Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC work allotted |
| 2 | L1₹1.1 CrRejected-Finance VILL NIZ KAURBAHA P O BARGHULI P S TAMULPUR BAKSA BTAD ASSAM PIN 781367 | BAKSA | ASSAM | 781367 | ₹1.1 Cr | L1 | Rejected-Finance work not allotted to another bidder |
| 3 | L1₹1.1 CrRejected-Finance | ₹1.1 Cr | L1 | Rejected-Finance work not allotted to another bidder |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
2 Mar 2024, 1:00 pmClosed
SE, Kokrajhar Circle, Irrigation, Kokrajhar
SE, Kokrajhar Circle, Irrigation, Kokrajhar
Protection work at Syphon of main canal at ch. 250.00m of Dhansiri Irrigation Project (M) for the year 2023-24
2024_ID_36321_1
CHDI/ ET-24/2022-23/30
Open Tender
Civil Works
Works
180 days
Udalguri
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,400
₹2.4 L
Yes
16 Mar 2024
16 Feb 2024
4 Mar 2024
16 Feb 2024
2 Mar 2024
16 Feb 2024
Amount
Toe Wall and CC Block Item No. 1 : Labour for dismantling of old CC work and stacking the spoils at suitable place including local carriage, complete as directed
Item No. 2 : Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified
Item No. 3 : C work in proportion 1:4:8 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No. 4 : CC work in proportion 1:3:6 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 5 : CC work in proportion 1:3:6 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with dewatering necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 5 : Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). ii) with 38 mmm thick wood plank
Slope Protection Item No. 1 : Labour for dismantling of old CC work and stacking the spoils at suitable place including local carriage, complete as directed
Item No. 2 : C work in proportion 1:4:8 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No. 3 : CC work in proportion 1:3:6 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 4 : Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered) ii) with 38mm thcik wood plank
Item No. 5 : Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage llowance from the gross quantity).
Diversion Channel and Closing Bund Item No. 1 : Earth work in excavation in diversion/ Feeder channel to the designed section and grade by depositing the spoils in the form of embankment on either side in layers not exceeding 15 cm thick including clearing light jungles, Removing trees up to 15 cm dia and uprooting roots and stumps etc. from the seat of embankment and canal and free from all vegetation including breaking clods to not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water where necessary complete as directed.
Item No. 2 : Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Approach road cum embankment Item No. 1 :Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Item No. 2 : Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and complete as directed
Item No. 3 : Labour charge for spreading of hard river gravel or broken stone of size 13 mm to 38 mm to the required thickness including dressing and ramming the seat before laying the materials as directed with a lead upto 30 M and lift upto 1.5 M complete as directed.
Hand Railing Item No. 1 : Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified
Item No. 2 : work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 3 :RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering,scaffolding cost will be paid separately).
Item No. 4 : Supplying fitting fixing and laying reinforcement (TATA)in position in RCC work including cutting, bending,cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No. 5 : Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered) ii) with 38mm thick wood plank
Item No. 6 : 12 mm cement plastering including clearing surface and curing, complete as directed.
Item No. 7 : Supplying 1 1/2" dia GI pipe for hand railing including fitting & fixing the same in position etc, complete as directed
Suresh Narzary
Sri Somla daimary
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .