| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC Work Awarded |
| Sl No | Description | Qty | Unit | A ABOOBACKER L1 |
|---|---|---|---|---|
| 1.00Working charge | ||||
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 37.8 | cum | 625.77 ₹23,654.11 Lowest |
| 1.00 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 37.8 | cum | 908.76 ₹34,351.13 Lowest |
| 1.00 | 100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited. | 50.4 | cum | 1,511.23 ₹76,165.99 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 0.57 | cum | 9,001.47 ₹5,157.84 Lowest |
| 1.00 | 100.23.1.9:Laying 300mm. A. C. pressure pipes class 5 kg/cm2 / Class 10 kg/cm2 after conveying within initial lead carefully lowering into trenches placing in position ready for jointing, lighting, watching and providing caution boards etc., complete ( excluding cost of pipe). | 150 | metre | 292.05 ₹43,807.5 Lowest |
| 1.01 | OD21465/2024-2025:300mm CID joint of class 5 | 36 | no | 3,754.76 ₹1,35,171.36 Lowest |
| 2.00Cost of 300 mm AC pipe | ||||
| 2.00 | OD21452/2024-2025:
Providing 300mm. A. C. pressure pipes class 5 kg/cm2 / Class 10 kg/cm2 . All cost of materials conveying ,etc complete | 150 | metre | 754.24 ₹1,13,136 Lowest |
Tender Value
₹3.8 L
EMD Value
₹9,397
Closing Date
12 May 2025, 3:00 pmClosed
EXECUTIVE ENGINEER,KWA
EE, KWA, PH DIVISION, KASARAGOD
State Plan-state plan 2024-25-Rehablitation / Improvement works of urban water supply scheme (Kasaragod WSS - 11 lakh Litre OHSR and 21 lakh Litre GLSR at Vidyanagar Providing Drainage System at KWA campus, Vidyanagar compound -Laying of new drainage
2025_KWA_761983_1
WRD/KWA-CE (NR)/TR/9152/ 2024_26_1_1/3
Open Tender
Civil Works - Others
Item Rate
120 days
Vidyanagar
Please refer Tender documents.
8 documents required · 8 mandatory
₹830
₹9,397
1 Sept 2025
28 Apr 2025
13 May 2025
28 Apr 2025
12 May 2025
28 Apr 2025
28 Apr 2025 - 30 Apr 2025
Amount
Working charge
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
100.23.1.9:Laying 300mm. A. C. pressure pipes class 5 kg/cm2 / Class 10 kg/cm2 after conveying within initial lead carefully lowering into trenches placing in position ready for jointing, lighting, watching and providing caution boards etc., complete ( excluding cost of pipe).
OD21465/2024-2025:300mm CID joint of class 5
Cost of 300 mm AC pipe
OD21452/2024-2025: Providing 300mm. A. C. pressure pipes class 5 kg/cm2 / Class 10 kg/cm2 . All cost of materials conveying ,etc complete
Bidder Name
A ABOOBACKER
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1240091.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .