Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.6 LAccepted-AOC | ₹7.6 L | 1 | Accepted-AOC 1 |
| 2 | 2₹8.0 LRejected-AOC | ₹8.0 L | 2 | Rejected-AOC 2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| 4 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | MUHAMMED SHAFEEQ L4 | Muhammed Shafi vemmully L3 | KHALID KURIKKAL L2 | BIJU K L1 |
|---|---|---|---|---|---|---|---|
| 1.00Fencing | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 29.18 | cum | 298.84 ₹8,718.66 | 289.28 ₹8,439.74 | 281.99 ₹8,227.06 | 269.25 ₹7,855.37 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 243.75 | sqm | 337.42 ₹82,246.13 | 326.62 ₹79,613.63 | 318.39 ₹77,607.56 | 304.02 ₹74,104.88 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 27.24 | cum | 8,040.94 ₹2.2 L | 7,783.63 ₹2.1 L | 7,587.43 ₹2.1 L | 7,244.89 ₹2.0 L |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 12 | cum | 8,642.34 ₹1.0 L | 8,365.79 ₹1.0 L | 8,154.91 ₹97,858.92 | 7,786.75 ₹93,441 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,451.88 | kilogram | 98.92 ₹1.4 L | 95.75 ₹1.4 L | 93.34 ₹1.4 L | 89.13 ₹1.3 L |
| 1.01 | 16.17.1:Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used .With G.I barbed wire | 2,100 | metre | 14.23 ₹29,883 | 13.77 ₹28,917 | 13.43 ₹28,203 | 12.82 ₹26,922 |
| 1.01 | OD514438/2024-2025:60.7.1. DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 10.91 | cum | 3,513.36 ₹38,330.76 | 3,400.93 ₹37,104.15 | 3,315.21 ₹36,168.94 | 3,165.54 ₹34,536.04 |
| 1.01 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 8.48 | cum | 7,216.85 ₹61,227.76 | 6,985.91 ₹59,268.46 | 6,809.82 ₹57,774.51 | 6,502.38 ₹55,166.19 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 520 | kg | 155.15 ₹80,678 | 150.19 ₹78,098.80 | 146.4 ₹76,128 | 139.79 ₹72,690.80 |
Tender Value
₹8.4 L
EMD Value
₹21,120
Closing Date
3 Apr 2025, 6:55 pmClosed
ASSISTANT EXECUTIVE ENGINEER
LID EW Subdivision Perinthalmanna, Perinthalmanna BP
Annual Plan 2024 25 Perinthalmanna Block Panchayath Pro No 72 25 Block Panchayath Vyavasaya Park Adisthana Saukaryam Orukkal General Civil Work
2025_LSGD_755474_1
AE/LSGD/PMNA BP/ETN09/2024-25
Open Tender
Civil Works - Others
365 days
PERINTHALMANNA
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,865
Yes
₹21,120
Yes
29 Jan 2026
27 Mar 2025
5 Apr 2025
27 Mar 2025
3 Apr 2025
27 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1226816.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid