Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
14 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Collector/ chairman
II nd floor,DRDA ,collectorate
Clean and Green Village in Package No TN 07 107 of Aravakuruchi Block under AGAMT II 2021-2022 10 Percentage Above deviation work of Karur District
2022_RDTN_249142_11
Karur District - Aravakurichi Block-AGAMT II 21-22
Open Tender
Civil Works
Item Rate
90 days
II nd floor, DRDA, collectorate
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
II nd floor,DRDA ,collectorate
16 Sept 2022
30 Aug 2022
14 Sept 2022
30 Aug 2022
14 Sept 2022
30 Aug 2022
2 Sept 2022
90 days
Amount
Name of the Work : Providing Drainage With soakpit In Magalakshmi garden Rajasekar House to Vijayakumar house @ Lingathuparai H/O Nagampalli
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Supplying and fabricating and placing in position MS or RTS reinforcement works includingcost and conveyance of all materials to site and all labour
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly includingcost and conveyance of all materials to site and all labour
Construction Of Horizontal soakpit sub Estimate
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site
Cost of Supplying 40mm boluders including of all materials
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Collection and supply of Sand Filling appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,,
Towards labour charges for filling materials of 40mm metal and sand including all labour charges for filling etc.complete,,
Name of the Work : Providing Drainage With soakpit In Janatha colony Palanisamy house to Muthusamy house @ Malaikovilur H/O Nagampalli
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:2:4 mix using 20mm metals including cost and conveyence of all mterials to site
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Supplying and fabricating and placing in position MS or RTS reinforcement works includingcost and conveyance of all materials to site and all labour
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly includingcost and conveyance of all materials to site and all labour
Construction Of Horizontal soakpit sub Estimate
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 20mm metals including cost and conveyence of all mterials to site
Cost of Supplying 40mm boluders including of all materials
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Collection and supply of Sand Filling appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,,
Towards labour charges for filling materials of 40mm metal and sand including all labour charges for filling etc.complete,,
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
The VIP Construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .