| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹13.6 L+₹1.4 L (11.5%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹14.0 L+₹1.8 L (15.0%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN LOWEST | |
| 4 | L4₹16.6 L+₹4.4 L (36.2%)Rejected-Finance 14 ILTIFATGANJ AMBEDKAR NAGAR UTTAR PRADESH 224145 UDYAM UP 04 0036158 | AMBEDKAR NAGAR | UTTAR PRADESH | 224145 | L4 | Rejected-Finance OTHER THAN LOWEST |
| Sl No | Description | Qty | Unit | M/S R S CONSTRUCTION CO L4 | PARGAL CONSTRUCTION CO L2 | Vishav Karma Refrigeration and Electric Work L3 | SIDDAHANT ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 metre width and not exceeding 1.5 metre deep, in hard / dense soil for foundation, laying of pipes, wells, cesspits, manhole, pier holes & getting out complete all as specified and as directed by the Engineer-in-Charge | 205 | Cum | 370 ₹75,850 | 250 ₹51,250 | 160 ₹32,800 | 158 ₹32,390 Lowest |
| 2.00 | Returning, filling in trenches including spreading, leveling watering and well ramming in layers not exc 25 cm thick complete all as specified and as directed by the Engineer-in-Charge. | 120 | Cum | 50 ₹6,000 | 35 ₹4,200 | 15 ₹1,800 Lowest | 32 ₹3,840 |
| 3.00 | Removing excavated material to distance not exc 50 metre and depositing where directed at a level n.exc 1.5 metre above the starting point complete all as specified and as directed by Engineer-in-Charge | 85 | Cum | 60 ₹5,100 | 70 ₹5,950 | 15 ₹1,275 Lowest | 32 ₹2,720 |
| 4.00 | Demolition and breaking up of drain pipes (salt glazed ware or AC or reinforced cement concrete/ PVC SWR pipe) set in cement mortar of 150 mm dia complete all as specified and as directed by the Engineer-in-Charge | 230 | Rm | 20 ₹4,600 | 200 ₹46,000 | 30 ₹6,900 | 14 ₹3,220 Lowest |
| 5.00 | Demolition and breaking up of drain pipes (salt glazed ware or AC or reinforced cement concrete/ PVC SWR pipe) set in cement mortar of 200 mm dia complete all as specified and as directed by the Engineer-in-Charge | 206 | Rm | 20 ₹4,120 | 200 ₹41,200 | 30 ₹6,180 | 14 ₹2,884 Lowest |
| 6.00 | Supply and Laying for SN8 HDPE (DWC) pipes of 150mm bore internal dia, laid and jointed floor complete with elastomeric ring and coupler, and including testing all as specified and directed.
Note- 1. Sewage line shall be laid down after cleaning of mud/sludge/muck/human excreta in foul conditions (through mechanical means), getting out and removing sludge to a distance exec 250m and n. exec 500m where directed in and including borrow pits and covering the borrow pits with 10cms layer of soil complete.
2. The blocking and unblocking of existing manholes for laying of pipes shall be included in this item and shall not be paid separately. | 238 | Rm | 595 ₹1,41,610 | 150 ₹35,700 Lowest | 330 ₹78,540 | 572 ₹1,36,136 |
| 7.00 | Supply and Laying for SN8 HDPE (DWC) pipes of 200mm bore internal dia, laid and jointed floor complete with elastomeric ring and coupler, and including testing all as specified and directed.
Note- 1. Sewage line shall be laid down after cleaning of mud/sludge/muck/human excreta in foul conditions (through mechanical means), getting out and removing sludge to a dis exec 250m and n. exec 500m where directed in and including borrow pits and covering the borrow pits with 10cms layer of soil complete.
2. The blocking and unblocking of existing manholes for laying of pipes shall be included in this item and shall not be paid separately. | 206 | Rm | 850 ₹1,75,100 | 180 ₹37,080 Lowest | 485 ₹99,910 | 806 ₹1,66,036 |
| 8.00 | M & L for concrete bed in PCC 1:3:6 type C2 ( using 40 mm graded stone aggregate) to drain pipes 150mm including packing under haunching against the side of pipe after laying & testing | 238 | Rm | 120 ₹28,560 Lowest | 200 ₹47,600 | 360 ₹85,680 | 140 ₹33,320 |
| 9.00 | M & L for concrete bed in PCC 1:3:6 type C2 ( using 40 mm graded stone aggregate) to drain pipes 200mm including packing under haunching against the side of pipe after laying & testing | 206 | Rm | 120 ₹24,720 Lowest | 200 ₹41,200 | 380 ₹78,280 | 140 ₹28,840 |
| 10.00 | Demolition of cement concrete (unreinforced) concrete in ground floors and paving n-exc 15cm thickness( below or above ground floors.) | 6 | Cum | 50 ₹300 Lowest | 250 ₹1,500 | 150 ₹900 | 130 ₹780 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
28 May 2026, 6:00 pmClosed
GE SAMBA
GE SAMBA PIN 184121
REPAIR CLEANING OF SEPTIC TANK SOAKAGE WELLS MANHOLES AND SEWAGE LINES IN ZONE I AREA UNDER GE SAMBA
2026_MES_763913_1
8166/GE/SMB/T-18/2026-27
Open Tender
Miscellaneous Works
Item Rate
180 days
GE SAMBA
Class E Cat a ii
8 documents required · 8 mandatory
₹500
GE SAMBA
₹40,000
Yes
18 Jul 2026
7 May 2026
30 May 2026
7 May 2026
28 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 metre width and not exceeding 1.5 metre deep, in hard / dense soil for foundation, laying of pipes, wells, cesspits, manhole, pier holes & getting out complete all as specified and as directed by the Engineer-in-Charge | 205 | Cum | 100 | ₹20,500 |
| 2 | Returning, filling in trenches including spreading, leveling watering and well ramming in layers not exc 25 cm thick complete all as specified and as directed by the Engineer-in-Charge. | 120 | Cum | 101 | ₹12,120 |
| 3 | Removing excavated material to distance not exc 50 metre and depositing where directed at a level n.exc 1.5 metre above the starting point complete all as specified and as directed by Engineer-in-Charge | 85 | Cum | 101 | ₹8,585 |
| 4 | Demolition and breaking up of drain pipes (salt glazed ware or AC or reinforced cement concrete/ PVC SWR pipe) set in cement mortar of 150 mm dia complete all as specified and as directed by the Engineer-in-Charge | 230 | Rm | 102 | ₹23,460 |
| 5 | Demolition and breaking up of drain pipes (salt glazed ware or AC or reinforced cement concrete/ PVC SWR pipe) set in cement mortar of 200 mm dia complete all as specified and as directed by the Engineer-in-Charge | 206 | Rm | 102 | ₹21,012 |
| 6 | Supply and Laying for SN8 HDPE (DWC) pipes of 150mm bore internal dia, laid and jointed floor complete with elastomeric ring and coupler, and including testing all as specified and directed.
Note- 1. Sewage line shall be laid down after cleaning of mud/sludge/muck/human excreta in foul conditions (through mechanical means), getting out and removing sludge to a distance exec 250m and n. exec 500m where directed in and including borrow pits and covering the borrow pits with 10cms layer of soil complete.
2. The blocking and unblocking of existing manholes for laying of pipes shall be included in this item and shall not be paid separately. | 238 | Rm | 101 | ₹24,038 |
| 7 | Supply and Laying for SN8 HDPE (DWC) pipes of 200mm bore internal dia, laid and jointed floor complete with elastomeric ring and coupler, and including testing all as specified and directed.
Note- 1. Sewage line shall be laid down after cleaning of mud/sludge/muck/human excreta in foul conditions (through mechanical means), getting out and removing sludge to a dis exec 250m and n. exec 500m where directed in and including borrow pits and covering the borrow pits with 10cms layer of soil complete.
2. The blocking and unblocking of existing manholes for laying of pipes shall be included in this item and shall not be paid separately. | 206 | Rm | 101 | ₹20,806 |
| 8 | M & L for concrete bed in PCC 1:3:6 type C2 ( using 40 mm graded stone aggregate) to drain pipes 150mm including packing under haunching against the side of pipe after laying & testing | 238 | Rm | 101 | ₹24,038 |
| 9 | M & L for concrete bed in PCC 1:3:6 type C2 ( using 40 mm graded stone aggregate) to drain pipes 200mm including packing under haunching against the side of pipe after laying & testing | 206 | Rm | 103 | ₹21,218 |
| 10 | Demolition of cement concrete (unreinforced) concrete in ground floors and paving n-exc 15cm thickness( below or above ground floors.) | 6 | Cum | 104 | ₹624 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TenderDocuments18.pdf
Tender Documents • 0.96 MB
BOQ_855660.xls
BOQ • 2.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .