Loading…
Loading…
Tender Value
₹139.7 Cr
EMD Value
₹1.4 Cr
Closing Date
7 Sept 2026, 3:00 pm
THE EE TUDA 4th Floor UD Bhawan
O/O THE EE TUDA 4th Floor UD Bhawan
Design Build and Operate Contract for Comprehensive Water Supply Improvement Works for Bishalgarh Sonamura Santirbazar and Sabroom Cluster IV A Towns of Tripura
2026_TUDAW_75400_1
76CECPEETUDAWSIVAADB2026_27
Open Tender
Civil Works
Item Rate
1095 days
BISHALGARH_SONAMURA_SANTIRBAZAR_SABROOM
Please refer Tender documents.
10 documents required · 10 mandatory
₹20,000
TUDA
₹1.4 Cr
O/O THE EE TUDA 4th Floor UD Bhawan
6 Aug 2026
6 Aug 2026
7 Sept 2026
7 Aug 2026
7 Sept 2026
27 Aug 2026
7 Aug 2026 - 17 Aug 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule No. 1: Design Services | |||||
| 1.01 | Additional/verification Supply, Installation and Construction of DTWs (capacity 10000 GPH each) including all Allied Civil, Electro-Mechanical and Instrumentation works etc. as per Appendix to the PCC Part B, Appendix1 A (Payment Installment) Price Schedule No.4 Installation and Other Services during Design Build period and as per Section 6 Scope of Works, and asper the Approved Drawings, and Specification and direction of the Engineer-in-Charge
Shantirbazar Town | 2 | LS | - | - |
| 1.02 | Additional/verification Supply, Installation and Construction of Resin Based Modified IRPs (capacity 10000 GPH each) including all Allied Civil, Electro-Mechanical and Instrumentation works etc. as per Appendix to the PCC Part B, Appendix1 A (Payment Installment) Price Schedule No.4 Installation and Other Services during Design Build period and as per Section 6 Scope of Works, and asper the Approved Drawings, and Specification and direction of the Engineer-in-Charge
Shantirbazar Town | 2 | LS | - | - |
| 1.03 | Additional/verification Supply, Installation and Construction of Raw Water Transmission Mains and Clear Water Transmission mains and all Allied Civil works etc. as per Appendix to the PCC Part B, Appendix1 A (Payment Installment) Price Schedule No.4 Installation and Other Services during Design Build period and as per Section 6 Scope of Work
Bishalgarh Town | 1 | LS | - | - |
| 1.04 | Sonamura Town | 1 | LS | - | - |
| 1.05 | Shantirbazar Town | 1 | LS | - | - |
| 1.06 | Sabroom Town | 1 | LS | - | - |
| 1.07 | Additional/verification Supply, Installation and Construction of for Remodeled length of exiting distribution network and new Distribution networks including Metered household connections and allied works etc. as per Appendix to the PCC Part B, Appendix1 A (Payment Installment) Price Schedule No.4 Installation and Other Services during Design Build period and as per Section 6 Scope of Work.
Bishalgarh Town | 1 | Nos | - | - |
| 1.08 | Sonamura | 1 | Nos | - | - |
| 1.09 | Shantirbazar | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Appendix_A_B_OF_SECTION_8.pdf
Tender Documents • 14.87 MB
Part_I_Section.pdf
Additional Documents • 3.61 MB
Geo_INVESTIGATION_technical_Report.pdf
Additional Documents • 19.86 MB
Part_III_Section.pdf
Additional Documents • 8.94 MB
Part_II_Section.pdf
Additional Documents • 36.01 MB
BOQ_76752.xls
BOQ • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].