Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | NIYAS BABU K L1 | MOHAMMED ALI P.T. L2 |
|---|---|---|---|---|---|
| 1.00compound wall | |||||
| 1.00 | OD156219/2024-2025:DISMANTLING laterite masonry - Dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in laterite masonry in cement mortar disposal of debris within a distance of 150m. | 7.85 | cum | 1,414.87 ₹11,106.73 Lowest | 1,414.87 ₹11,106.73 Lowest |
| 1.00 | OD156231/2024-2025:DISMANTLING DR - Dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 6.17 | cum | 619.01 ₹3,818.67 Lowest | 619.01 ₹3,818.67 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 3.04 | cum | 298.84 ₹909.67 Lowest | 298.84 ₹909.67 Lowest |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 87.6 | sqm | 721.7 ₹63,220.92 Lowest | 721.7 ₹63,220.92 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 1.52 | cum | 6,857.6 ₹10,437.27 Lowest | 6,857.6 ₹10,437.27 Lowest |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 20.93 | cum | 7,256.34 ₹1,51,889.71 Lowest | 7,256.34 ₹1,51,889.71 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 732.62 | kilogram | 98.92 ₹72,470.77 Lowest | 110 ₹80,588.2 |
| 1.01 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 6.69 | cum | 7,216.85 ₹48,266.29 Lowest | 7,216.85 ₹48,266.29 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 75.2 | sqm | 316.08 ₹23,769.22 Lowest | 316.08 ₹23,769.22 Lowest |
Tender Value
₹5.5 L
EMD Value
₹13,750
Closing Date
27 Feb 2025, 4:00 pmClosed
Assistant Engineer
O/o Assistant Engineer , LID EW Section Mampad
Annual Plan Mampad GP 2024 25 Vadapuram GLP School Improvements project no 578 Ward no 3 General Civil Work
2025_LSGD_740707_1
TN4/AE/LIDEW/MPD/2024-25
Open Tender
Civil Works - Others
Item Wise
365 days
Mampad
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,215
Yes
₹13,750
Yes
20 Nov 2025
20 Feb 2025
1 Mar 2025
20 Feb 2025
27 Feb 2025
20 Feb 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .