Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71,000Qualified PLOT NO 860 1 SARDHARA ENGINE MANUFATURERS 5 11 AJI INDUSTRIAL AREA VILLAGE TOWN AJI INDUSTRIAL AREA CITY RAJKOT | L1 | Qualified MSE, Category: General | |
| 2 | L2₹80,580+₹9,580 (13.5%)Qualified 1 B RAJENDRA ESTATE KHERALU ROAD VISNAGAR MAHESANA GUJARAT 384315 | MAHESANA | GUJARAT | 384315 | L2 | Qualified | |
| 3 | L3₹89,500+₹18,500 (26.1%)Qualified 12 C 10 MUMBAI MUMBAI MAHARASHTRA 400092 | MUMBAI SUBURBAN | MAHARASHTRA | 400092 | L3 | Qualified | |
| 4 | L4₹89,980+₹18,980 (26.7%)Qualified 2 J 18 TEACHERS COLONY MAHAVEER NAGAR III CIRCLE KOTA RAJASTHAN KOTA KOTA RAJASTHAN 324009 UDYAM RJ 24 0085826 | KOTA | RAJASTHAN | 324009 | L4 | Qualified | |
| 5 | L5₹1.1 L+₹36,500 (51.4%)Qualified AHMADABAD GUJARAT 382430 INDIA | AHMADABAD | GUJARAT | 382430 | L5 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
15 Jul 2025, 1:00 pmClosed
Submersible Sewerage Pump (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Bidder Turnover
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6419606 Dated : 05-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8051585
GEM/2025/B/6419606
Two Packet Bid
Submersible Sewerage Pump (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Bidder Turnover
21 days
Kumar Hande324002office of DyCMM, wagon Repair Shop
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
Exempted
5 Jul 2025
5 Jul 2025
15 Jul 2025
Submersible Sewerage Pump (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Bidder Turnover
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6419606 Dated : 05-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8051585.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .