Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 2 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 3 | Accepted-Technical | Accepted-Technical Technically Qualified |
Tender Value
₹83.4 L
EMD Value
₹50,000
Closing Date
22 Jul 2026, 5:00 pmClosed
Manager (PED)
STEEL INDUSTRIALS KERALA LTD.ATHANI P.O,THRISSUR- 680 581
AMRUT-2.0 - Kunnath Chola Pond Renovation and Improvement of Kunnath Chola Tourism Project at Kondotty Municipality-(Project No. 15177)
2026_SILK_860748_1
SILK/PED/ S-033/2026-27/839
Open Tender
Miscellaneous Works
Item Rate
360 days
Kondotty
As per the tender documents
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
28 Jul 2026
15 Jul 2026
23 Jul 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
15 Jul 2026 - 22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX -A | |||||
| 1.01 | OD353895/2025-2026
BAILING OUT WATER USING PUMP ABOVE 20HP AND UP TO 30HP -Bailing out water with engine and pump set above 25HP and up to 30HP, including cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | hour | - | - |
| 1.02 | 15.9.2
Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50
metres lead as per direction of Engineer -in- Charges:In cement mortar | - | cum | - | - |
| 1.03 | 15.40.1
Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead:Thickness upto 40 mm | - | sqm | - | - |
| 1.04 | OD87574/2026-2027
DR with Departmental stone DRY RUBBLE MASONRY-Dry rubble with out concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc complete as per direction of Departmental officers at site. | 1 | cum | - | - |
| 1.05 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.06 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 0.4 | cum | - | - |
| 1.07 | 4.1.6
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.08 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.09 | 4.1.3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.8 | cum | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
GCC.pdf
Tender Documents • 0.23 MB
PROFILE.pdf
Additional Documents • 0.03 MB
BOQ_1455583.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .