Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.7 L
EMD Value
₹3,500
Closing Date
25 Nov 2026, 5:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ACE Govindpur area
GM office, Bilbera, sonardih
Installation of portable toilet at 6 location under Govindpur area
2026_BCCL_368861_1
BCCL/AR III/GM/ACE/E-NIT/ 26-27/135/ 6406-6431
Open Tender
Civil Works - Others
Percentage
28 days
Govindpur ARea
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
16 Nov 2026
16 Nov 2026
27 Nov 2026
16 Nov 2026
25 Nov 2026
16 Nov 2026
16 Nov 2026 - 25 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Civil work | - | - | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 7.4 | cum | 214.15 | ₹1,584.71 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 0.34 | cum | 1,292.2 | ₹439.35 |
| 5 | Brick soling | 0.46 | sqm | 243.12 | ₹111.84 |
| 6 | 25 mm PS Flooring | 2.6 | sqm | 325.23 | ₹845.6 |
| 7 | 12 mm cement plaster finished with a floating coat of neat cement of mix :
1:4 (1 cement: 4 fine sand) | 17.33 | sqm | 288.25 | ₹4,995.37 |
| 8 | Providing, hcisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.46 | cum | 7,886.35 | ₹3,627.72 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 32.02 | kgs | 75.65 | ₹2,422.31 |
| 10 | Brick work with modular extruded brun fly ash clay sewer bricks (Confirming to IS 4885) in cement mortar 1:6 (1 cement : 6 coarse sand) in foundation and plinth cement mortar 1:6 (1 cement: 6 coarse sand) | 3.31 | cum | 4,602.5 | ₹15,234.28 |
| 11 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in :cement mortar 1:4 (1 cement : 4 coarse sand) | 1.3 | sqm | 666.8 | ₹866.84 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.75 MB
BOQ_381849.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .