02 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement: 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.03 | 50.6.2.1 Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 (1 cement : 6 coarse sand) etc complete | 1 | cum | - | - |
| 1.04 | 5.9.1 Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.05 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.06 | 10.2 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kg | - | - |
| 1.07 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.08 | 2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides foundation etc. in layers not exceeding 20 cm in depth, consolidating each layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. of deposited | - | cum | - | - |
| 1.09 | 13.1.1 12 mm cement plaster of mix: 1:4 (1 cement: 4 fine sand) | - | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
GCC.pdf
Tender Documents • 0.24 MB
PROFILE.pdf
Additional Documents • 0.03 MB
BOQ_1451431.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid