Loading…
Loading…
Tender Value
₹20.1 L
EMD Value
₹40,208
Closing Date
14 Jul 2026, 3:00 pm6d left
Executive Engineer
O/O. the Executive Engineer, PWD(RandB) Belonia Division, South Tripura
Earthwork, C.C. work, Brick work, R.C.C. work, Hardrawn, Truss and G.C.I. sheet roofing etc.
2026_CEPWD_74429_1
05/NIT/EE/BD/PWD/BLN/2026-27
Open Tender
Civil Works - Building
90 days
B.C. Nagar R.D. Block area
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹40,208
7 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto
1.5m, disposed earth to be levelled and neatly dressed.
-All kinds of soil | - | Cum | 179.9 | - |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | Cum | 1,177.3 | ₹1,176.12 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering •
-All work upto plinth level:
i) 1:4:8 ( 1 Cement: 4 fine sand: 8 graded stone aggregate 40 mm nominal size) | 1 | Cum | 9,960.7 | ₹9,950.74 |
| 4 | First class brick work in foundation and plinth including cost of all materials as required complete
i) In cement mortar 1:4 ( 1 cement : 4 fine sand). | - | Cum | 9,845.2 | - |
| 5 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:-
i) In cement mortar 1:4 ( 1 cement: 4 fine sand) | - | Cum | 11,410.19 | - |
| 6 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-
i) In cement mortar 1:4 ( 1 cement: 4 fine sand). | 1 | Sqm | 1,533.5 | ₹1,531.97 |
| 7 | Centering shuttering including struttings, propping etc. and removal of form work for:
i) Suspended floors, roofs, landings, balconies and access platform with 12 mm thick shuttering ply | 1 | Sqm | 729.5 | ₹728.77 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement.
a) All work upto plinth level:
i) 1 : 1.5 : 3 ( 1 cement : 1.5 fine sand : 3 graded stone aggregate of 20 mm nominal size) | 1 | Cum | 12,073.8 | ₹12,061.73 |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
i) Thermo-Mechanically Treated bars of grade Fe-500D or more | - | Kg | 103.9 | - |
| 10 | 12 mm cement plaster of mix
i. Cement mortar 1:4 (1 cement : 4 find sand) | - | Sqm | 224.2 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
DNIeT05.pdf
Tender Documents • 2.60 MB
BOQ_75756.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid