| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance VILL GADHWAR PO BARA TEHSIL CHACHIOT DISTT MANDI H P 175124 | CHACHIOT | MANDI | HIMACHAL PRADESH | 175124 | ₹4.8 L | L1 | Accepted-Finance Lowest 1 |
| 2 | L2₹5.8 L+₹94,082.35 (19.5%)Rejected-Finance R O VILL P O NAGROTA BAGWAN TEHSIL NAGROTA BAGWAN DISTT KANGRA | KANGRA | HIMACHAL PRADESH | 176001 | ₹5.8 L+₹94,082.35 (19.5%) | L2 | Rejected-Finance Lowest 1 |
Tender Value
₹6.5 L
EMD Value
₹13,100
Closing Date
18 Sept 2026, 10:00 amClosed
Executive Engineer
EE HP PWD Division Tanda at Nagrota Bagwan
Restoration of road damages due to laying of Optical Fibre cable on Nagrota Massal Rajhoon road Km 0/000 to 8/000 in Distt Kangra (HP) (Deposit work) (SH-Construction of 2.00 mtrs span RCC span culvert at RD 5/120).
2026_PWD_143200_2
Nagrota 4953-67
Open Tender
Civil Works - Roads
Percentage
60 days
Nagrota Bagwan
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
₹13,100
25 Sept 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
18 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m (One point five metre) in width or 10 sqm (Ten square metre) on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m (One point five metre), including getting out the excavated soil and disposal of surplus excavated soils complete as per approved drawing, design and as directed by the Engineer-in-charge and as per HPPWD technical specification including carriage of materials within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government. | 41.45 | Per cubic metre | 262.71 | ₹10,889.33 |
| 2 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering .Plain cement concrete 1:3:6 (One Cement : Three coarse sand : Ten graded stone aggregate 20 mm (Twenty millimetres) nominal size complete as per approved drawing, design and as directed by the Engineer-in-charge and as per HPPWD technical specification including carriage of materials within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government. | 5.41 | Per cubic metre | 3,940.68 | ₹21,319.08 |
| 3 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level 1:2:4 (One Cement : Two coarse sand : Four graded stone aggregate 20mm (Twenty millimetres) nominal size complete as per approved drawing, design and as directed by the Engineer-in-charge and as per HPPWD technical specification including carriage of materials within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government. | 98.22 | Per cubic metre | 5,084.75 | ₹4,99,424.15 |
| 4 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 - (m-25) All work up to plinth level : - 1:1.5:3 (One cement : One and Half coarse sand): Three graded stone aggregate 20mm (Twenty millimetres nominal size complete as per approved drawing, design and as directed by the Engineer-in-charge and as per HPPWD technical specification including carriage of materials within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government. | 6.88 | Per cubic metre | 5,296.61 | ₹36,440.68 |
| 5 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level 1:4:8 (One Cement : Four coarse sand) : Eight graded stone aggregate 40 mm (Forty millimetres) nominal size complete and as per drawing and HP.PWD technical specifications, as directed by the Engineer-Incharge including carriage of materials within all leads, lifts and other incidentals. The rate inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government. | 1.58 | Per cubic metre | 3,771.19 | ₹5,958.48 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more complete and as per drawing and HP.PWD technical specifications, as directed by the Engineer-Incharge including carriage of materials within all leads, lifts and other incidentals. The rate inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes excluding GST imposed by the Government. | 906.5 | Per kilo gram | 88 | ₹79,772 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Sbd.pdf
Tender Documents • 7.35 MB
BOQ_212742.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .