| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance BALANGIR M I CIRCLE BALANGIR | -18.50% | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 CrAdmitted-Finance AT DAULIPADA PO NUAPADA PS K NUAGAM DIST GANJAM PIN 761011 | GANJAM | ODISHA | 761011 | -18.18% | ₹2.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.3 CrAdmitted-Finance | -14.99% | ₹2.3 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.5 CrAdmitted-Finance AT SAUNTAPUR PO GUDESHIRA PS DIST BARGARH BARGARH | BARGARH | ODISHA | 768027 | -11.22% | ₹2.5 Cr | L4 | Admitted-Finance |
| 5 | L5₹2.6 CrAdmitted-Finance | -5.00% | ₹2.6 Cr | L5 | Admitted-Finance |
Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
31 Jul 2026, 5:00 pmClosed
Circle Officer
RURAL WORKS CIRCLE , SAMBALPUR
Construction of H.L. bridge over Bandhei Nallah at 1st Km on Katabahal to Damkipali road
2026_CERWI_136424_1
Bridge Tender Online RWCSBP-14/2026-27
Open Tender
Civil Works - Bridges
Percentage
365 days
Padampur
2 documents required · 2 mandatory
₹10,000
₹2.8 L
Yes
21 Aug 2026
20 Jul 2026
1 Aug 2026
20 Jul 2026
31 Jul 2026
20 Jul 2026
20 Jul 2026 - 29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in cutting in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Engineer in Charge | 1,142.09 | cum | 235.75 | ₹2,69,246.77 |
| 2 | Earthwork in excavation in foundation in all kinds of soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Engineer in Charge. | 1,910.9 | cum | 388.8 | ₹7,42,956.75 |
| 3 | Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost. , conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work with cess etc complete as per specification & direction of Engineer-in Charge. | 54.72 | cum | 624.75 | ₹34,186.32 |
| 4 | Cement concrete (1:3:6) in foundation & plinth with 4cm. crusher broken granite metal of approved quality from approved quarry including hoisting lowering & laying in layers not exceeding 150mm. thick with proper packing & ramming each layer of concrete by means of vibrator ,providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation & direction of the Engineer-in Charge -In Substructure | 43.11 | cum | 6,294.19 | ₹2,71,342.53 |
| 5 | Cement concrete (1:3:6) in foundation & plinth with 4cm. crusher broken granite metal of approved quality from approved quarry including hoisting lowering & laying in layers not exceeding 150mm. thick with proper packing & ramming each layer of concrete by means of vibrator ,providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation & direction of the Engineer-in Charge -In Foundation | 92.64 | cum | 6,371.46 | ₹5,90,264.8 |
| 6 | Cement concrete of M-150 having maximum compressive strength of 150 kg./cm2 ( test to be conducted) on 150 mm. cubes tested at 28 days including curing (tests conducted in accordance with IS-456 & IS-516) & conforming to clause-302 of IRC 21/1987 using clean crusher broken hard granite coarse aggregate of 40 mm. size down grade of approved quality to be protested in the laboratory) obtained from approved quarry the proportion mix, grading conforming to relevant ISI/IRC codes including hoisting, lowering concrete in layers not exceeding 150 mm. thick each compacting with vibrator watering & curing for 28 days centering shuttering & finishing the exposed surface smooth providing grooves & beads where necessary including cost, conveyance royality & taxes of all labour machineries etc. required for the work complete in all respects including dismantling the centering & shuttering as per specification & direction of Engineer-in-Charge.-In Foundation | 802.61 | cum | 5,994.75 | ₹48,11,440.3 |
| 7 | Reinforced Cement Concrete M 30 Grade using 20mm down graded chips in Foundation and Plinth-In Foundation | 281.39 | cum | 7,294.85 | ₹20,52,727.02 |
| 8 | Reinforced Cement Concrete M 30 Grade using 20mm down graded chips in Foundation and Plinth-Abutment & Pier Shaft | 118.81 | cum | 8,964.45 | ₹10,65,102.16 |
| 9 | Reinforced Cement Concrete M 30 Grade using 20mm down graded chips in Foundation and Plinth-Pier & Abutment cap | 7.64 | cum | 8,964.45 | ₹68,497.36 |
| 10 | Reinforced Cement Concrete M 30 Grade using 20mm down graded chips in Foundation and Plinth-Dirt Wall | 2.5 | cum | 11,932.75 | ₹29,819.94 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
Tendernotice_2.pdf
PDF • 4.47 MB
BOQ_602319.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].