Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.5 LAccepted-AOC COAL INDIA | KORBA | CHHATTISGARH | 495452 | ₹1.5 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.6 L+₹9,640.76 (6.61%)Rejected-Finance AT MATIGARH PO NADKHURKEE DIST DHANBAD JHARKHAND 828307 | DHANBAD | JHARKHAND | 828307 | ₹1.6 L+₹9,640.76 (6.61%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.6 L+₹11,563.61 (7.93%)Rejected-Finance AT GIRISH TAKIES KALYANPUR DIST JAMUI PIN 811307 | JAMUI | BIHAR | 811307 | ₹1.6 L+₹11,563.61 (7.93%) | L-3 | Rejected-Finance L-3 |
Tender Value
₹1.6 L
EMD Value
₹2,000
Closing Date
13 Feb 2026, 6:00 pmClosed
General Manager, Block-II Area, BCCL
Office of the General Manager, Block-II Area, BCCL
Repairing of switch room at keshargarh ABOCP mine under Block II Area
2026_BCCL_352292_1
GM/BII/CIVIL/E-TENDER/25-26/58 Dt 03.02.2026
Open Tender
Civil Works - Buildings
Percentage
26 days
Block II Area
AS PER NIT
3 documents required · 3 mandatory
₹2,000
10 Sept 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
3 Feb 2026 - 8 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 49.56 | M3 | 214.15 | ₹10,613.27 |
| 2 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.) | 0.44 | M3 | 1,292.2 | ₹568.57 |
| 3 | 4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 0 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.63 | M3 | 5,592.8 | ₹3,523.46 |
| 4 | Supplying and filling stone dust | 1.79 | M3 | 919.05 | ₹1,640.5 |
| 5 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 upto plinth level Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.98 | M3 | 5,002.05 | ₹14,906.11 |
| 6 | Brick work with clay flyash F.P.S. bricks - cls design. 7.5 in superstructure above plinth level up to floor level in : CM 1:6 (1 cement : 6 coarse sand) | 10.88 | M3 | 5,483.47 | ₹59,660.15 |
| 7 | 15.7.4 Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 0 Hot rolled deformed bars | 8.32 | M3 | 1,232.8 | ₹10,256.9 |
| 8 | 13.1.2 12 mm cement plaster of mix : 1:6 | 66.23 | M2 | 222 | ₹14,703.06 |
| 9 | 10.2 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 119.06 | kg | 88.2 | ₹10,501.09 |
| 10 | Fixing of G.S Sheet roofing of 0.63 mm thick | 24.6 | M2 | 253.54 | ₹6,237.08 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.40 MB
BOQ_365127.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .