Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-AOC | L1 | Accepted-AOC Accepted due to L1 | |
| 2 | L2₹14.3 L+₹44,214.29 (3.19%)Rejected-AOC | L2 | Rejected-AOC Rejected due to L2 | |
| 3 | L3₹14.7 L+₹82,989.87 (5.98%)Rejected-AOC KANDATHAL HOUSE ADIMALY | IDUKKI | KERALA | 685501 | L3 | Rejected-AOC Rejected due to L3 |
Tender Value
₹13.4 L
EMD Value
₹20,086
Closing Date
6 Jul 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
Assistant Executive Engineer PWD Roads Subdivision,Munnar
Special Package 2020-21.Providing urgent BT patch and Bit CC between Km. 04/000 to 04/800 of Koombanpara - Mankadavu road.(RE-Tender)
2021_PWD_416966_2
10/AEE/MNR/2020-21
Open Tender
Civil Works - Roads
Item Rate
180 days
Koombanpara - Mankadavu
Please refer tender documents
6 documents required · 6 mandatory
₹2,760
Yes
₹20,086
Yes
4 Dec 2021
28 Jun 2021
8 Jul 2021
28 Jun 2021
6 Jul 2021
28 Jun 2021
60 days
Amount
55.1.a : Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. <br> By Manual Means.Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. By Manual Means.
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3 : Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
10.3 : Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactorMaintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
10.11 : Removal of earth from the choked hill side drain and disposing it on the valley side manuallyRemoval of earth from the choked hill side drain and disposing it on the valley side manually
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
NIYAS P.M.
Biju K.P.
Bidder Name
PUKUDIYIL CONSTRUCTIONS
Biju K.P.
NIYAS P.M.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_607189.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .