| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | L1 | Accepted-AOC Agreement executed |
| Sl No | Description | Qty | Unit | M Valsan L1 |
|---|---|---|---|---|
| 1.00Construction of VCB | ||||
| 1.00 | OD293907/2024-2025:RING BUND Type I Putting up ring bund as per approved shape 2.50m bottom width 2.0m , 1.00m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.60m apart and filled in between with puddle clay to formbund for an average including labour, dismantling the bund after completion of the work etc. complete.(OD from 60.1.1) | 8 | metre | 2,513.69 ₹20,109.52 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 250 | hour | 258.44 ₹64,610 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 162.11 | cum | 269.67 ₹43,715.66 Lowest |
| 1.00 | OD490688/2024-2025:DR PACKING Under foundation - Dry stone packing under foundation with good quality
blasted rubble including conveyance of material and labour charges etc. complete as per
direction of departmental officers at site. (DAR 60.7.2) | 27.33 | cum | 2,366.78 ₹64,679.36 Lowest |
| 1.00 | OD501832/2024-2025:DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted
rubble including packing to compactness to lines levels, cost and conveyance of all materials
labour charges etc. complete as per direction of Departmental officers at site (DAR 60.7.4) | 4.32 | cum | 3,292.02 ₹14,221.53 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 126.52 | cum | 7,256 ₹9,18,029.12 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 3.06 | cum | 8,249.65 ₹25,243.93 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 601.8 | kilogram | 89.27 ₹53,722.69 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 54.94 | sqm | 304.47 ₹16,727.58 Lowest |
Tender Value
₹16.9 L
EMD Value
₹42,324
Closing Date
19 Jul 2025, 2:00 pmClosed
Assistant Engineer
LSGD Section, Kolachery Grama Panchayath
Construction of VCB near Naniyoor canal palam
2025_LSGD_776239_4
AE/LSGD/KGP/Re-eT/2025-26(1)
Open Tender
Civil Works - Water Works
Item Rate
180 days
Kolachery
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹42,324
Yes
1 Sept 2025
11 Jul 2025
22 Jul 2025
12 Jul 2025
19 Jul 2025
12 Jul 2025
Amount
Construction of VCB
OD293907/2024-2025:RING BUND Type I Putting up ring bund as per approved shape 2.50m bottom width 2.0m , 1.00m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.60m apart and filled in between with puddle clay to formbund for an average including labour, dismantling the bund after completion of the work etc. complete.(OD from 60.1.1)
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD490688/2024-2025:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. (DAR 60.7.2)
OD501832/2024-2025:DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site (DAR 60.7.4)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
OD490694/2024-2025:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete (DAR 60.8)
13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
13.45.1:Finishing walls with textured exterior pint of required shade:New work (Two or more coats applied @ 3.28 ltr/ 10 sqm ) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm
18.38.6:Painting G.I pipes and fittings with synthetic enamel white paint with two coats over a ready mixed priming coat, both of approved quality for new work:50 mm diameter pipe
OD490691/2024-2025:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg/sq.cm including cost of materials, conveyance, labour charges etc. complete. (DAR 60.6)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD503732/2024-2025:Dry Rubble masonry with hard stone in foundation and plinth (Modified From DAR 7.1.1)
8.2.1.1:Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Raj Nagar Plain white marble/ Udaipur green marble/Zebra black marbleArea of slab upto 0.50 sqm
OD503731/2024-2025:Engraving letters in hard stone
Bidder Name
M Valsan
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1268966.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .