Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance 0 ADITYA ENTERPRISES 0 UNNAO HARDOI ROAD KISHORI KHERA UNNAO UTTAR PRADESH UNDER NAGAR PALIKA UNNAO UTTAR PRADESH 209801 | UNNAO | UTTAR PRADESH | 209801 | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 LAdmitted-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | ₹4.7 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | - | Rejected-Technical Technically rejected |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 | coalfields engineering works L2 |
|---|---|---|---|---|---|
| 1.00 | Cost of DGC Copper Wire/Strip with Insulation, Labour, Contractor profit and Less scrap value for 180 KW, 3.3 KV HT Motor | 60 | Coil | 3,049.94 ₹1.8 L | 3,134.66 ₹1.9 L |
| 2.00 | Cost of Moulding of one coil with Craption, nomax and mica for 180 KW, 3.3 KV HT Motor | 60 | Coil | 1,944 ₹1.2 L | 1,998 ₹1.2 L |
| 3.00 | Dala housing welding and machining to bearing size for 180 KW, 3.3 KV HT Motor | 2 | Nos | 16,794 ₹33,588 | 17,260 ₹34,520 |
| 4.00 | Cost of DGC Copper wire with Insulation, Labour, Contractor profit and Less scrap valuefor 90 KW, 550V LT Motor | 72 | Kg. | 1,218.18 ₹87,708.96 | 1,252.02 ₹90,145.44 |
| 5.00 | Rotor Shaft Bearing housing welding and machining to bearing size for 90 KW, 550V LT Motor | 1 | No. | 16,535 ₹16,535 | 16,994 ₹16,994 |
| 6.00 | Cost of Lid with Lug and other req. meterials for 90 KW, 550V LT Motor | 6 | Nos | 3,448 ₹20,688 | 3,544 ₹21,264 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | No | - | - |
Updated dates
Tender Value
Refer Docs
EMD Value
₹6,300
Closing Date
13 Apr 2026, 9:00 amClosed
PE EnM
KOCP
Towards repairing, rewinding and maintenance of 01 No 180 KW, 3.3 KV, Induction motor and 01 no. 90KW 550V LT motor Installed at Kedla OCP under Hazaribagh Area
2026_CCL_357903_1
PO/KOCP/EnM/Tender/26-27/01
Open Tender
Electrical and Maintenance Works
30 days
KOCP
As per NIT
2 documents required · 2 mandatory
₹6,300
25 Apr 2026
2 Apr 2026
14 Apr 2026
3 Apr 2026
13 Apr 2026
3 Apr 2026
3 Apr 2026 - 7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of DGC Copper Wire/Strip with Insulation, Labour, Contractor profit and Less scrap value for 180 KW, 3.3 KV HT Motor | 60 | Coil | - | - |
| 2 | Cost of Moulding of one coil with Craption, nomax and mica for 180 KW, 3.3 KV HT Motor | 60 | Coil | - | - |
| 3 | Dala housing welding and machining to bearing size for 180 KW, 3.3 KV HT Motor | 2 | Nos | - | - |
| 4 | Cost of DGC Copper wire with Insulation, Labour, Contractor profit and Less scrap valuefor 90 KW, 550V LT Motor | 72 | Kg. | - | - |
| 5 | Rotor Shaft Bearing housing welding and machining to bearing size for 90 KW, 550V LT Motor | 1 | No. | - | - |
| 6 | Cost of Lid with Lug and other req. meterials for 90 KW, 550V LT Motor | 6 | Nos | - | - |
| 7 | Total impact of GST for the purpose of CTC | - | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.18 MB
BOQ_370781.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid