| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-Finance | ₹13.1 L | L1 | Accepted-Finance ok |
| 2 | L2₹13.5 LAccepted-Finance | ₹13.5 L | L2 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | M.B. Enterprises L1 | A.S.ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Disconnecting of HT supply from main HT panel after proper switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required. | 1 | Job | 32,940 ₹38,869.20 | 33,300 ₹39,294 |
| 2.00 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job | 96,300 ₹1.1 L | 1,08,000 ₹1.3 L |
| 3.00 | Cleaning of winding with DC 2-26 | 200 | nos | 61,200 ₹72,216 | 61,920 ₹73,065.60 |
| 4.00 | Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage. | 1 | Job | 36,450 ₹43,011 | 36,900 ₹43,542 |
| 5.00 | Replacement of silica gel. | 1 | Job | 3,600 ₹4,248 | 3,690 ₹4,354.20 |
| 6.00 | Repairing of tape changer. | 1 | Job | 29,250 ₹34,515 | 29,700 ₹35,046 |
| 7.00 | Repairing of LT Copper bolt and Pam, remettaling and finishing the same as per original shape and size. | 4 | Job | 97,200 ₹1.1 L | 1,00,800 ₹1.2 L |
| 8.00 | Checking & matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays testing the same. | 1 | Job | 24,750 ₹29,205 | 25,200 ₹29,736 |
| 9.00 | Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine. | 1 | Job | 42,300 ₹49,914 | 43,200 ₹50,976 |
| 10.00 | P/Fixing of winding protection pad | 1 | Job | 24,750 ₹29,205 | 25,200 ₹29,736 |
Tender Value
Refer Docs
EMD Value
₹26,500
Closing Date
29 Jan 2026, 3:00 pmClosed
Kuldeep Yadav
Chandrawal Water Works-I, Civil Lines, Delhi-11054
Servicing/Overhauling of 2500 KVA Bharat Bijlee make Transformer at Chandrawal Water Works-I
2026_DJB_285382_1
NIT No. 19 (Item No.1)/(2025-26)
Open Tender
Electrical Works
30 days
Chandrawal Water Works-I
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Delhi Jal Board
₹26,500
5 Feb 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
22 Jan 2026 - 29 Jan 2026
Disconnecting of HT supply from main HT panel after proper switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required.
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc.
Cleaning of winding with DC 2-26
Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage.
Replacement of silica gel.
Repairing of tape changer.
Repairing of LT Copper bolt and Pam, remettaling and finishing the same as per original shape and size.
Checking & matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays testing the same.
Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine.
P/Fixing of winding protection pad
Repair of cooling fins, replacement of cooling fins gasket and oil seal for stopping the leakage.
Filling of T/oil to up to top up level as required to make Savita/ Power
Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site as required
Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint.
Insulating the LT Cable and tightening of thimble as per site requirement
Making the copper earthing pit as per site requirement With copper strips
Making the GI earthing pit as per site requirement With GI Strips
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_377581.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid