Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.1 L+₹6,013.82 (0.85%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.5 L+₹50,897.82 (7.23%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹8.3 L+₹1.2 L (17.5%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹8.9 L+₹1.9 L (26.3%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | K RAMACHANDRAN NAIR L4 | Renjith M L2 | Anoop AJ L5 | AMBALATHARA LABOUR CONTRACT L6 | Mohandas M L3 | ARUNDAS Y R L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00pipe line work | |||||||||
| 1.00 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 180 | sqm | 280 ₹50,400 | 100 ₹18,000 Lowest | 354.98 ₹63,896.4 | 362.69 ₹65,284.2 | 200 ₹36,000 | - |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | 6 | cum | 1,260 ₹7,560 | 250 ₹1,500 Lowest | 1,244.16 ₹7,464.96 | 1,271.18 ₹7,627.08 | 1,100 ₹6,600 | 1,588.97 ₹9,533.82 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 360 | cum | 465 ₹1,67,400 | 300 ₹1,08,000 Lowest | 542.82 ₹1,95,415.2 | 554.61 ₹1,99,659.6 | 400 ₹1,44,000 | - |
| 1.00 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 100 | metre | 26 ₹2,600 | 5 ₹500 Lowest | 25.64 ₹2,564 | 26.19 ₹2,619 | 15 ₹1,500 | - |
| 1.00 | 100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes. | 600 | metre | 90 ₹54,000 | 194.55 ₹1,16,730 | 122.97 ₹73,782 | 125.64 ₹75,384 | 60 ₹36,000 Lowest | 157.05 ₹94,230 |
| 1.01 | OD64280/2025-2026:Alteration of house connection from the existing main up to 200mm PVC/AC/CI pipe, boring the main, supplying and fitting suitable specials etc complete and connecting the newly laid main, testing the joints etc complete as per the dirction of Engineer - in charge | 30 | no | 1,650 ₹49,500 | 1,000 ₹30,000 Lowest | 1,879 ₹56,370 | 2,560 ₹76,800 | 1,250 ₹37,500 | 2,399.75 ₹71,992.5 |
| 1.01 | OD64558/2025-2026:Taking connection from the existing main (SINGLE BORING), up to 200mm PVC/AC/CI pipe, boring the main, supplying and fitting suitable specials etc and connecting the newly laid main, testing the joints etc complete. | 2 | no | 1,700 ₹3,400 | 1,000 ₹2,000 Lowest | 2,059.03 ₹4,118.06 | 2,400 ₹4,800 | 1,500 ₹3,000 | - |
| 1.01 | OD64282/2025-2026:TAKING CONNECTION FROM THE EXISTING MAIN (DOUBLE BORING) INCLUDING BORING THE MAIN, SUPPLYING AND FITTING SADDLE PIECE 2 NOS, 25MM BRASS FERULE 2 NOS, 25MM GM FULL WAY WHEEL VALVE 2 NOS, BEND 2 NOS, UNION 2 NOS, 32MM PVC ADAPTER 2 NOS, 110X32 PVC REDUCER 2 NOS, ETC. AND CONNECTING THE NEWLY LAID MAIN TESTING THE JOINTS ETC. COMPLETE | 1 | no | 3,150 ₹3,150 | 2,000 ₹2,000 Lowest | 4,118.07 ₹4,118.07 | 4,800 ₹4,800 | 3,000 ₹3,000 | 5,259.35 ₹5,259.35 |
| 1.01 | OD64279/2025-2026:Construction of valve chamber 1.30 m x 1.30 m, earth work excavation by mechanical means in foundation trenches including Steel reinforcement, concreting, centering, shuttering all labour charges , material charges, etc complete | 5 | no | 24,100 ₹1,20,500 | 5,000 ₹25,000 Lowest | 23,559.61 ₹1,17,798.05 | 24,000 ₹1,20,000 | 27,000 ₹1,35,000 | 16,088.9 ₹80,444.5 |
Tender Value
₹11.4 L
EMD Value
₹28,394
Closing Date
21 Jul 2025, 3:00 pmClosed
Executive Engineer
O/o Executive Engineer, PH Division(South), Tvpm
DEPOSIT URBAN AGGLOMERATION PHASE 4 2024 2025 Punchakkari Ward Laying new pipe line and allied works at various places under Vandithadam Section Pipeline Work
2025_KWA_775865_1
TR/14397/2025_26_1_1/1
Open Tender
Civil Works - Water Works
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,760
₹28,394
Yes
7 Nov 2025
10 Jul 2025
22 Jul 2025
10 Jul 2025
21 Jul 2025
10 Jul 2025
10 Jul 2025 - 21 Jul 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1268288.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .