Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | ₹7.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.2 LRejected-AOC SHEESHMAHAL KATHGODAM ALMORA | ₹7.2 L | L2 | Rejected-AOC L2 |
| 3 | L3₹7.3 LRejected-AOC DURGA CITY CENTER BHOTIYA PAARAW HALDWANI DISTT NAINITAL | NAINITAL | UTTARAKHAND | 244715 | ₹7.3 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | GURUKRIPA ENGINEERS AND CONTRACTORS L1 | MAA JAGDAMBA TRADERS L3 | J D M ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of Top Channel Clamp SP-23 with N&B | 40 | Nos | 199 ₹7,960 | 205 ₹8,200 | 200 ₹8,000 |
| 2.00 | Supply of Holding Clamp SP-23 with N&B | 55 | Nos | 199 ₹10,945 | 205 ₹11,275 | 201 ₹11,055 |
| 3.00 | Supply of Stay Clamp S/E SP-23 with N&B | 25 | Nos | 223 ₹5,575 | 230 ₹5,750 | 225 ₹5,625 |
| 4.00 | Supply of Stay Clamp D/E SP-23 with N&B | 55 | Nos | 249 ₹13,695 | 255 ₹14,025 | 252 ₹13,860 |
| 5.00 | Supply of Top Bracing set Clamp for SP-23 with N&B | 60 | Nos | 224 ₹13,440 | 230 ₹13,800 | 226 ₹13,560 |
| 6.00 | Supply of Bottom Bracing set Clamp for SP-23 with N&B | 60 | Nos | 249 ₹14,940 | 255 ₹15,300 | 252 ₹15,120 |
| 7.00 | Supply of Earth wire Clamp for SP-23 with N&B | 40 | Nos | 229 ₹9,160 | 236 ₹9,440 | 235 ₹9,400 |
| 8.00 | Supply of 11KV Cable J/Kit 3x70 Sq.mm. O/D type (3M Make) | 3 | Nos | 6,495 ₹19,485 | 6,520 ₹19,560 | 6,510 ₹19,530 |
| 9.00 | Supply of 11KV Cable J/Kit 3x70 Sq.mm. I/D type (3M Make) | 3 | Nos | 5,995 ₹17,985 | 6,075 ₹18,225 | 6,050 ₹18,150 |
| 10.00 | Supply of LT Shakle Insulator with N&B | 200 | Nos | 99 ₹19,800 | 111 ₹22,200 | 110 ₹22,000 |
Tender Value
₹7.1 L
EMD Value
₹28,300
Closing Date
11 Feb 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer, EDD, UPCL, Almora
Supply and construction of HT/LT and transformers for giving service connection in Lamgara section of EDSD II Almora under UERC Head 2025-26
2026_UPCL9_91268_1
23/2025-26/EDD(A)
Open Tender
Electrical Works
90 days
Almora
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer EDD UPCL
₹28,300
1 Jun 2026
23 Jan 2026
12 Feb 2026
23 Jan 2026
11 Feb 2026
23 Jan 2026
Supply of Top Channel Clamp SP-23 with N&B
Supply of Holding Clamp SP-23 with N&B
Supply of Stay Clamp S/E SP-23 with N&B
Supply of Stay Clamp D/E SP-23 with N&B
Supply of Top Bracing set Clamp for SP-23 with N&B
Supply of Bottom Bracing set Clamp for SP-23 with N&B
Supply of Earth wire Clamp for SP-23 with N&B
Supply of 11KV Cable J/Kit 3x70 Sq.mm. O/D type (3M Make)
Supply of 11KV Cable J/Kit 3x70 Sq.mm. I/D type (3M Make)
Supply of LT Shakle Insulator with N&B
Supply of LT Clamp for SP-21 with N&B
Supply of LT Stay Clamp for SP-21 with N&B
Supply of LT Earth Clamp for SP-21 with N&B
Supply of LT Clamp for SP-10 with N&B
Supply of LT Stay Clamp for SP-10 with N&B
Supply of LT Earth Clamp for SP-10 with N&B
Supply of Nut & Bolt180x16
Motarable Cartage of ST Pole SP-23/21 (bottom portion hot dip)Dist 50-70 Km
Motarable Cartage of ST Pole SP-10 (bottom portion hot dip) Dist 50-70 Km
Motarable Cartage of 11/0.4 KV 100 KVA New Lead distance 2 Km.
Motarable Cartage of 11/0.4 KV 63 KVA New Lead distance 2 Km.
Motarable Cartage of 11/0.4 KV 25 KVA New Lead distance 2 Km.
Motarable Cartage of Small Material Lead distance 2 Km.
Head load cartage ST Pole SP-23/21 (bottom portion hot dip) Lead distance 2 Km.
Head load cartage of ST Pole SP-10 (bottom portion hot dip) Lead distance 2 Km.
Head load cartage of 11/0.4 KV 100 KVA New Lead distance 2 Km.
Head load cartage of 11/0.4 KV 63 KVA New Dist 50-70 Km
Head load cartage of 11/0.4 KV 25 KVA New Dist 50-70 Km
Head load cartage of Small Material Dist 50-70 Km
Dismentling 11/0.4 KV 63 KVA New
Dismentling 11/0.4 KV 25 KVA New
Excavation of earth for pole pit for errection of pole
Excavation of earth for pole pit for errection of pole
Excavation of earth for Stay pit for errection of pole
Erection of Four Poles of SP-23
Erection of Double Poles of SP-23
Erection of Single Poles of SP-23/21
Erection of Single Poles of SP-10
Grouting of Pole in CC Ratio 1:4:8
Muffing of Pole in CC 1:3:6 Block 45CM Height
Fuixing of 11 KV Stay with Pole as per RESPO
Fuixing of LT Stay with Pole as per RESPO
Grouting of stay in CC 1:4:8 including cost of Cement, Sand, Stone
Febrication of MS Channel/MS Angle
Looping & Chooping and cutting of Tree
Laying stringging and Resagging of 11 KV line
Laying of 3P 4WLT Line (Weasel)
Laying of 1P 2WLT Line (Weasel)
Laying of LT AB Cable upto 1x25 Sqmm
Laying of LT AB Cable upto 3x25 Sqmm
Installation 11/0.4 KV 100 KVA New
Installation 11/0.4 KV 63 KVA New
Installation 11/0.4 KV 25 KVA New
Jointing and fixing of cable J/kit heatshrinkable
Installation of 11 KV PRMC
Installation of LT PRMC
Making T-Off 11 KV
Guarding of 11 KV line
Mounting and fixing of TPMO in D/P with making all connection
Mounting and fixing of Fuse Set in D/P with making all connection
Mounting and fixing of LA (Set of 3) in D/P with all respect
Laying of LT Cable of All size
Erection of Earthing Rod
Laying of 11 KV Cable of all size
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_108099.xls
BOQ • 0.26 MB
TENDERDOCUMENT202526.pdf
Tender Documents • 7.06 MB
Download all tender documents and submit your bid