| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC | L1 | Accepted-AOC As per higher authorities | |
| 2 | L1₹8.7 LRejected-Finance | L1 | Rejected-Finance As per higher authorities |
| Sl No | Description | Qty | Unit | SANIKA CONSTRUCTIONS L1 | LAXMAN ARJUN GAWAS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorumS of all varities shingles, pebble all type of conglomerates, all types of laterite rock, soft rock, ordinary rock, disintegrated rock, fissured/shattered, decomposed rock or weathered rock and all such other materials, as described under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convinient or permitted including of chiselling, wedging etc. but blasting prohibited in all conditions such as dry moist, saturated submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing in removal of stumps and other deterious materials, dressing of side and bottomS and disposing of the remaining excavated soil/rock as directed by Engineer-in-charge for the intial lead of 50m and all lifts etc, complete. | 200 | Cum | 228.79 ₹45,758 | 220.1 ₹44,020 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 19 | cum | 1,768.78 ₹33,606.82 | 1,700.08 ₹32,301.52 Lowest |
| 3.00 | Centering and shuttering including struttings, propping etc. and removal of formworks for:
i) Foundations, footings, bases for columns and mass concrete. | 147 | sqm | 325.6 ₹47,863.2 | 310 ₹45,570 Lowest |
| 4.00 | Providing & Laying plum concrete in cement concrete 1:2:4 (1 cement: 2 Coarse Sand: 4 graded or basaltic stone aggrt. 40mm nominal size) with plumS not exceeding 15% of the volume of the finished concrete of size ranging from 150 to 300mm (but the maximum dimention not exceeding 1/3 (one third) the least dimention of member under consideration excluding the cost of centering, shuttering.
b) Laterite stone plum in:
1) Foundation and plinth | 63 | Cum | 4,738.42 ₹2,98,520.46 Lowest | 4,740 ₹2,98,620 |
| 5.00 | Laterite Boulder Masonary in cemenet concrete 1:3 in foundation | 110.3 | Cum | 3,197.6 ₹3,52,695.28 Lowest | 3,252 ₹3,58,695.6 |
| 6.00 | Providing & Laying cement concrete 1:2:4 (1 Cement: 2 Coarse Sand: 4 Graded Granitic or Basiltic Stone aggrt. 20mm nominal size) excluding cost of centering , shuttering in:
All Works upto plinth level | 16 | cum | 5,448.07 ₹87,169.12 | 5,400.36 ₹86,405.76 Lowest |
Tender Value
₹12.8 L
EMD Value
₹25,536
Closing Date
29 May 2025, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Improvement to nallah bank near the field of Shri. Arjun Shablo Gaonkar at Kodal V.P. Nagargao in Sattari Taluka.
2025_WRD_22797_1
WRD/WDVI/PB/F.30/TN e 10/2025-26/ 130 Line 11 Dated 15/05/2025
Open Tender
Civil Works - Water Works
Item Rate
30 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹25,536
7 Aug 2025
19 May 2025
30 May 2025
19 May 2025
29 May 2025
19 May 2025
Amount
Earthwork in excavation by mechanical means in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorumS of all varities shingles, pebble all type of conglomerates, all types of laterite rock, soft rock, ordinary rock, disintegrated rock, fissured/shattered, decomposed rock or weathered rock and all such other materials, as described under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convinient or permitted including of chiselling, wedging etc. but blasting prohibited in all conditions such as dry moist, saturated submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing in removal of stumps and other deterious materials, dressing of side and bottomS and disposing of the remaining excavated soil/rock as directed by Engineer-in-charge for the intial lead of 50m and all lifts etc, complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formworks for: i) Foundations, footings, bases for columns and mass concrete.
Providing & Laying plum concrete in cement concrete 1:2:4 (1 cement: 2 Coarse Sand: 4 graded or basaltic stone aggrt. 40mm nominal size) with plumS not exceeding 15% of the volume of the finished concrete of size ranging from 150 to 300mm (but the maximum dimention not exceeding 1/3 (one third) the least dimention of member under consideration excluding the cost of centering, shuttering. b) Laterite stone plum in: 1) Foundation and plinth
Laterite Boulder Masonary in cemenet concrete 1:3 in foundation
Providing & Laying cement concrete 1:2:4 (1 Cement: 2 Coarse Sand: 4 Graded Granitic or Basiltic Stone aggrt. 20mm nominal size) excluding cost of centering , shuttering in: All Works upto plinth level
SANIKA CONSTRUCTIONS (BID ID -48737)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .