Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrQualified OFFICE NO 20 0 RATNA BUSINESS SQUARE OPP HK COLLAGE 4TH VILLAGE TOWN ASHRAM ROAD CITY AHMEDABAD AHMADABAD GUJARAT 380009 INDIA | AHMADABAD | GUJARAT | 380009 | ₹1.1 Cr | L1 | Qualified MSE, MII, Category: General |
| 2 | L2₹1.4 Cr+₹32.1 L (28.6%)Qualified | ₹1.4 Cr+₹32.1 L (28.6%) | L2 | Qualified MII |
| 3 | L3₹1.6 Cr+₹44.2 L (39.5%)Qualified | ₹1.6 Cr+₹44.2 L (39.5%) | L3 | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
₹52,500
Closing Date
26 May 2023, 8:00 pmClosed
Comprehensive AMC and operation for 110 KLD STP Plant 3
4775946
GEM/2023/B/3455242
Two Packet Bid
Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam
20 days
Gujarat; Gandhinagar
Total value wise evaluation
BOQ
3 documents required · 3 mandatory
3 yrs
₹3
₹52,500
2 Jun 2023
16 May 2023
26 May 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam Gandhinagar | Operation and Maintenance of Sewage Treatment Plant (STP) through Plant Operator (in 3 Shifts) for running the STP on all days including sundays & holidays etc. as required. All the equipments and accessories, pipings, Control valves, air blowers, inlet, outlet, overflow, vent, manhole covers, drain channel with M.S. gratings, sump to house pumps, chambers cleaning etc. complete to be maintained including chlorine dosing in STP as per guidelines of G.P.C.B. all complete as per the direction of EIC. (Pump Operator (Skilled) - 03 Nos. in 03 Shifts) - Year 1 - Month 1 | 1 | Month | [email protected] | 20 |
| 2 | Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam Gandhinagar | Operation and Maintenance of Sewage Treatment Plant (STP) through Plant Operator (in 3 Shifts) for running the STP on all days including sundays & holidays etc. as required. All the equipments and accessories, pipings, Control valves, air blowers, inlet, outlet, overflow, vent, manhole covers, drain channel with M.S. gratings, sump to house pumps, chambers cleaning etc. complete to be maintained including chlorine dosing in STP as per guidelines of G.P.C.B. all complete as per the direction of EIC. (Pump Operator (Skilled) - 03 Nos. in 03 Shifts) Year 1 - Month 2 | 1 | Month | [email protected] | 20 |
| 3 | Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam Gandhinagar | Operation and Maintenance of Sewage Treatment Plant (STP) through Plant Operator (in 3 Shifts) for running the STP on all days including sundays & holidays etc. as required. All the equipments and accessories, pipings, Control valves, air blowers, inlet, outlet, overflow, vent, manhole covers, drain channel with M.S. gratings, sump to house pumps, chambers cleaning etc. complete to be maintained including chlorine dosing in STP as per guidelines of G.P.C.B. all complete as per the direction of EIC. (Pump Operator (Skilled) - 03 Nos. in 03 Shifts) Year 1 - Month 3 | 1 | Month | [email protected] | 20 |
| 4 | Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam Gandhinagar | Operation and Maintenance of Sewage Treatment Plant (STP) through Plant Operator (in 3 Shifts) for running the STP on all days including sundays & holidays etc. as required. All the equipments and accessories, pipings, Control valves, air blowers, inlet, outlet, overflow, vent, manhole covers, drain channel with M.S. gratings, sump to house pumps, chambers cleaning etc. complete to be maintained including chlorine dosing in STP as per guidelines of G.P.C.B. all complete as per the direction of EIC. (Pump Operator (Skilled) - 03 Nos. in 03 Shifts) Year 1 - Month 4 | 1 | Month | [email protected] | 20 |
| 5 | Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam Gandhinagar | Operation and Maintenance of Sewage Treatment Plant (STP) through Plant Operator (in 3 Shifts) for running the STP on all days including sundays & holidays etc. as required. All the equipments and accessories, pipings, Control valves, air blowers, inlet, outlet, overflow, vent, manhole covers, drain channel with M.S. gratings, sump to house pumps, chambers cleaning etc. complete to be maintained including chlorine dosing in STP as per guidelines of G.P.C.B. all complete as per the direction of EIC. (Pump Operator (Skilled) - 03 Nos. in 03 Shifts) Year 1 - Month 5 | 1 | Month | [email protected] | 20 |
| 6 | Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam Gandhinagar | Operation and Maintenance of Sewage Treatment Plant (STP) through Plant Operator (in 3 Shifts) for running the STP on all days including sundays & holidays etc. as required. All the equipments and accessories, pipings, Control valves, air blowers, inlet, outlet, overflow, vent, manhole covers, drain channel with M.S. gratings, sump to house pumps, chambers cleaning etc. complete to be maintained including chlorine dosing in STP as per guidelines of G.P.C.B. all complete as per the direction of EIC. (Pump Operator (Skilled) - 03 Nos. in 03 Shifts) Year 1 - Month 6 | 1 | Month | [email protected] | 20 |
| 7 | Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam Gandhinagar | Operation and Maintenance of Sewage Treatment Plant (STP) through Plant Operator (in 3 Shifts) for running the STP on all days including sundays & holidays etc. as required. All the equipments and accessories, pipings, Control valves, air blowers, inlet, outlet, overflow, vent, manhole covers, drain channel with M.S. gratings, sump to house pumps, chambers cleaning etc. complete to be maintained including chlorine dosing in STP as per guidelines of G.P.C.B. all complete as per the direction of EIC. (Pump Operator (Skilled) - 03 Nos. in 03 Shifts) Year 1 - Month 7 | 1 | Month | [email protected] | 20 |
| 8 | Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam Gandhinagar | Operation and Maintenance of Sewage Treatment Plant (STP) through Plant Operator (in 3 Shifts) for running the STP on all days including sundays & holidays etc. as required. All the equipments and accessories, pipings, Control valves, air blowers, inlet, outlet, overflow, vent, manhole covers, drain channel with M.S. gratings, sump to house pumps, chambers cleaning etc. complete to be maintained including chlorine dosing in STP as per guidelines of G.P.C.B. all complete as per the direction of EIC. (Pump Operator (Skilled) - 03 Nos. in 03 Shifts) Year 1 - Month 8 | 1 | Month | [email protected] | 20 |
| 9 | Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam Gandhinagar | Operation and Maintenance of Sewage Treatment Plant (STP) through Plant Operator (in 3 Shifts) for running the STP on all days including sundays & holidays etc. as required. All the equipments and accessories, pipings, Control valves, air blowers, inlet, outlet, overflow, vent, manhole covers, drain channel with M.S. gratings, sump to house pumps, chambers cleaning etc. complete to be maintained including chlorine dosing in STP as per guidelines of G.P.C.B. all complete as per the direction of EIC. (Pump Operator (Skilled) - 03 Nos. in 03 Shifts) Year 1 - Month 9 | 1 | Month | [email protected] | 20 |
| 10 | Comprehensive Annual Maintenance Contract for 3 Numbers of 110 KLD STPs at RRU campus Lavad Dehgam Gandhinagar | Operation and Maintenance of Sewage Treatment Plant (STP) through Plant Operator (in 3 Shifts) for running the STP on all days including sundays & holidays etc. as required. All the equipments and accessories, pipings, Control valves, air blowers, inlet, outlet, overflow, vent, manhole covers, drain channel with M.S. gratings, sump to house pumps, chambers cleaning etc. complete to be maintained including chlorine dosing in STP as per guidelines of G.P.C.B. all complete as per the direction of EIC. (Pump Operator (Skilled) - 03 Nos. in 03 Shifts) Year 1 - Month 10 | 1 | Month | [email protected] | 20 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_4775946.pdf
GEM_BID
rru_stp_tender_nit_2023-05-16-18-36-15_44eda22041f0be6bbe92b2813b47fc78.pdf
BOQ
boq_rru_stp_2023-05-16-18-36-15_397aeb7227f1ea676f0eee51e246bb40.csv
BOQ
1684243712.xlsx
OTHER
580d12cb59c2494cf7853e3969692fa5.pdf
OTHER
aaf09b56d21b74e7cb77843ab4de0575.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .