| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC THANIMOLAL HOUSE MEENANGADI WAYANAD | MEENANGADI | WAYANAD | KERALA | L1 | Accepted-AOC first lowest but not execute the agreement hence forefieted the EMD | |
| 2 | L2₹9.4 L+₹1.2 L (14.2%)Rejected-AOC | L2 | Rejected-AOC second lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical incorrect documents uploaded |
Tender Value
Refer Docs
EMD Value
₹23,305
Closing Date
16 Feb 2023, 4:00 pmClosed
Assistant Executive Engineer
PWD Roads SubDivision,Thalappilly Wadakkanchery
Investigation work
2023_PWD_556108_1
PWD/RB/TR/22561/2022_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
180 days
wadakkanchery
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,060
₹23,305
30 Mar 2023
6 Feb 2023
20 Feb 2023
6 Feb 2023
16 Feb 2023
6 Feb 2023
Amount
APPENDIX 1 -Investigation work & Survey
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.11.c:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos.
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations).
56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures.
APPENDIX 2 - Boundary Demarcation and Traffic study
8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting .
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
OD185092/2022-2023:Engaging coolie
OD185403/2022-2023:Conducting pavement evaluation study using BENKLE MAN BEAM DEFLECTION TEST @ 50m interval as per standards including provision for traffic control safety measures including submitting the results in soft and hard copy, etc. complete
OD185419/2022-2023:Preparing alignment plan for the proposed road and drawing out a suitable alignment meeting all the requirements if IRC. Also satisfying the engineering aesthetic and economic requirements designing of horizontal curves including spiral transitions and vertical finalising the alignment and also preparing the LS and CS at an interval of 50m.
Akhil Paul
Lamanto T. Somervell
Bidder Name
Esteem Developers (P) Limited
Akhil Paul
Lamanto T. Somervell
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_817517.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .