Loading…
Loading…
Tender Value
₹13.9 Cr
EMD Value
₹27.8 L
Closing Date
1 Sept 2026, 3:30 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Revenue
CARRIAGE
15 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-J, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Bid Capacity: Available Bid Capacity = [A x N x 2] - 0.33xNxB Where, A = Maximum value of construction works executed and payment received in any one of the previous three financial years or the current financial year (up to date of inviting tender), taking into account the completed as well as works in progress. N= Number of years prescribed for completion of work for which bids has been invited. B = Existing commitments and balance amount of ongoing works with tenderer as per the prescribed proforma of Railway for statement of all works in progress and also the works which are awarded to tenderer but yet not started upto the date of inviting of tender.
23 conditions · 10 needing a document upload
National Electronic Funds Transfer Mandate Form Annexure-I
Annexure H List of Engineers/Personnel available / proposed to be employed for deployment of this work &List of plant and machinery available on hand (own) and proposed to be inducted (own &hired to be given separately) for the subject work.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Annexure II- A filled up, signed and stamped with all the details and also upload the relevant documents i.e. completion certificates carrying all the details of the similar works contracts completed. Own separate Sheet may also be used to fill the details.
If partnership firm is participating then all the documents mentioned in Annexure D & E of the tender document has to be uploaded.
An option for the contractor to take payment from Railways through a letter of credit (LC) arrangement as per railway bd letter no.No.2018/CE-T/9 New Delhi, Dated 04.06.2018
It is responsibility of the tenderer that they ensure to see any corrigendum of the tender to check the corrigendum on the IREPS website from time to time.
All General Conditions of Contract of Indian Railways- April-2022 with up to date correction slips as applicable. The tenderer is expected to be familiar with the General Conditions of Contract of Indian Railways and it is their responsibility. However, some special features are given here for guidance of the tenderer.
16.TENDERER'S CREDENTIALS:- Documents testifying tenderer's previous experience and financial status should be produced along with the tender or when desired by competent authority. Tenderer(s) who has/have not carried out any work so far on this Railway and who is/are not borne on the approved list of the Contractors of Northern Railway should submit along with his/their tender credentials to establish. (i) His capacity to carry out the works satisfactorily. (ii) His financial status supported by Bank reference and other documents. (iii) Certificates duly attested and testimonials regarding contracting experience for the type of job for which tender is invited with list of works carried out in the past.
The tenderer shall upload signed scanned copies of mandatory credentials such as experience, turn over Certificates and any other documents as applicable.
It is responsibility of the tenderer that they ensure to see any corrigendum of the tender to check the corrigendum on the IREPS website from time to time.
REFER TO TENDER DOCUMENT FOR COMPLETE INFORMATION ALL THE TERMS AND CONDITIONS OF CONTRACT, SCOPE OF WORK, SCHEDULE OF RATES DETAILS AND SPECIAL CONDITIONS OF CONTRACTS
Work of Supply and Apply of PU based Wet on Wet applicable exterior painting system (as per scope) for ICF & LHB AC/NON AC design coaches in the premises of Carriage and Wagon Workshop, Jagadhri Workshop Northern Railway for 24 months
6S-77-TENDER-24-25-JUDWP3~NR
6S-77-TENDER-24-25-JUDWP3
Open
Works - General
24 Months
Yamunanagar, Haryana
₹0
₹27.8 L
11 Aug 2026
11 Aug 2026
18 Aug 2026
9 items across 3 schedules · ₹13,88,36,534.4 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Application Unit Charges per Coach | Numbers | 192.00 | 30,000 | 57,60,000 |
| 2 | Supply Unit Charges per Coach | Numbers | 192.00 | 97,420 | 1,87,04,640 |
| 3 | GST @ 18% | Lumpsum | 1.00 | 44,03,635.2 | 44,03,635.2 |
| Schedule total | ₹2,88,68,275.2 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
REVISEDTD_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].