| 1 | L1₹68.3 LAccepted-AOC | ₹68.3 L | L1 | Accepted-AOC Quoted L1 rate |
| 2 | L2₹68.9 LRejected-AOC | ₹68.9 L | L2 | Rejected-AOC Quoted L2 rate |
Tender Value
₹69.0 L
EMD Value
₹1.4 L
Closing Date
3 Jul 2024, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Renewal of 1 road in Musiri Block in Tiruchirappalli District under Periodic Renewal of PMGSY roads 2023-24 Package No.TN22-85B
2024_RDTN_134825_4
DIPR/1942/TENDER/2024
Open Tender
Civil Works - Roads
120 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.4 L
DRDA Tiruchirappalli
4 Sept 2024
21 Jun 2024
3 Jul 2024
21 Jun 2024
3 Jul 2024
21 Jun 2024
25 Jun 2024
Amount
MRL - 17 Renewal of the road from Thinnakonam - Puthur Road in Km 0/0-3/4 (R-63) Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A)
Earth work Excavation in all soils like HSC Soil with initial lead and lift including all other labour charges asper SS 20 A for 100% compaction by power roller etc., completed
CCollection and supply of U.S. Gravel from approved site including cost and conveyance of all materials to site and stacking to departmental gauge for taking remeasurements including all labour charges for spreading in berms etc., complete in Base course. 0/0-3/4
Providing BT Patch work 25mm using 13.20 metal and 44 Kg of Bitumen per 1 Cum of Metal including cost and conveyance of all materials and all labour charges etc complete 'Km. 0/0 - 1/0
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Provision for Octigon Sign Board
Provision for 60cm Triangle sign Board
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for KM Stone etc,.
Provision for HM Stone etc.,
Provision for Name board etc.,
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PERUMAL KUMAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf