Tender Value
₹98.3 L
EMD Value
₹98,341
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Dy.City Engineer
Stone Paving Work at at diff.poles, Khadki and Choktha Khadia area under Muni.Counsilor, M.P., M.L.A. and 70:20:10 Budget in Khadia Ward
347150
Central Zone E-Tender Notice No.07/2026-2027 Tender No.235
Open
Civil Works - Others
Works
Ahmedabad
₹2,400
Municipal Commissioner, Ahmedabad
₹98,341
21 Sept 2026
21 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
Name of work :- Ftrzgt Jtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht
MþaJJtbtk ytJlth ftbtu <ubs 70:20:10le Mfeb nuX¤lt ftbtu <&t yLg csux vife Ftzegt
rJM<thbtk sw>e sw>e vtu¤tubtk, Fzfeytubtk, atufXtbtk vÚ&h vurJkd fhJtlt ftb ctc<.
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate sealed tenders from
interested contractors for the following work at different locations within the limit of A.M.C.
1 Name of work Ftrzgt Jtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux
Vt¤Je <uytu îtht MþaJJtbtk ytJlth ftbtu <ubs 70:20:10le Mfeb nuX¤lt
ftbtu <&t yLg csux vife Ftzegt rJM<thbtk sw>e sw>e vtu¤tubtk, Fzfeytubtk,
atufXtbtk vÚ&h vurJkd fhJtlt ftb ctc<.
2 Estimated Tender Amount Rs.9934134.89 (excluding of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
3 Tender fee Rs.2400.00
(Non refundable) (Demand Draft in favour of Municipal Commissioner, Ahmedabad)
4 Time Limit 12 Months
5 Download of Tender Tenders from the website www.nprocure.com or shall be down
Documents loaded mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “D” class having in Road Works in PWD in Govt. R&B / CPWD /
AMC or equivalent register with any other state Govt. or institutions.
7 Earnest Money Deposit Rs.99,341.00 (Demand Draft / pay order / Bank Guarantee in favour of
(Bid security) Municipal Commissioner, Ahmedabad is to be submitted as prescribed
(1 % of Estimate put to as below. Demand Draft/Bank Guarantee shall be from approved list of
AMC of banks and the issuing branch of bank guarantee shall be of
Ahmedabad city only and it should be valid for for 180 days. ( As
Per AMC finance Dept . Circular No. 5 Dt. 5/5/2007 & F.D.
Circular No. 29 Dt. 7/8/2010 & attched ANNEXURE - 1 finance
dept.circular No-40 Dt.05/11/2020. E.M.D. shall be submitted
physically along with the Physical Submission when applicable.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with tender
Tender Fees documents as described in the invitation of tender should be
submitted to Assistant Manager- Central Zone, 3rd Floor, B – Wing,
Sardar Patel Bhavan, Danapith, Ahmedabad-380001.
Bid submitted without bid security & tender fee shall be treated as
non responsive and shall be summarily rejected.
9 Mode of sending the The whole tender shall be submitted by two modes.
Tender Documents • Whole tender shall be submitted only on www.nprocure.com
website as per Schedule mentioned in Notice inviting
• Tender Fee, EMD, technical bid and other relevant PQ Documents
as per check list given in tender shall be submitted physically in
two copies (Original & duplicate) in sealed envelope as per
Schedule mentioned in Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.
Tenders. The tenders received after latest schedule date and time will not
be entertained under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall fill
percentage rate on amount of BOQ online only until specified.
Price Bid shall be submitted physically duly signed & seal without
Signature of Bidder Page 3 of
Ahmedabad Municipal Corporation
mentioning quoted rated, else it shall be considered as rejected.
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft /
pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad. Bank Guarantee shall be from approved list of AMC of
banks as per attched ANNEXURE - 1 finance dept. latest circular.
and the issuing branch of bank guarantee shall be of Ahmedabad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LOI failing which interest @ 4% per annum will be
charged by AMC.
15 Deductions from Running
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Defect & Liability Period Not applicable in this case. If applicable than refer condition of
contract attached over rule as per form B-1 published by Government.
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
• All the circulars which were published by Authorities of AMC time by time will be applicable on said Tender
and bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights to reject any
or all the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case authorized
signatory holding Power of Attorney and Digital Signatory are not the same, the bid shall be considered non-
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 4 of
Ahmedabad Municipal Corporation
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Additional City Engineer
Ahmedabad Municipal Corporation,
Name of Work :- :- Ftrzgt Jtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht MþaJJtbtk ytJlth
ftbtu <ubs 70:20:10le Mfeb nuX¤lt ftbtu <&t yLg csux vife Ftzegt rJM<thbtk sw>e sw>e vtu¤tubtk,
Fzfeytubtk, atufXtbtk vÚ&h vurJkd fhJtlt ftb ctc<.
I/We the undersigned have carefully gone through and clearly understood the Tender documents of above mentioned
project comprising of Notice Inviting tenders, Articles of Agreement, Scope of work, Definition of terms, notes
Instructions/Information to Bidder, Condition of Contract, special condition of contract, Appendices, Specifications, Bill of
Quantities, furnished by AHMEDABAD MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in accordance with the
specification, designs, drawing and instruction in writing referred to in the said document and with such materials as mentioned
for, at the respective rates which I/we have quoted in the Price Bid or at such other rates as may be fixed under the provisions of
these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required, execute the
contract, according to your form 1 of agreement as or in default where of I/we bound myself/ourselves to forfeit the "Earnest
Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by AMC from the date of
receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for the sum as mentioned in NIT,
the full value of which is to be absolutely forfeited to the Employer If I/We fail to commence the work specified. Otherwise the
Employer shall retain the said sum, as on account of such Security Deposit as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in accordance with conditions in the
aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any tender, which are received. I /
We also understand & agree that Municipal Commissioner Reserves the right to allot number of tenders to successful bidders at
his sole discretion in case if I / We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of opening of the tender.
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned in the tender terms and
conditions. I am also bound to submit all supporting Genuine Original documents as and when asked and if any discrepancy found
in such documents as well as in the executed Work with respect to Quality/Quantity at any stage of work or even after completion
of work, it will be solely my Responsibility. I am bound to prove originality of all documents submitted by me and if any Documents
found false/fake then Municipal Commissioner/AMC has right to take any action/penalty/punishment against me.
I am also bound that if I/we, indulged into any malpractice and/or used any inferior quality and/or the construction of
road is found to be of an inferior quality under this contract than in such case Municipal Commissioner/AMC has right to debar/
blacklist permanently.
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi duties, Royalty on material (i.e.
Aggregate, Sand etc.) And any other taxes prevailing and from time to time on such items on which the same are leviable and the
rates quoted by me/us are inclusive of the same.
Yours faithfully
Date: Seal and Sign of Contractor
Signature of Bidder Page 5 of
Ahmedabad Municipal Corporation
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad Municipal Corporation (referred
to as Employer in these documents) invites sealed bids for the construction of works (as defined in these
documents and referred to as “the work”) detailed in the table given in the Invitation for Bid (hereinafter
called as IFB.) from competent bidder. The bidders may submit bids for the works detailed in the table given in
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as defined in this tender.
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in the Clause-14. An agency
that has been engaged by the Employer to provide consulting services for the preparation or supervision of the
works, and any of its affiliates, shall not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or the firms those are
blacklisted/ debarred for specified period by AMC, Governement of Gujarat, Government of India or any other
entity controlled by it, would not be eligible to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:-
Register as per Notice Inviting Tender having in Road Works in PWD in Govt. R&B / CPWD / AMC or equivalent
register with any other state Govt. or institutions.
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are subject to be disqualified if
• Made misleading or false representations in the forms, statements, affidavits and attachments submitted in
proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly completing the contract,
inordinate delays in completion, litigation history, or financial failures etc. or debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for the purpose of
restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer and other advisors in any
manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes his commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
• The envelope does not show on the outside the reference of bid and thus gets opened before the due date
• The E.M.D. is not deposited in full and in the manner as specified in the clause of Earnest Money Deposit.
• The tender is in a language other than English or dose not contains its English Translation in case of other
language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
Signature of Bidder Page 6 of
Ahmedabad Municipal Corporation
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment/Black listing
Not withstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading or
false representations in the forms statements etc. for the period to be decided by the Employer.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his Bid. Employer will in no
case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and familiarize himself with
the site of Works and its surroundings including source of earth, water, road aggregates etc. and obtain all
information that may be necessary for preparing the Bid and entering into a contract for construction of the
Works. The costs of visiting the Site shall be at the Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes and thereby total amount of
• If the quantity stipulated in the tender items varies or the scope of work changes and thereby total amount of
work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision whatsoever.
• If the items stipulated in the tender shall not be executed as per site condition/ requirements. No claim shall
be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain idle and no claim shall be
entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and addendum (if any) issued.
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract, contract data, forms, terms,
technical specifications, forms, Annexes in the bid document. Failure to comply with the requirements of bid
documents shall be at the bidder’s own risk. Bids which are not substantially responsive to the requirements of
the bid documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding documents by issuing
Signature of Bidder Page 7 of
Ahmedabad Municipal Corporation
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed on website
www.tender.nprocure.com The prospective bidder shall refer to website to check any addendum before
hours of opening of bids. AMC will not give any advertisement for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum into account in preparing their
bids, the Employer may, at his desecration, extend as necessary the deadline for submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails to do so than also the changes
made through such addendum shall be applicable & bound to the bidder.
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following documents along with bid:
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with these Instructions to
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original” and other marked as
“Duplicate”, shall be submitted in a sealed envelope by 18:00 Hrs on the date of physical submission of bid and
addressed to the addressee given in the NIT duly super scribed “Name of Work, Bid due date and time, Name
and address of the bidder”
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on the percentage rate in the
Bill of Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or for any other cause shall be
included in the rates, prices and total Bid Price submitted by the Bidder, except otherwise stated in the Bid
document. Employer will not compensate the bidder (contractor) for any change in duties, taxes and other
levies payable by the contractor under the contract and any other reasons.
• The percentage rate and bid price quoted by the bidder shall be fixed up to the completion of Work and shall
not be subject to adjustment on any account, except where expressly specified, otherwise, in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be made in Indian Rupees.
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid valid for a shorter period
shall be rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the Employer may request that the
bidders may extend the period of validity for a specified additional period. The request and the bidders'
Signature of Bidder Page 8 of
Ahmedabad Municipal Corporation
responses shall be made in writing or by cable. A bidder may refuse the request without forfeiting his bid
security. A bidder agreeing to the request will not be required or permitted to modify his bid, but will be
required to extend the validity of his bid security for a period of the extension.
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB as part of his bid, in the form
of Demand Draft / pay order / Bank Guarantee in favour of Municipal Commissioner, Ahmedabad valid for
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad City only
Signature of Bidder Page 9 of
Ahmedabad Municipal Corporation
Signature of Bidder Page 10 of
Ahmedabad Municipal Corporation
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the Employer as non-responsive.
16.4 Any bid having bid security for lesser value and shorter validity period shall be treated as non-responsive.
Signature of Bidder Page 11 of
Ahmedabad Municipal Corporation
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be returned as promptly
(b) The bid security of the successful bidder, along with second and third lowest tenders, will be returned
when the successful bidder has furnished the required security deposit and signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has signed the Agreement and
furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit to
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch of the bank guarantee
shall be of Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp papers of requisite
value in accordance with the stamp Act applicable to that particular state of Indian Union, where executed.
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall clearly indicate in (block
letters) his name, designation, Power of Attorney No. / Signing Power No. etc.
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly signed/initialed by the executing
officers and the last page shall be signed in full, indicating the particulars as aforesaid under the seal of the
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate envelopes and the three
sealed envelopes shall be sealed in an outer envelope. The Bid envelopes shall be marked as follows:-
• Complete Tender Document with all necessary qualification related documents (in two copy)
Above two envelopes shall be kept in one envelope and it should be marked as “Technical Bid” and sealed.
This Outer envelope should mention the name of firm of bidder, his address, contact details & name of the
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager - Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c) Bear the following identification:
Indicate the name and address of the bidder.
• If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for
the misplacement or premature opening of the bid.
Signature of Bidder Page 12 of
Ahmedabad Municipal Corporation
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be received by the Employer at the
address specified in bid information not later than the date indicated on the face sheet of the document. In
the event of the specified date for the submission of bids declared a holiday for the Employer, the Bids will be
received up to the appointed time on the next working day. The Bidder is further required to submit
Documents in Physical Form on or before the Bid Due Date and before the time of submission as specified in
NIT, at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n) procure e-tendering portal
on account of delay in submission at bidder's end. Bidder shall ensure that they submit the bid well before the
"Due Date & Time of Bid- Submission". AMC shall not be responsible if bidder is not able to submit the bid on
account of failure in network/internet connection or any other technical reason.
18.3 The Employer may extend the deadline for submission of bids by issuing an amendment in accordance with
respective Clause, in which case all rights and obligations of the Employer and the bidders previously subject to
the original deadline will then be subject to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment / corrigendum if any.
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be rejected and returned unopened
Any Bid received by the Employer after the deadline prescribed in NIT will be returned unopened to the
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to expiration of
the Bid validity period by writing, facsimile or e-mail confirmed by registered letter. This letter (hereinafter and
in the Conditions of Contract called the “Letter of Acceptance” will state the sum that the Employer will pay
the Contractor in consideration of the execution, completion, and maintenance of the Works by the Contractor
as prescribed by the Contract (hereinafter and in the Contract called the “Contract Price”).
The notification of award will constitute the formation of the Contract, subject only to the furnishing of a
Security Deposit in accordance with the provisions of Clause.
The agreement will incorporate all correspondences between the Employer and the Successful Bidder. It will
be signed by the Employer and the Successful Bidder.
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement within 28 days after the
successful bidder (hereinafter called the Contractor) receives the Letter of Acceptance, unless they agree
otherwise, subject to furnishing the security deposit before signing the Agreement with the Employer.
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will promptly notify the other
Bidders that their Bids have been unsuccessful and release their Earnest Money Deposit / Bid Security.
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall deliver to the Employer a
security deposit in the form of Bank Guarantee for an amount equivalent to 5% of the Contract Price valid for
the period of valid till 45 days beyond Date of completion of work. The Security Deposit shall be payable in
Signature of Bidder Page 13 of
Ahmedabad Municipal Corporation
days (for tenders upto Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from date of receipt of
LoA failing which interest @ 4% per annum will be charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the Employer, from Ahmedabad
branch of any Banks mentioned in the clause no. 16.2 of these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill including pre & post Audit.
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late submission of security deposit or
late renewal of bank guarantee for the number of days delayed for submission or discontinuity of the bank
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be same verbatim as per the
format. Bank Guarantee shall be submitted on right value of stamp paper and for correct value of contract.
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause 22.1 shall constitute sufficient
grounds for cancellation of the award and forfeiture of the Bid Security.
22.6 In case of any contract amendment during execution of the contract enhancing value of the contract the Bank
Guarantee value shall be enhanced accordingly. Validity of Bank Guarantee shall be commercial terms and
conditions of the tender.
22.7 All compensation or other sums of money payable by the Contractor to the Employer under the terms of this
Contract or any other contract or on any other account whatsoever may be deducted from Security Deposit.
Also in the event of the Contractor's Security Deposit being reduced by reasons of such deductions, as
aforesaid, the Contractor shall, within 14 days of receipt of notice of demand from the Engineer-in-Charge,
make good the deficit in Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of validities of Bank Guarantees
as may have been furnished by the Contractor from time to time, are required to be extended/renewed, the
Contractor shall get the validity periods of such guarantees extended/renewed, and furnish these to the
Engineer-in Charge one month before the expiry date of the aforesaid Guarantees originally furnished failing
which the existing Bank Guarantees shall be invoked by the Engineer – in – charge. Also in case of any deficit in
securities on any account as might occur or is noticed, the Contractor shall forthwith recoup/replace the same
with acceptable Security Deposit.
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities as per contract are not
completed in all respects.
22.10 The Security Deposit less any amount due shall, on demand, be returned to the contractor after 45 days of
completion date / Final Bill paid date which ever is later. No interest on the amount of Security Deposit shall be
paid to the Contractor at the time of release of Security Deposit as stated above.
22.11 The successful bidder to whom ‘LoA’ has been issued shall enter into an agreement at Employer’s office within
15 days of LoA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad shall be final and binding to
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration resulting from Contractors
completed or under execution by him over last five years. If the details of Litigation History are hidden by the
Bidder and later on it comes to the knowledge of the Employer, the Bidder shall be disqualified for the
proposed work and other appropriate actions shall be taken against the bidder.
Signature of Bidder Page 14 of
Ahmedabad Municipal Corporation
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Employer Value of the Reasons/Details for Remarks showing
Year Name of Project (Rs.) litigation/arbitration Present Status
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise the same shall be treat as null
A consistent history of arbitration awards? Judgments against the applicants or any partner of a joint venture
may result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it comes to knowledge of the employer
the bidder shall be disqualified for the proposed work and other appropriate actions shall be taken against the
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 15 of
Ahmedabad Municipal Corporation
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended time limit, the Contractor shall pay
penalty of 10% of amount of actual remaining work. The amount of work for which the scope of contractor is
reduced shall not be considered for the calculation of Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no. 18 Date: 23/05/2017 and all latest
Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such retention money shall be
released in the final bill of the said work. AMC reserves right to deduct any amount to compensate the poor
performance of the contractor i.e. poor quality or abandoned / incomplete work.
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not subcontract any portion of Work
without the approval of the Employer’s Representative. Any subcontracting shall not relieve the Contractor
from any contractual obligations or responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for which the name of the
subcontractor and scope of works activities to be performed by him is already stated in the contract or supply
of material or engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as referred to in the
Bid document to carry out the functions stated in the Schedule or other personnel approved by the Engineer.
The Engineer will approve any proposed replacement of key personnel only if their qualifications, abilities, and
relevant experience are substantially equal to or better than those of the personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning reasons thereof, for his misconduct
or inadequacy of technical skills and experience, who is a member of the Contractor’s staff or his work force,
the Contractor shall ensure that the person leaves the Site within seven days and has no further connection
with the work in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts shall not be erected on the site
of work and contractor shall make his own arrangements to provide such accommodations as per the rules of
the local bodies. He shall make his own arrangements for housing, stores, field office etc. He shall submit a site
layout plan indicating the location of various site facilities to be created by him at his cost for the execution of
work. The Owner shall in no way be responsible for any delay on this account and no claim on this account
whatsoever shall be entertained. All Basic amenities shall be provided by the Contractor to Labours as per the
prevailing labour Laws.
5.1 The Contractor shall have full regard throughout execution, completion and defects liability period to following
safety aspects and shall take all necessary steps to ensure that danger to safety is avoided all the time in
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or indirectly engaged by him for the
Signature of Bidder Page 16 of
Ahmedabad Municipal Corporation
• Safety of all the employees including persons working on other contracts of Employer at the same site
of the Employer and Engineers employees engaged at work site.
• Any authorized third party persons on the site.
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing, warning signs, barricading, and
cones; when and where necessary, or required by Engineer in Charge or by any duly constituted authority for
the protection of the works or for the safety and convenience of the public or other.
5.3 The Contractor shall take all reasonable steps to protect the environment on and off the site and avoid
damage or nuisance to persons or property of the public and others arising as a consequence of his method of
5.4 The Contractor shall maintain in good condition all work throughout execution, completion, and defects
liability period. The contractor shall be responsible for and to make good all injuries, damages and repairs,
rendered necessary by fire, rain, traffic, floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be provided by the contractor.
Nothing extra shall be payable on this account. It shall be provided strictly with double scaffolding system with
all the accessories etc. with adjustable suitable working platforms to access the areas, with ease for working
and inspection. It shall be designed to take all incidental loads. It should cater to the safety features for
workmen. It shall be ensured that no damage is caused to any structure due to scaffolding.
5.6 All temporary warning/ caution boards display shall be provided and displayed during day as well as night time
by the contractor, wherever required and as directed by the Engineer.
5.7 Arrangement of temporary water and electricity and telephone connection required, by him, shall be made by
the Contractor at his own cost and also necessary permissions directly from relevant Owners shall be obtained
by him under intimation to the Owner. Also all initial and running charges and security deposit, if any in this
regard shall be borne by him. The Contractor shall abide by all the rules/ bye laws applicable in this regard and
he shall be solely responsible for any penalty on account of violation of any of the rules and byelaws in this
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety precautions, the same shall be
completely contractor’s responsibility. All the losses due to such accidents and expenses of legal matters shall
be borne by contractor.
5.9 The Contractor shall be responsible for maintenance and watch and ward of the complete installation and shall
also be responsible for any pilferage, theft, damage, penalty etc. in this regard. The Contractor shall indemnify
the Owner against any claim arising out of pilferage / theft, damage, penalty etc. whatsoever on this account.
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the work. Necessary protective and
safety equipments shall be provided to them by the Contractor at his own cost and used at site.
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All wreckage rubbish, excess
materials, temporary works no longer required will be removed from site immediately.
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus materials, rubbish, temporary
works of every kind.
A. COST CONTROL
8.0 Bill of Quantities
a. The schedule-B shall contain Memorandum showing items for the construction, installation, testing, and
commissioning work to be done by the Contractor.
Signature of Bidder Page 17 of
Ahmedabad Municipal Corporation
b. The quantities stated in the schedule B are estimated quantities. The Contractor shall be paid only
quantities calculated after taking measurements of executed work. The rate stated in the schedule B for
each item of work shall apply. The works shall be measured by the Contractor jointly with the authorized
representative of the Engineer and all particulars required by the representative of the Engineer shall be
supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom, working space etc. is to be
9.1 The Engineer in Charge shall have power to make any variation of form, quality or quantity of the works or any
part thereof that may, in his opinion, be necessary and for that purpose, or if for any other reason it shall, in
his opinion, be appropriate, he shall have the authority to instruct the Contractor to do and the Contractor
shall do any of the following:
Increase or decrease the quantity of any work up to any extent included in the contract,
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the effects, if any, of all such variations
shall be valued in accordance with the following sub clauses. Provided that where the issue of an instruction to
vary the Works is necessitated by some default or breach of contract by contractor or for which he is
responsible, any additional cost attributable to such default shall be borne by the Contractor.
9.3 The Contractor shall not make any such variation without an instruction of the Engineer. No instruction is
required for quantities varying from those provided for the items in the contract schedule B.
10.0 Extra Items
10.1 The basis for the valuation of variations for addition to the Contract Price shall be as follows in the same order
a) Variations in the quantities of work in schedule of quantities shall not vitiate the contract.
b) The contractor shall be bound to execute extra items of work as directed by the Engineer-in-charge.
c) Contract unit rates for individual items shall apply to varied quantities where there is a quantity variation.
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried out by the Contractor and he
shall be paid at the rate fixed by Employer which shall be fixed as lowest of the rates derived by rate analysis
based on the following three methods. , the priority of the documents forming the Contract shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year 2013-14, the rate of extra
item shall be that rate and premium (above or below) quoted by contractor.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and equipment, the cost of
all temporary and incidental works, the overheads and the Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour costs, the cost of use of all
plant, machinery, and equipment, the cost of all temporary and incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors profit shall be taken at 10% of
the final rate derived.
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and prices as are, in his opinion
appropriate and shall notify the Contractor accordingly with a copy to the Employer.
Signature of Bidder Page 18 of
Ahmedabad Municipal Corporation
10.5 The Engineer shall determine provisional rates and prices to enable on account payments to be included in the
Interim Payment Certificates, until rates and prices are agreed as final by the Employer, the Contractor, and
10.6 The Contractor shall not be entitled to additional payment for costs, which could have been avoided by giving
11.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries in terms of the
contract and taxes at source, as applicable under the law. The Employer shall pay the Contractor the amounts
certified by the Engineer.
11.2 If an amount certified is increased in a later date certificate due to corrections in previous certificates or as a
result of an award from disputes review experts, Contractor shall be paid such amount only. The Contractor
shall not be paid any interest upon such delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be paid for by the Employer and shall
be deemed covered by other rates and prices in the Contract.
11.4 All payments shall be made in Ahmedabad.
12.0 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State and Local Governing bodies
prevailing on the date of award of the contract. The Contractor will have to pay all such taxes and duties for
the performance of this Contract. The Employer will deduct from the Contractor’s monthly and other
payments all taxes and duties, which he is bound to recover in accordance with the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the Central & State and local Governing
bodies, all orders, decrees of bodies, tribunals having any jurisdiction or authority which in any manner affect
those engaged or employed, and anything related to carrying out the work. All the bye-laws lay down by
AMC/AUDA and any other local bodies while executing the work shall be adhered to. All taxes of local bodies
shall be borne by the contractor. The Contractor shall arrange to give all notices required by any authority and
to pay to such authority all the fees that may have to be paid for the material, plants, equipments etc. The
Contractor shall also adhere to all traffic restrictions notified by the local authorities. He shall protect and
indemnify the Owner and its officials & employees against any claim or liability arising out of violations of any
such laws, ordinances, orders, decree, whether by himself or by his employees or his authorized
representatives. Nothing extra shall be payable on these accounts.
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No. CWA/2004-1831-M(3) dt.
9/12/05 issued by G.O.G. (non-refundable) shall be deducted from every bills which shall be deposited to Govt.
Labour Department for Labour welfare fund.
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
16.0 Cost of Repairs
Signature of Bidder Page 19 of
Ahmedabad Municipal Corporation
Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end
of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the loss or
damage arises from the Contractor's acts or omissions.
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of the Works and the Engineer
will do so upon deciding that the Work is completed.
18.0 Termination
18.1 The Employer shall be entitled to terminate the contract if the contractor:
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to Bid after receipt by him of
a Notice to this effect from the Engineer/Employer after signing the agreement or
2. To proceed with the works, or any section thereof, within 28 days after received notice
3. Has failed to comply with a notice issued or an instruction issued within 28 days after having received.
4. Abandons the works or otherwise plainly demonstrates the intention not to continue performance of
his obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior written permission of the
6. Has failed to furnish the required securities or extension thereof in terms of the contract.
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order made
against him, compounds with his creditors, or carries on business under receive, trustee or manager
for the benefit of his creditors, or if any act is done or event occurs which (under applicable Laws) has
a similar effect to any of these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days notice to the contractor,
terminate the contract and expel the contractor from the site. However, in the case of sub-paragraphs (h), the
Employer may be notice terminate the contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any other rights of the Employer, under
the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for any other entities to do so. The
Employer and these entities may then use any goods, contractor’s documents and other design documents
made by or on behalf of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other party causes a fundamental breach of
18.6 Fundamental breaches of Contract include, but shall not be limited to the following:
(a) the Contractor stops work for 14 days when no stoppage of work is shown on the current Program and the
stoppage has not been authorized by the Engineer;
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other than for a reconstruction
or amalgamation;
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a fundamental breach of Contract
and the Contractor fails to correct it within a reasonable period of time determined by the Engineer;
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for which the maximum
amount of liquidated damages becomes payable as defined in the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent practices in
competing for or in the executing the Contract.
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or soliciting of
anything of value to influence the action of a public official in the procurement process or in contract
Signature of Bidder Page 20 of
Ahmedabad Municipal Corporation
execution. “Fraudulent practice” means a misrepresentation of facts in order to influence a procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive practice
among Bidders (prior to or after bid submission) designed to establish bid prices at artificial non-
competitive levels and to deprive the Borrower of the benefits of free and open competition.”
18.7 When either party to the Contract gives notice of a breach of contract to the Engineer for a cause other than
those listed above, the Engineer shall decide whether the breach is fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for convenience.
18.9 If the Contract is terminated the Contractor shall stop work immediately, make the Site safe and secure and
leave the Site as soon as reasonably possible and handover the site to the Employer including all materials and
plant and equipment existing there upon.
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the accuracy of the same. He shall
also be responsible for the correctness of the positions, levels, dimensions, and alignment of all parts of the
structures as per instructions given to him. If at any time any error shall appear during the progress of any part
of the work, the contractor shall at his own expense rectify such error if called upon to the satisfaction of the
Engineer in charge.
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation arises out of or under this Contract
against the contractor the same may be deducted by the Municipal Corporation from any sum then due or
which at any time thereafter may become due to the contractor under this contract and failing that under any
other contract with the Municipal Corporation or from any sum due to the contractor with the Municipal
Corporation (which may be available with Municipal Corporation), or from his retention money, or he shall pay
the claim on demand. The Municipal Corporation reserves the right to carry out post payment audit and
technical examination of the final bill including all supporting vouchers, abstracts, etc.
20.2 The Municipal Corporation further reserves the right to enforce recovery of any over payment when detected
notwithstanding the fact that the amount of the final bill may be included by the Contractor.
20.3 If as a result of such audit and technical examination any over payment is discovered in respect of any work
done by the Contractor or alleged to have been done by him under the contract, it shall be recovered by the
Municipal Corporation from the contractor by way of all the means prescribed above or if any under payment
is discovered by the Municipal Corporation, any amount due to the contractor under this contract or under
payment may be adjusted against any amount then due or which may at any time thereafter become due
before payment is made to the contractor from him to the Municipal Corporation on any other contract
account whatsoever.
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to dismantle any part for reasons other than
on account of bad or imperfect work, the materials obtained from dismantling will be the property of the
A.M.C. and will be disposed of as per instruction of Engineer-in-charge in the best interest of the A.M.C.
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the following matters, whether such
disputes arise during the progress of the work or after the completion or abandonment thereof, shall be
referred an independent Arbitrator appointed by AMC as far possible in consultation with the agency if it is
necessary and such disputes shall be settled in accordance with the arbitration and conciliation Act.
Signature of Bidder Page 21 of
Ahmedabad Municipal Corporation
(i) The rates of payment under clause 5 for any tools, materials and stores, in or upon the works of the
site thereof or belonging to the contractor or procured by him and intended to be used for execution
of the work or any part thereof possession of which may have been taken by the Engineer-in-charge
under the said clause –5.
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the items of works not
accepted as completed fully in accordance with the sanctioned specifications.
(iii) The rate of part of payment for any class of work which is included in the additional or altered work
carried out by the contractor in accordance with the instructions of the Engineer-in-charge under
clause 14 and the rates for which is to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased by the contractor
before receipt of notice given by the Engineer-in-charge under clause 15 and/or amount of
compensation payable to the contractor under the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause 17 in the event
of this failure to rectify, remove or reconstruct the work within the period specified in the written
intimation or the amount of expenses incurred by the Engineer-in-charge under the said clause17 in
rectifying, removing or re-executing the work or in removing and replacing the materials or articles
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause 17 for the inferior work
or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimates and assessed under
(viii) The amount payable to the contractor for the work carried out under clause 33 in accordance with the
instructions and the requirement of the Engineer-in-charge in case where there are no specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving reasons and calculations to every
item of claims. The decision will have to be implemented by all the concerned.
(x) In case of dispute leading to the contractor or Ahmedabad Municipal Corporation approaching on
Court of Law. It shall be within the jurisdiction where the site of work is situated.
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under clause 5 to take possession
of all or any tools, plants, materials and stores in or upon the works of site thereof belonging to the
contractor or procured by him and intended to be used for the execution of the work or any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the contractor in any work or from
removing such materials to other places, during the period the work is stopped or suspended in pursuance,
of notice given to the contractor under clause
iii) Progress of the work or the carrying out the additional or altered work in accordance with the provisions of
clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when asked by AMC. No separate
payment will be made to the contractor for this. . The contractor shall have to submit the same in hard copy as
well as soft copy as and when demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon, except those permitted under
clause 59.1, shall be taken, or permitted to be taken by the Contractor or by any of his employees or any
employees of his sub-Contractors without the prior approval of the Engineer in writing. No photographs/
videography shall be published or otherwise circulated without the approval of the Engineer in writing.
Seal and Signature of the Bidder Additional City Engineer
Signature of Bidder Page 22 of
Ahmedabad Municipal Corporation
Date: Ahmedabad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe œhJt¤wk xuLzh ylu ftuLx[t¾x
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt ybœtJtœ BGþrl. ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt ftuLx[t¾xhtu
Che NfNu. dJobuLxlt btLg ftuLx[t¾xhu ybœtJtœ BGþrl. ftuvtuohuNlbtk btLg ftuLx[t¾xhtule gtœebtk hSMxuNl
fhtJJtlwk hnuNu.
c:- btLg ©uKelt ftuLx[t¾xh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu
s ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb mk<tu»tfthf <ubs xtRb jebexbtk ÃþY fhJt sYhe
mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
z:- ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836, <t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh
mh¾gwjh, lk. - 17, <t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve,
heLgwyj Ve <&t yvd{uzuNl Ve ylu btvœkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkath ylu
JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekd (fu su ftb
fhJt, ftb ÃþY fhJt <&t ftblt buRxulLm btxu cltJuj ntug) <ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekd
btxu, gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt
buRxulLm btxule søgt)
(h) yt ftble mbg bgtoœt bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh< fhJtlt
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk
bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
Signature of Bidder Page 23 of
Ahmedabad Municipal Corporation
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VuhVth fhJtbtk ytJNu lrn
ylu ytJe ftuR AufAtf fu VuhVth ægtlu juJtNu lrn, <ultk jFtKbtk ftuR Cwj ntug <tu <ult vh l Dwkx<t Ftuxt
jFtK fu ytkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtk ytÔgw lrn ntug <tu xuLzh
ybtLg dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[t¾xhtult btdoœNol btxu
mtbtLg rlgbtu ylu mwaltytu vK ft¤SvwJof JtkaJt rJlk<e Au.
(1) ftuE vK fthK œNtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^< hnu Au.
(h) xuLzhhu ctuj vtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþhk< s ybtLg dKJtbtk ytJNu.
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt
rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t ntug.
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu cœÕGþ / cœÕgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk œhuf Ctdeœth y&Jt <u ykdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l
fhu y&Jt xuLzhbtk <u btxu htFJtbtk ytJuje søgtbtk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
z:- xuLzh MJefthJw, hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe
hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu
J¤<hltu n¬ œtJtuu fhe NfNu lrn fu ftgœtfeg ftgoJtne yt ykdu &R NfNu lrn. xuLzh bkswh >ltu y&o
ftb ytve œuJtLþk Au <uJtu &R NfNu lrn.Nh<e xuLzh MJefthJtbtk ytJNu lne.
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble ftuRvK Cwjawf leault
rlgbtu ylwmth mhCh fhJtbtk ytJNu.
(1) xuLzh Chlthu œhuf Ftltbtk sKtJuj Nçœtu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk Nçœtuubtk sKtJuj hfb
btLg htFJtbtk ytJNu.
(2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtflt Ftltbtk&e hfbbtk Cwj
sKtg <tu yufb œh btLg htFJtbkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkt ytJNu.
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt ytJNu.
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk ytJNu lrn.
Signature of Bidder Page 24 of
Ahmedabad Municipal Corporation
(10) y:- ftbltu «tud{um mbgbgtoœt bwsc fhJtltu hnuNu. yt mbgbgotœt 10 jtF mw^elt ftb btxu yuj.ytu.ytR.
ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃg <theF&e 15 rœJm&e
NY &guj dKJtbt ytJNu. <&t <u œhBgtl ftble 3% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk
ytJNu. ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
c:- mûtb m•tt îtht Yt.10,00,000.00 (œm jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ctœ (LoI)
ytvJtbtk ytJNu. ðgth ctœ rœl - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex
btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «J<obtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj
«btKu bkswh &guj mbgbgtoœt ctœlt FhuFh ctfe ftble hfblt bn•tb 10% juFu (je¾Jezexe zubuSm)
vulÕxe Jmwj fhJtbtk ytJNu.
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe,
vtjF, ÃjtLx, œuFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykNu <btb Faoltu <&t sYh
sKtg <tu ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkfujt CtJ fu œh fh<t
J^thtle ftuR awfJKe ykdult <ublt ftuR œtJt ægtlbtk juJtNu lnek ylu xuLzh Chlth Ftuxe hswyt<lu fthKu
y&Jt ftuR Ôgrf<yu (vAe<u ctk^ftb rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje btne<elu yt^thu
vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnek. <ublw xuLzh ChJt <&t <ubtk swœt swœt CtJ ylu œh ChJt
btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtk&e
WCt &<t ftuR stuFb fu sJtcœthebtk&e Axfe NfNu lnek. mœh ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj
Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu. <&t
Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt rcl Nh<e
ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx + yu¾x[t
ytRxb) 2 % juFu hexuLNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxhlt
cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce:- xuLzhbtk œNtoJuj ftb mkck^e œM<tJusbtk œNtoJuj rJd<btk rJmkd<<tlt rfMmtbtk leau œNotJuj ¢btlwmth
œM<tJusbtk œNtoJuj rJd< d{tng htFJtbkt ytJNu.fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu
<u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
(yu) yufb ylu fœ:-
(2) xuLzh VtuboLþk CtJvºtf
Signature of Bidder Page 25 of
Ahmedabad Municipal Corporation
(3) MvuNeVefuNl
z[tu#dbtk fœ, ytfth, ytkfzt fœta Ftuxt ntug <tu btvujt fœ, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t ykdule ltuk^ bwfe yuze.mexe
yuLSlegh / zu. BGþrl. frbNlh©ele bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykr<b
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh
Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
(14) yt Wvhtk< y.Bgw.ftu. lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
(16) atjw ftbu mrJom jtRllu lw¾mtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lw¾mtl &Nu <tu
<ule mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR
btKmlt òlbtj lu lw¾mtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vrhgtœ &tg <tu <ule
sJtc>the vK ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule sJtc>the vK vtujem Vrhgtœbt ftuLx[tfxhle
hnuNu. CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e bswh Ftztbtk W<thJt, Ntuhekd ylu
Mxu[xekd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vrhgtœbt sJtcœth hnuNu
ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn. ytxjwk mbSlu s xuLzh ChJwk. œhuf
ftb fh<t bswhtultu rJbtu vK W<thujtu ntuJtu stuRyu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu.
bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu <&t atjw ftb œhBgtl yuLSlegh
RLatso îtht ybœtJtœ Bgwrlmevj ftuvtuohuNlle buxjzuvtu jucbtk xuMxekd fhtJJt sKtJJtbtk ytJu <tu
ftuLx[t¾xh îtht <ulw vtjl fhJtlw hnuNu.
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u
ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1 btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch yufx <&t
bswhtu <&t MxtVle Jebt vtujeme jElu <ult ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht
su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu. bu.BGþrl.frbNlh©elt mh¾âwjh Bþsc sYhe ctknu^he vºtf
ytvJtLþk hnuNu.
(21) ftuRvK ftgœtfeg jexeduNl ybœJtœ Nnuhle ftuxobt hnuNu.
Signature of Bidder Page 26 of
Ahmedabad Municipal Corporation
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs
dtuXJJtltu hnuNu.
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt
hnuNu.<&t xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe
J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt
CtJ lffe fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
(26) atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[tfxhle hnuNu. subtk vevzt, œtuhzt Cgmwaf ctuzo,
ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkvwKo
sJtc>the ftuLx[tfxhle hnuNu.
(27) M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt
rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtc>the ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk œhhtus fhuj ftbdehe <&t
yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe
ltku^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe
yuLSlegh©elu hnuNu.
(29) œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl
Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze.mexe. yuLSlegh©eltu rlKog
ytFhe hnuNu. Jtuxhekd fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt
Fauo ylu stuFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e ftve juJtbtk ytJNu.
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh îtht
ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex J^the ytvJtbtk ytJNu.
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu ftuLx[t¾xhu VhSgt<
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu jd<tk ftb btk
ftuRvK mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs buLgwyj M¾{uJSkd ykdule btdoœrNoft lwk
Signature of Bidder Page 27 of
Ahmedabad Municipal Corporation
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e
Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-
btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
>M<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu rmfft
Signature of Bidder Page 28 of
Ahmedabad Municipal Corporation
TECHNICAL SPECIFICATIONS:
Name of Work :- :- Ftrzgt Jtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht MþaJJtbtk
ytJlth ftbtu <ubs 70:20:10le Mfeb nuX¤lt ftbtu <&t yLg csux vife Ftzegt rJM<thbtk sw>e sw>e vtu¤tubtk,
Fzfeytubtk, atufXtbtk vÚ&h vurJkd fhJtlt ftb ctc<.
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off
the excavated stuff upto 50 Meter lead. (A) Loose or soft soil
0 to 1.5 meter depth.
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any such ordinary excavating
implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls under this category. For materials and
workmanship for earthwork and excavation, relevant specification IS: 3764 & IS 1200 (Part I) shall be followed.
The depth of the excavation shall be as per the item description.
Clearing the Site:
The site where the Development has to be carried out shall be cleared and all obstructions, loose stones,
materials and rubbish of all kind, bush; wood and all type trees shall be removed, as directed.
The materials so obtained shall be the property of the Client and shall be conveyed and stacked as directed,
within 50-m. lead. The roots of the trees coming in the sides of the trenches shall be cut and coated with hot
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority / Municipal
Commissioner, before cutting shall be cut after obtaining such permission from them. It shall be the Client's
responsibility to obtain such permission from the respective authorities.
The rate of site clearance is deemed to be included in the rate of earthwork, for which no extra will be paid.
After cleaning the site, the centerline of the central verge & other constructions will be given by the
Engineer-in-charge. The Contractor shall assume full responsibility for alignment, elevation and dimension of
each and all parts of the work. Contractor shall supply labours, materials, etc. required for setting out the
reference marks and bench marks made of MS angle iron and embedded in 1:2:4 CC.
They shall maintain the same as long as required and directed.
The excavation shall be carried out in true line and level and shall have the width and depth, as shown in the
drawings or as directed. The Contractor shall do the necessary shoring and strutting or shall provide
necessary slopes to a safe angle or steps, as required or directed, at his own cost. No extra payment shall be
made for such precautionary measures, taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely, as directed, by removing excess soil and watering, as required. No earth
filling will be allowed for bringing it to level, if by mistake or any other reason, excavation is made deeper or
wider than shown on the drawings or as directed. The extra depth or width shall be made up with sand
filling, as specified for the bottom level of the subsequent finishing at the cost of the Contractor or as
directed by Engineer-In-Charge.
Signature of Bidder Page 29 of
Ahmedabad Municipal Corporation
The Contractor shall at his own expense and without extra charge make provision of supporting all utility
services, lighting the excavated areas, separating and stacking serviceable materials neatly,shoring,
timbering, strutting, bailing out water either sub-soil or rainwater, including pumping at any stage of the
work. Excavated areas shall be kept free of water while masonry or concrete or relevant base works are in
progress and till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in filling the excavated areas wherever required
inlayers, including ramming and watering, ensuring proper compaction etc. complete.
The Contractor shall remove the balance of the excavated quantity from the site of work, to a place, as
directed and for all lift.
The lead is the shortest practical route and not necessarily the route actually taken. The decision of
Engineer-In-charge shall be final in this regard.
Mode of Measurement and Payment:
The measurement of excavation of excavated area shall be made according to the sections shown on the
drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus excavation
made in excess of above requirements or due to stepping and sloping back as found necessary, on account of
conditions of soil and requirements of safety.
The rate shall include for clearing the site, surface dressing, making layout for road, fixing permanent grid
points with MS iron posts, embedded in C.C. 1:2:4, placed sufficiently away from the existing traffic lines and
establishing bench marks etc.
The rates shall include for necessary shoring, timbering and strutting for protection of sides of the excavated
area, pumping out rain or surface water at any stage of construction so as to keep the excavated area dry, to
the satisfaction of the /Engineer-in-charge.
The rate shall include leveling and ramming the bottoms of excavations to receive concrete, etc. including
trimming to slope wherever necessary etc. complete.
In filling clods bigger than 50 mm. shall not be allowed. Only consolidated measurements of filling shall be
paid. Consolidation to be done by mechanical compactor as per relevant item.
Extra Rate Over Item of Excavation of Earth for excavation of asphalt pavement / RCC of thickness up to 0.20 meter
including demolishing the asphalt carpet, metal, soiling/cutting Reinforcement etc.comp. with stacking the material
as directed. (Based on Previously approved rate by C E sir)
(a) up to 0.20 meter thickness (By Manual)
(b) 0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C. Cutter machine including cost of operator, fuel,
& transportation etc complete.)
(c) 0.30 meter & above (By any type of Breaker Machine or R.C.C. Cutter machine including cost of operator,
fuel, & transportation etc complete.)
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet, metal, soiling
etc. complete with stacking the materials as directed. The road surface of asphalt shall carefully be opened to full width
as directed by the Engineer in charge so as to remove all cracks or other damaged portions of road either manually or
Signature of Bidder Page 30 of
Ahmedabad Municipal Corporation
with the soiling shall be first be stripped off for the whole width of trenches. All the Fmaterials shall be separately
deposited in such places as may be determined by the Engineer-in-charge. In case rubble not being so deposited or
being mixed up with the excavated materials will not be allowed for refilling. The cost of materials shall be charged
from the contractor. The decision of the C.E. shall be final and binding to the contractor.
Mode of measurement
Measurement shall be paid by Smt basis.
Dismantling the following including loading, unloading and disposal of unserviceable material for
all lead or as directed by Engineer-In-Charge and stacking the serviceable material and backfilling
the resulting trenches and pits complete.
a. Dismantling tiled or stone floors laid in mortar including stacking of serviceable
material anddisposal of unserviceable material with all lead and lifts.
b. Demolition including stacking of serviceable materials and disposal of
unserviceablematerials with all lead and lift. (I) R.C.C work.
c. Demolition of brick work & stone masonry including stacking of serviceable
materials anddisposal of unserviceable materials with all lead and lift. (II) In
The demolition shall consist of demolition of one or more parts of the structure as specified or shown in the
drawings. Demolition implies taking up or down or breaking up. This shall consist of demolishing whole or
part of work including all relevant item as specified or shown in the drawings.
The demolition shall always be planned before hand and shall be done in reverse order of the one in which
the structure was constructed. Contractor is fully responsible for proper and safe demolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work or
property, which is to be left intact, before dismantling and demolishing is taken up and the work shall be
carried out in such a way that no damages is caused to the adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary precautions shall
be taken to keep the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged by
dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled first. The dismantled
articles shall be properly stacked as directed.
All materials obtained from demolition shall be the property of Government unless otherwise d shall be kept
in safe custody until handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out and stacked
properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b stacked as directed
by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Signature of Bidder Page 31 of
Ahmedabad Municipal Corporation
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition dismantling and no
allowance for increase in bulk shall be allowed. The demolition of lime concrete shall be measured under
this item. Specification for deduction for voids, openings etc. shall be on same basis as that employed for
construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following limits, unless
otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b) Area shall be
worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be worked out to the nearest
The rate shall include cost of all labour involved and tools used in demolishing and dismantling including
scaffolding. The rate shall also include the charges for separating out and stacking the serviceable materials
properly and disposing the unserviceable materials with all lead and lift. The rate also includes for temporary
storing for the safety of the portion not required to be pulled down or of adjoining property and providing
temporary enclosures or partitions where considered necessary.
The rate shall be for a unit of one cubic metre. For Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on mortars
shall be done Dismantling implies carefully taking up or down or these are fixed by nail screws bolts etc. the
shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate shall include
stacking the unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind Including spreading & levelling etc. complete.
(a) Lead Upto 1 Km.
(b) Lead From 1 Km to 2 Km.
(c) Lead From 2 Km to 3 Km
(d) Lead From 3 Km to 4 Km
(e) Lead From 4 Km to 5 Km
(f) Lead From 5 Km to 10 Km
(g) Lead From 10 Km to 15 Km
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a lead of
meters or as per instruction given by Engineer in charge. Useful materials obtained from clearing site and
excavation shall be stacked and used within the work site. Internal conveyance above 200 mt within the work
site i.e. From starting chainage to End chainage of a given road WILL NOT BE PAYABLE. Materials suitable for
construction of Embankment, earthen shoulder and subgrade shall be stacked at convenient places within a
work site for reuse. No extra payment will be paid to the contractor for stacking of earth within the work site
and reused for the construction of Embankment layer, sub grade and earthen shoulder purpose. Only surplus
earth shall be disposed off outside the work site as per instruction given by Engineer-In-charge. Useful stones
Signature of Bidder Page 32 of
Ahmedabad Municipal Corporation
from rock excavation shall be stacked nearly within a lead of 50 M. and will be allowed to be used by the
contractor on payment at rates laid down in the contract or if not so aid down, at schedule of rates of the
Division or at a mutually agreed rates if there are no such rates in the Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance from a
particular stretch of given road will be paid in this item as per instruction of Engineer in charge. No bulkage of
disposed earth will be considered for the payment.
Item No.05 Providing, laying, spreading and compacting graded ston eaggregate to wetmix macadam
specification including premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course
on well prepared surface and compacting with vibratory roller to achieve the desired density as
per Codal Provision.(Approved Rate )
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material, premixed
with water, to a dense mass on a prepared sub-grade/sub- base/ base or existing pavement as the case may be in
accordance with the requirements of these Specifications. The material shall be laid in one or more layers as necessary
to lines, grades and cross-sections shown on the approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or other
approved types of compacting equipment are used, the compacted depth of a single layer of the sub-base course may
be upto 200 mm with the approval of the Engineer.
Physical Requirements
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical requirements set forth in Table
19-1. Sevaliya/Timba/Ankodiya special aggregate is only acceptable.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test shall be carried out
on the material delivered to site as per IS:2386 (Part-5).
Table 19-1 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base Courses
S. No. Test Test Method Requirements
1. Los Angeles Abrasion value IS:2386 (Part-4) IS:2386 (Part-4) 40 percent (Max.)
or Aggregate Impact value or IS:5640 30 percent (Max.)
2. Combined Flakiness and IS:2386(Part-1) 35 percent (Max.)*
Elongation indices (Total)
*To determine this combined proportion, the flaky stone from a representative sample should first be separated out. Flakiness
index is weight of flaky stone metal divided by weight of stone sample. Only the elongated particles be separated out from the
remaining (non-flaky) stone metal. Elongation index is weight of elongated particles divided by total non-flaky particles. The values
of flakiness index and elongation index so found are added up.
Grading Requirements
The aggregates shall conform to the grading given in Table 19-2.
Signature of Bidder Page 33 of
Ahmedabad Municipal Corporation
Table 19-2 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600 micron 8-22
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary from
the low limit on one sieve to the high limit on the adjacent sieve or vice versa.
Construction Operations:-
Preparation of Base
The surface of the sub-grade/sub-base/base to receive the Wet mix macadam course shall be prepared to the specified
grade and camber and cleaned of dust, dirt and other extraneous material. Any ruts or soft yielding places shall be
corrected in an approved manner and rolled until firm surface is obtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including depressions and
potholes shall be repaired and made good with the suitable material. The existing surface shall be scarified and re-
shaped to the required grade and camber before spreading the coarse aggregate for Wet mix macadam.
Preparation of Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having provision for controlled
addition of water and forced/positive mixing arrangement like pugmill or pan type mixer of concrete batching plant.
For small quantity of wet mix work, the Engineer may permit the mixing to be done in concrete mixers.
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more than agreed limit. The
mixed material should be uniformly wet and no segregation should be permitted.
Spreading of mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared subgrade/sub-
base/base in required quantities. In no case should these be dumped in heaps directly on the area where these are to
be laid nor shall their hauling over a partly completed stretch be permitted.
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-Charge and/or
his authorized representative. For portions where mechanical means cannot be used, manual means as approved by
the Engineer shall be used. The motor grader shall be capable of spreading the material uniformly all over the surface.
Its blade shall have hydraulic control suitable for initial adjustments and maintaining the same so as to achieve the
specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
Loading hoppers and suitable distribution mechanism
The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it is spread
without rutting or otherwise marring the surface profile.
Signature of Bidder Page 34 of
Ahmedabad Municipal Corporation
The paver shall be equipped with necessary control mechanism so as to ensure that the finished surface is free
from surface blemishes.
The surface of the aggregate shall be carefully checked with templates and all high or low sports remedied by
removing or adding aggregate as may be required. The layer may be tested by depth blocks during construction. No
segregation of layer and fine particles should be allowed. The aggregates as spread should be of uniform gradation
with no pockets of fine materials.
After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be uniformly
compacted, to the full depth with suitable roller. If the thickness of single compacted layer does not exceed 100 mm,
smooth wheel roller of 80 to 100 kN weight may be used. For a compacted single layer upto 200 mm, the compaction
shall be done with the help of vibratory roller of minimum static weight of 80 to 100 kN or equivalent capacity roller.
The speed of the roller shall not exceed 5 km/h.
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge and progress
gradually towards the upper edge. Thereafter, roller should progress parallel to the centre line of the road, uniformly
over-lapping each preceding track by at least one third width until the entire surface has been rolled. Alternate trips of
the roller shall be terminated in stops at least 1 m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward until the edges
have been firmly compacted. The roller shall then progress gradually towards the centre parallel to the centre line of
the road uniformly overlapping each of the preceding track by at least one-third width until the entire surface has been
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be
corrected at once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly compacted with
mechanical tampers or a plate compactor. Skin patching of an area without scarifying the surface to permit proper
bonding of the added material shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the sub-
base/base course or subgrade. If irregularities develop during rolling which exceed 12 mm when tested with a 3 metre
straight edge, the surface should be loosened and premixed material added or removed as required before rolling
again so as to achieve a uniform surface conforming to the desired grade and crossfall. In no case should the use of
unmixed material be permitted to make up the depressions. Rolling shall be continued till the density achieved is at
least 98 per cent of the maximum dry density for the material as determined by the method outlined in IS : 2720 (Part-
After completion, the surface of any finished layer shall be well-closed, free from movement under compaction
equipment or any compaction planes, ridges, cracks and loose material. All loose, segregated or otherwise defective
areas shall be made good to the full thickness of the layer and recompacted.
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface till it has dried
and the wearing course laid.
Signature of Bidder Page 35 of
Ahmedabad Municipal Corporation
Surface Finish and Quality Control of Work
Surface evenness:
The surface finish of construction shall conform to the requirements of Clause in Item No. 16&17&18.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 19-3.
Table 19-3 : Test and Frequency for Materials for Wet Mix Macadam
Type of Test Frequency IS Code
Construction (As per Circular No. 66)
Wet Mix Gradation One test per 200 Cu.m. IS:2386, Part-I-1963
Macadam Aggregate Impact Value One test per 1000 Cu.m. IS:2386, Part-IV
Combined Flakiness and One test per 500 Cu.m. IS:2386, Part-I
Elongation Indices
Atterberg Limits of One test per 200 Cu.m. IS:2720, Part-V
portion of aggregates
Density of compacted One set of three tests per1000 IS:2720, Part-VIII
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where
the course is otherwise defective due to subgrade soil getting mixed with the aggregates, the full thickness of
the layer shall be scarified over the affected area, reshaped with added premixed material or removed and
replaced with fresh premixed material as applicable and recompacted. The area treated in the aforesaid
manner shall not be less than 5 m long and 2 m wide. In no case shall depressions be filled up with unmixed
and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take
all necessary measures for the safety of traffic during construction and provide, erect and maintain such
barricades, including signs, marking, flags, lights and flagmen as per instruction of the Engineer-in-charge.
Measurements for Payment
The rate shall be for a unit of one cubic meter.
Providing and laying cement concrete 1:4:8 (1-Cement: 4- coarses and 8-hand broken stone aggregates
40mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth (upto
ton). Building SOR 2023-24 Iteam Cod :05004A Iteam No. As Per NBO 5.3.3
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials and watered
and rammed as directed. The proportion of cement, sand and hand broken stone aggregates shall be one part of
cement, 4 parts of coarse sand, 8 parts of hand broken stone aggregates and shall so measured by volume. The
concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however be allowed for smaller
Signature of Bidder Page 36 of
Ahmedabad Municipal Corporation
quantity of work if approved by the Engineer-incharge. When hand mixing is permitted by the Engineer-in charge in
case of breakdown of machinery’s and in the interest of the work. it shall be carried out on a water tight platform and
care shall be taken to ensure that mixing is continued until the mass is
uniform in colour and consistency. The quantity of water shall be sufficient to produce a dense concrete of required
workability for the purpose. The concrete shall be handled from the place of mixing to the final position in not more
than 15 minutes by the method as directed and shall be placed into its final position, compacted and finished within
minutes of mixing with water i.e. before the setting commences. The concrete shall be laid in layers of 15 cms. to
cms. The concrete shall be rammed with heavy iron rammers and rapidly to get the required compaction and to allow
all the gaps to be filled with mortar. After the final set, the concrete shall be kept continuously wet, if required by
pounding for a period of not less than 7 days from the date of placement The concrete shall be measured for its length
breadth and depth, limiting dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Item No.07 Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere
work , using cement content as per approved Design Mix manufactured in fully automatic batching
plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous
agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work
including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering
shuttering finishing and reinforcement including cost of admixtures in recommended proportions as
per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength
and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per
latest IS 456 shall be maintained)
This Specification covers the general requirements for concrete using on-site production facilities including
requirements in regard to the quality, handling, storage of ingredients, proportioning, batching, mixing,transporting,
placing, curing, protecting, repairing, finishing and testing of concrete; form work;
requirements in regard to the quality, storage, bending and fixing of reinforcement; grouting as well as mode of
measurement and payment for complete works.
It shall be very clearly understood that the specifications given herein are brief and do not cover minute details.
However, all work shall have to be carried out in accordance with the relevant standards and codes of practices or in
their absence in accordance with the best accepted current engineering practices or as directed by Engineer from time
to time. The decision of Engineer as regards the specification to be adopted and their interpretation and the mode of
execution of work shall be final and binding on Contractor and no claim whatsoever will be entertainment on this
APPLICABLE CODES AND SPECIFICATIONS
The following specifications, standards and codes, including all official amendments/revisions and other specifications
and codes referred to therein, should be considered a part of this specification. In all cases the latest
issue/edition/revision shall apply. In case of discrepancy between this specification and those referred to herein below
or other specifications forming a part of this bid document, this specification shall govern.
CODE FOR MATERIALS:
Signature of Bidder Page 37 of
Ahmedabad Municipal Corporation
1. IS: 4031 (Parts 1 to 15) Methods of physical tests for hydraulic cement
2. IS: 4032 Methods of chemical analysis of hydraulic cement
3. IS: 650 Specifications for standard sand for testing of cement
4. IS: 2430 Methods for sampling of aggregates for concrete
5. IS: 2386 (Part 1 to 8) Methods of test for aggregates for concrete
6. IS: 3025 Methods of sampling and test (physical and chemical) water
used in industry
7. IS: 6925 Methods of test for determination of water soluble chlorides in concrete admixtures
CODE FOR MATERIALS STORAGE
1. IS: 4082 Recommendations on stacking and storing of construction materials at site
CODE FOR CONCRETE MIX DESIGN
1. IS: 10262 Recommended guidelines for concrete mix design
2. SP: 23 (S&T) Handbook on Concrete Mixes.
CODE FOR CONCRETE TESTING:
1. IS:1199 Method of sampling and analysis of concrete
2. IS:516 Method of test for strength of concrete
3. IS:9013 Method of making, curing and determining compressive strength of accelerated cured concrete test
4. IS:8142 Method of test for determining setting time of concrete by penetration resistance.
5. IS:9284 Method of test for abrasion resistance of concrete
6. IS:2770 Methods of testing bond in reinforced concrete
CODE FOR EQUIPMENT
1. IS:1791 Specification for batch type concrete mixers
2. IS:2438 Specification for roller pan mixer
3. IS:4925 Specification for concrete batching and mixing plant
4. IS:5892 Specification for concrete transit mixer and agitator
6. IS:2505 General requirements for concrete vibrators: Immersion type
7. IS:7251 Specification for concrete finishers
8. IS:2722 Specification for portable swing weigh batchers for
Signature of Bidder Page 38 of
Ahmedabad Municipal Corporation
concrete (single and double bucket type).
9. IS:2750 Specification for steel scaffoldings
CODES OF PRACTICE (LATEST REVISION)
1. IS:456 Code of practice for plain and reinforced concrete
2. IS:457 Code of practice for general construction of plain and
reinforced concrete for dams and other massive structures
3. IS:3370 (Parts 1 to 4) Code of practice for concrete structures for storage of liquids.
4. IS:3935 Code of practice for composite construction
5. IS:2204 Code of practice for construction of reinforced concrete shell roof.
6. IS:2210 Criteria for the design of reinforced concrete shell structures and folded plates.
7. IS:2502 Code of practice for bending and fixing of bars for concrete reinforcement
8. IS:5525 Recommendation for detailing of reinforcement in reinforced concrete works
9. IS:2751 Code of practice for welding of mild steel plain and deformed bars used for reinforced concrete construction
10. IS:9417 Specification for welding cold worked bars for reinforced concrete construction
11. IS:3558 Code of practice for use of immersion vibrators for consolidating concrete
12. IS:3414 Code of practice for design and installation of joints in buildings
13. IS:4326 Code of practice for earthquake resistant design and construction of building
14. IS:4014 (Part 1 and 2) Code of practice for steel tubular scaffolding
15. IS:2571 Code of practice for laying in-situ cement concrete flooring
16. IS:7861 Code of practice for extreme weather concreting
(Part-1) Recommended practice for hot weather concreting
(Part-2) Recommended practice for cold weather concreting.
CODE FOR CONSTRUCTION SAFETY
CODE FOR MEASUREMENT
1. IS:1200 (Part 1 to 28)
Method of measurement of building and engineering works
2. IS:3385 Code of practice for measurement of Civil Engineering works
1. IS:3696(Part 1 and III) Safety code for scaffolds and ladders
Signature of Bidder Page 39 of
Ahmedabad Municipal Corporation
2. IS:7969 Safety code for handling and storage of building materials
3. IS:8989 Safety code for erection of concrete framed structures
Engineer shall have the right at all times to inspect all operations including the sources of materials, procurements,
layout and storage of materials, the concrete batching and mixing equipment, and the quality control system. Such an
inspection shall be arranged and Engineer’s approval obtained, prior to starting of
concrete work. This shall, however, not relieve Contractor of any of his responsibilities. All materials does not conform
to this specification shall be rejected. Materials should be selected so that they can satisfy the design requirements of
strength, serviceability, safety, durability and finish with due regards to the functional requirements and the
environmental conditions to which the structure will be subjected. Materials complying with codes/standards shall
generally be used; other materials may be used after approval of the Engineer and after establishing their performance
suitability based on previous data, experience or tests.
Unless otherwise specified or called for by the Engineer, cement shall be Ordinary Portland Cement to IS: 12330 (latest
edition) for entire work. Where Portland pozzolana or slag cement are used, it shall be ensured that consistency of
quality is maintained, there will be no adverse interactions between the materials and the finish specified is not
marred. Only one type of cement shall be used in any one mix. The source of supply, type or brand of cement within
the same structure or portion thereof shall not be changed without approval from Engineer.
Cement which is not used within 90 days from its date of manufacture shall be tested at a laboratory approved by
Engineer and until the results of such tests are found satisfactory, it shall not be used in any work.
“Aggregate” in general designates both find and coarse inert materials used in the manufacture of concrete (vide BIS
456 and BIS 383) and conforming to tests as per BIS 2386 (Part 1 to VI). “Coarse Aggregate” is aggregate most of which
is retained when passed through on 4.75 mm BIS sieve.All fine and coarse aggregates prFoposed for use in the works
shall be subject to the Engineer-in-charge’s approval and after specific materials have been accepted, the source of
supply of such materials shall not be changed without prior approval of the Engineer-in-charge.
Aggregates shall consist of natural sand, stone (crushed or uncrushed) and gravel from a source known to produce
satisfactory aggregate for concrete and shall be chemically inert, non-flaky, strong, hard, durable against weathering,
or limited porosity and free from deleterious materials that may cause corrosion of the reinforcement or may impair
the strength and or durability of concrete. The grading of aggregates shall be such as to produce a dense concrete of
specified strength and consistency that will work readily into position without segregation and shall be based on the
“mix design” and preliminary tests on concrete specified later.
SAMPLING AND TESTING
Samples of the aggregates for mixed design and determination of suitability shall be taken under the supervision of the
Engineer-in-charge and delivered to the laboratory, well in advance of the scheduled placing of concrete, Records of
Signature of Bidder Page 40 of
Ahmedabad Municipal Corporation
tests, which have been made on proposed aggregates and on concrete made from this source of aggregates shall be
furnished to Engineer-in-charge in advance of the work, for use in determining aggregate suitability. The costs of all
such tests, sampling etc. shall be borne by the contractor.
STORAGE OF AGGREGATE
All coarse and fine aggregates shall be stacked separately in stock piles in the material yard near the work site in bins
properly constructed to avoid inter mixing of different aggregates. Contamination with foreign material and earth
during storage and while heaping the materials shall be avoided. The aggregates must be
of specified quality not only at the time of receiving at site but more so at the time of loading into mixer. Rakers shall
be piled in layers not exceeding 1.20 m in height to prevent coning or segregation. Each layer shall cover the entire
area of stock pile before succeeding layers are started. Aggregates that have become segregated shall be rejected.
SPECIFIC GRAVITY
Aggregates having a specific gravity below 2.4 (saturated surface dry basis) shall not be used:
Fine aggregate shall consist of natural or crushed sand conforming to IS 383 conforming to tests as per 2386 1 to IV.
The sand shall be clean, sharp, hard, strong and durable and shall be free from dust, vegetables substances, adherent
coating, clay, alkali, organic, matter mica, salt or other deleterious substances, which can be injurious to the setting
qualities/strength/durability of concrete.
SCREENING AND WASHING:
Sand shall be prepared for use by such screening or washing, or both, as necessary, to remove all objectionable foreign
matter while separating the sand grains to the required size fraction.
FOREIGN MATERIAL LIMITATIONS:
The percentage deleterious substances in sand delivered to the mixer shall not exceed the following:
Unless otherwise directed or approved by the Engineer-in-charge, the grading of sand shall be within the limits
indicated hereunder:
Where the grading falls outside the limits of any particular grading zone of sieves, other than 600 microns IS sieve, by
total amount not exceeding 5%, it shall be regarded as falling within that grading zone. This tolerance shall not be
total amount not exceeding 5%, it shall be regarded as falling within that grading zone. This tolerance shall not be
applied to percentage passing the 600 micron IS sieve or to percentage passing any other sieve on the coarser limit of
grading zone 1 or the finer limit of grading zone IV. Fine aggregates conforming to grading zone IV shall not be used.
Mix designs and preliminary tests shall show its suitability for producing concrete of specified strength and workability.
FINENESS MODULUS
The sand shall have a fineness modulus of not less than 2.2 or more than 4.2. The fineness modulus is determined by
adding the cumulative percentages retained on the following IS sieve sizes (4.75 mm, 2.35 mm, 1.18 mm, 600 microns
and 150 microns) and dividing the sum by
COARSE AGGREGATE
Signature of Bidder Page 41 of
Ahmedabad Municipal Corporation
Coarse aggregate for concrete, except as noted above, shall conform to IS 383 and IS 2386. This shall consist of crushed
stone and shall be clean and free from elongated, flaky or laminated pieces, adhering coatings, clay lumps, coal
residue, clinkers, slag, alkali, mica, organic matter or other deleterious matter.
Sr.No. Foreign Material Percentage by weight Uncrushed Crushed
1. Material finer than 75 micron IS sieve 3.0
2. Shale 1.0 --
3 Coal and Lignite 1.0
4 Clay Lumps 1.0
IS: Sieve Designation
SCREENING AND WASHING:
Crushed rock shall be screened and or washed for the removal of dirt or dust coating, if so requested by the
Engineer In charge.
Coarse aggregate shall be either in single size or graded, in both cases the grading shall be within the
following units:
Signature of Bidder Page 42 of
Ahmedabad Municipal Corporation
Percentage passing for single sized
aggregate of normal size
Percentage passing for graded
aggregate of normal size.
Signature of Bidder Page 43 of
Ahmedabad Municipal Corporation
The pieces shall be angular in shape and shall have granular or crystalline surfaces. Friable, flaky and laminated pieces,
mica and shale, if present, shall be only within tolerance limits which will not affect adversely the strength and or
durability or concrete. The maximum size of coarse aggregate shall be 40 mm for M 7.5 and M 10 and 20mm for M15
to M20 concrete, or as directed by the Engineer-in-Charge or specified otherwise. The maximum size of coarse
aggregate shall be the maximum size specified above but in no case greater than 1/4th of the minimum thickness of
the number, provided that the concrete can be placed without difficulty so as to surround all reinforcement
thoroughly and fill the corners of the form. For plain concrete the maximum size of aggregate shall be of 40 mm. For
heavily reinforced concrete members, the nominal maximum size of the aggregate shall be 5 mm less than the
minimum clear distance between the reinforcing main bars or 5 mm less than the minimum cover reinforcement
whichever is smaller.
FOREIGN MATERIAL LIMITATIONS
The percentage of deleterious materials in the aggregate delivered to the mixer shall not exceed thefollowing:
Water used for both mixing and curing shall conform to IS: 456. Potable water is generally satisfactory. Water
containing any excess of acid, alkali, sugar or salt shall not be used.
Reinforcement bars shall conform to IS: 432 IS: 226 or IS: 1786 and the welded wire fabric to IS: 1566 as shown or
specified on the drawings.
All reinforcement shall be clean, free from pitting, oil, grease, paint, loose mill scales, rust, dirty dust or any other
substance that will destroy or reduce bond.
Sr. No. Foreign Material
Percentage by weight
Uncrushed Crushed
1. Material finer than 75 micron IS sieve 3.0
2. Coal and Lignite 1.0
3. Clay lumps 1.0
4. Soft fragments 3 .0 --
If permitted by Engineer, welding of reinforcement shall be done in accordance with IS: 2751 or IS: 9417 as applicable.
Accelerating, regarding, water reducing and air entraining admixtures shall conform to IS: 9013 and integral water
proofing admixtures to IS:
Signature of Bidder Page 44 of
Ahmedabad Municipal Corporation
Admixtures may be used in concrete as per manufacturer’s instructions only with the approval of Engineer based upon
evidence that with the passage of time neither the compressive strength nor its durability is reduced. An admixture’s
suitability and effectiveness shall be verified by trial mixes with the other material used in the work. If two or more
admixtures are to be used simultaneously in the same concrete mix, their interaction shall be checked and trial mixes
done to ensure their compatibility. There should also be no increase in risk of corrosion of the reinforcement or other
embedment.Calcium chloride shall not be used for accelerating set of the cement for any concrete containing
reinforcement or embedded steel parts. When calcium chloride is permitted such as in mass concrete works, it shall be
dissolved in water and added to the mixing water by an amount not exceeding 1.5 percent of the weight of the cement
in each batch of concrete. The designed concrete mix shall be corrected accordingly.
No wastage allowance for cement and steel shall be considered and paid for.
SAMPLES AND TESTS
All materials used for the works shall be tested before use. Manufacturer’s test certificate shall also be got tested by
the Contractor in a laboratory approved by Engineer at no extra cost to Client. However, where material is supplied by
client, all testing charges shall be borne by client, but transportation of material samples to the laboratory shall have to
be done by contractor at no extra cost.
Sampling and testing shall be as per IS: 2386 under the supervision of Engineer, The cost of all tests,sampling etc. shall
be borne by Contractor. Water to be used shall be tested to comply with requirement of IS: 456 Contractor shall
furnish manufacturer’s test certificates and technical literatures for the admixture proposed to be used. If directed the
admixture shall be got tested and approved laboratory at no extra cost.
STORING OF MATERIAL
All material shall be stored in a manner so as to prevent its deterioration and contamination which would prelude its
use in the works. Requirements of IS: 40-82 shall be complied with.Contractor will have to make his own arrangements
for the storage of adequate quantity of cement even if cement is supplied by client. Cost of such rejected cement,
where cement is supplied by client, shall be recovered at issue rate or open market rate which ever is higher. Cement
bags shall be stored in dry weatherproof shed with a raised floor, well away from the outer walls and insulated from
the floor to avoid moisture from ground. Not more than 15 bags shall be stacked in any tier. Storage arrangement shall
be approved by Engineer. Storage under Tarpaulins shall not be permitted. Each consignment of cement shall be
stored separately and consumed in its order or receipt.Each size of coarse and fine aggregates shall be stacked
separately and shall be protected from leaves and contamination with foreign material. The stacks shall be on hard,
clean, free draining bases, draining away from the concrete mixing area.
Contractor shall make his own arrangements for storing water at site in tanks to prevent contamination.
The reinforcement shall be stacked on top of timber sleepers to avoid contract with ground/water. Each type
and size shall be stacked separately.
Signature of Bidder Page 45 of
Ahmedabad Municipal Corporation
Concrete grade shall be as designated on drawings. In concrete grade M15, M20, M25 etc. the number represents the
specified characteristic compressive strength of 150 mm cube at 28 days, expressed in N/sq.mm as per IS:456.
Concrete in the works shall be “Design Mix Concrete” or Normal Mix Concrete” Allconcrete works of grade M5, M7.5
and M10 shall be nominal whereas all other grades, M15 and above,
shall be Design Mix Concrete.
DESIGN MIX CONCRETE
MIX DESIGN AND TESTING
For Design Mix Concrete, the mix shall be designed according to IS:10262 and SP:23 to provide the grade of concrete
having the required workability and characteristics strength not less than appropriate values given in IS:456. The
design mix shall in addition be such that it is cohesive and does not segregate and
should result in dense and durable concrete and also capable of giving the finish as specified. Fort water retaining
structures the mix shall also result in water with concrete. The contractor shall exercise great care while designing the
concrete mix and executing the works to achieve the desired result.
Unless otherwise specifically mentioned, the minimum cement content for design mix concrete shall be as given
Grade of Concrete Minimum cement content
In Kg/Cu.m of concrete
The minimum cement content stipulated above shall be adopted irrespective of whether the contractor achieves the
desired strength with less quantity of cement. The contractor’s quoted rates for concrete shall provide for the above
eventually and nothing extra shall become payable to the contractor in this account.Even in the case where the
quantity of cement required is higher than that specified above to achieve desired strength based on an approved mix
design, nothing extra shall become payable to the contractor. It shall be contractor’s sole responsibility to carry out the
mix designs at his own cost. He shall furnish to Engineer atleast 30 days before concreting operations, a statement of
proportions proposed to be used for various concrete mixes and the strength results obtained. The strength
requirements of the concrete mixes ascertained on 150 mm cubes as per IS: 516 shall comply with the requirements of
Grade of Concrete Minimum Compressive Strength (N/Sq.mm at 7 days)
Specified compressive strength (N/Sq.mm at 28 days)
Signature of Bidder Page 46 of
Ahmedabad Municipal Corporation
A range of slumps, which shall generally be used for various types of construction unless otherwise instructed by the
Engineer, is given below:-
Structure/member Slump in millimeters
Maximum Minimum
Reinforced foundation walls and footings 75
Plain footings, caissons and substructure walls 75
T.G. and massive compressor foundations 50
Slabs, beams and reinforced walls 100
Pumps and miscellaneous equipment foundations 75
Building columns 100
Heavy mass construction 50
BATCHING AND MIXING OF CONCRETE
Proportions of aggregates and cement, as decided by the concrete mix design, shall be by weight. These proportions
shall be maintained during subsequent concrete batching by means of weigh batchers capable of controlling the
weights within one percent of the desired value. Amount of water added shall be such as to produce dense concrete of
required consistency, specified strength and satisfactory workability and shall be so adjusted to account for moisture
content in the aggregates. Water cement ratio specified shall be maintained. Each time the work stops, the mixer shall
be cleaned out, and while recommending the first batch shall have 10% additional cement to allow for sticking in the
drum, Arrangement should be made by contractor to have the cubes tested in an approved laboratory or in field at his
own expense, with prior consent of Engine4re. Sampling and testing of strength and workability of concrete shall be as
per IS: 1199, IS: 516 and IS:
NOMINAL MIX CONCRETE
Mix design and preliminary tests are not necessary for Nominal mix concrete. However works tests shall be carried out
as per IS: 456. Proportions for Nominal Mix Concrete and water/cement ratio may be adopted as per Table 3 of IS:
However it will be contractor’s sole responsibility to adopt appropriate nominal mix proportions to yield the specified
BATCHING AND MIXING CONCRETE
Based on the adopted nominal mixes, aggregates and cement shall be measured by weight.
PREPARATION PRIOR TO CONCRETE PLACEMENT
Signature of Bidder Page 47 of
Ahmedabad Municipal Corporation
Before concrete is actually placed in position, the inside of the form work shall be cleaned and mould oil applied,
inserts and reinforcement shall be correctly positioned and securely held, necessary openings pockets etc. provided.
All arrangements formwork, equipment and proposed procedure, shall be approved by Engineer. The Contractor shall
maintain separate Pour Card for each pour as per the format enclosed and shall produce before commencement of
concreting to Engineer-in-charge.
TRANSPORTING, PLACING AND COMPACTING CONCRETE
Concrete shall be transported from the mixing plant to the formwork with minimum time lapse by methods that shall
maintain the required workability and will prevent segregation, loss of any ingredients or ingress of foreign matter or
In all cases concrete shall be deposited as early as practicable directly in its final position. To avoid segregation
concrete shall not be re-handled or caused to flow. For locations where direct placement is not possible and in narrow
forms. The Contractor shall provide suitable drops and “Elephant Trunks” Concrete shall not be dropped from a height
of more than 1.0 mm as stipulated in clause D.6.8.13.
Concrete shall not be placed in flowing water. Under water, concrete shall be placed in position by tremies or by
pipeline from the mixer and shall never be allowed to fall freely through the water. While placing concrete the
Contractor shall proposed as specified below and also ensure the following:
a) Continuously between construction joints and predetermined abutments.
b) Without disturbance to forms or reinforcement.
c) Without disturbance to pipes, ducts, fixings and the like to be cast in; ensure that such items are securely fixed.
Ensure that concrete cannot enter open ends of pipes and conduits etc.
d) Without dropping in a manner that could cause segregation or shock.
e) In deep pours only when the concrete and framework designed for this purpose and by using suitable chutes or
f) Do not place if the workability is such that full compaction cannot be achieved.
g) Without disturbing the unsupported sides of excavations; prevent contamination of concrete with earth. Provide
sheeting if necessary. In supported excavations, withdraw the lining progressively as concrete is placed.
h) If placed directly on to hardcore or any other porous material, dampen the surface to reduce loss of water from the
i) Ensure that there is no damage or displacement to sheet membranes.
j) Record the time and location of placing structural concrete. Concrete shall normally be compacted in its final
position within thirty minutes of leaving the mixer. Concrete shall be compacted during placing with approved
vibrating equipment without causing segregation until it forms a solid mass free from voids thoroughly worked around
reinforcement and embedded fixtures and into all corners of the formwork. Immersion vibrators shall be inserted
vertically at points not more than 450 mm apart and withdrawn slowly till air bubbles cease to come to surface, leaving
no voids. When placing concrete in layers advancing horizontally, care shall be taken to ensure adequate vibration,
blending and melding of concrete between successive layers. Vibrators shall not be allowed to come in contract with
Signature of Bidder Page 48 of
Ahmedabad Municipal Corporation
reinforcement, formwork and finished surfaces after start of initial set. Over vibration shall be avoided.Concrete may
be conveyed and placed by mechanically operated equipment after getting the complete procedure approved by
Engineer. The slump shall be held to the minimum necessary for conveying concrete by this method. When concrete is
to be pumped concrete mix shall be specifically designed to suit pumping. Care shall be taken to avoid stoppages in
work once pumping has started.Except when placing with slip forms, each placement of concrete in multiple lift work,
shall be allowed to set for at least 24 hours after the final set of concrete before the start of subsequent placement.
Placing shall stop when concrete reaches the top of the opening in walls or bottom surface of slab, in slab and beam
construction, and it shall be resumed before concrete takes initial set but not until it has had time to settle as
determined by Engineer. Concrete shall be protected against damage until final acceptance.
Curing and protection shall start immediately after the compaction of concrete to protect it from:
(a) Premature drying out, particularly by solar radiation and wind;
(b) Leaching out by rain and flowing water;
(c) Rapid cooling during the first few days after placing;
(d) High internal thermal gradients;
(e) Low temperature of frost;
(f) Vibration and impact which may disrupt the concrete and interfere with its bond to the reinforcement.All concrete,
unless directed otherwise by Engineer, shall be cured by use of continuous sprays or pounded water or continuously
saturated coverings of sacking, canvas, hessian or other absorbent material for the period of complete hydration with
a minimum of 7 days. The quality of curing water shall be the same as that used for mixing.Where a curing membrane
is directed to be used by the Engineer, the same shall be of a non-wax base and shall not impair the concrete finish in
any manner. The curing compound to be used shall be got approved from the Engineer before use and shall be applied
with spraying equipment capable of a smooth, even textured coat. Curing may also be done by covering the surface
with an impermeable material such as polyethylene, which shall be well sealed and fastened. Extra precautions shall
be exercised in curing concrete during cold and hot weather.
CONSTRUCTION JOINTS AND KEYS
Construction joints will be as shown on the drawing or as approved by Engineer. Concrete shall be placed without
interruption until completion of work between construction joints. If stopping of concreting becomes unavoidable
anywhere, a properly formed construction joint shall be made with the approved of Engineer. Dowels for concrete
work, not likely to be taken up in the near future, shall be coated with cement slurry and encased in lean concrete as
indicated on the drawings or as directed by Engineer. Before resuming concreting on a surface which has hardened all
laitance and loose stone shall be thoroughly removed by wire brushing/hacking and surface washed with high pressure
water jet and treated with thin layer of cement slurry for vertical joints and a 15 mm thick layer of cement sand mortar
for horizontal layers, the ratio of cement and sand being the same as in the concrete mix. When concreting is to be
resumed on a surface which has not fully hardened, all laitance shall be removed by wire brushing, the surface wetted,
free water removed and a coat of cement slurry applied. On this a layer of concrete not exceeding 150 mm thickness
shall be placed and well rammed against the old work. There after work shall proceed in the normal way.
FOUNDATION BEDDING
Signature of Bidder Page 49 of
Ahmedabad Municipal Corporation
All earth surfaces upon which or against which concrete is to be placed, shall be well compacted and free from
standing water, mud or debris. Soft or spongy area shall be cleaned out and back filled with either soil
cement mixture, lean concrete or clean sand compacted as directed by Engineer. The surfaces of absorptive
soils shall be moistened.
The frame work for concrete works shall be such as to give the finish as specified; defects due to bad
workmanship (e.g. damaged or misaligned forms, defective or poorly compacted concrete) will not be
accepted. The Contractor shall construct the formwork using the correct materials and to meet the
requirements of the design and to produce finished concrete to required dimensions, plumbs, planes and
REPAIR AND REPLACEMENT OF UNSATISFACTORY CONCRETE
Immediately after the shuttering is removed, all the defective areas such as honey combed surfaces, rough patches,
holes left by form bolts etc. shall be brought to the notice of Engineer who may permit patching of the defective areas
or reject the concrete work. All though holes for shuttering shall be filled for full depth and neatly plugged flush with
surface. Rejected concrete shall be removed and replaced by Contractor at no additional cost to Client.For patching of
defective areas all loose materials shall be removed and the surface shall be prepared as directed by the
Engineer.Bonding between hardened and fresh concrete shall be done either by placing cement mortar or by applying
epoxy. The decision of the Engineer as to the method of repairs to be adopted shall be final and binding on the
Contractor and no extra claim shall be entertained on this account. The surface shall be saturated with water for
hours before patching is done with 1:5 cement sand mortar. The use of epoxy for bonding fresh concrete shall be
carried out as directed by Engineer.
HOT WEATHER REQUIREMENTS
Concreting during hot weathers shall be carried out as per IS: 7861 (Part-I) Adequate provisions shall be made to lower
concrete temperatures which shall not exceed 40 Deg. C at the time of placement of fresh concrete.Where directed by
Engineer, Contractor shall spray non-wax based curing compound of unformed concrete surfaces at no extra costs.
COLD WEATHER REQUIREMENTS
Concreting during cold weather shall be carried out as per IS : 7861 (Part-II). The ambient temperature during
placement and upto final set shall fall below 5 Deg. C. Approved antifreeze/accelerating additives shall be used where
directed.For major and large scale concreting works the temperature of concrete at time of mixing and placing, the
thermal conductivity of the formwork and its insulation and stripping period shall be closely monitored.
LIQUID RETAINING STRUCTURES
The Contractor shall take special care of concrete for liquid retaining structures, underground structures and those
others specifically called for to guarantee the finish and water tightness. The minimum level of surface finish for liquid
retaining structures shall be as per clause D.6.16. All such structures shall be hydro-tested.The contractors shall include
in his price of hydro-testing of structure, all arrangements for testing such as temporary bulk heads, pressure gauges,
pumps, pipelines etc.Any temporary arrangements that may have to be made to ensure stability of the structures shall
also be considered to have been taken into account while quoting the rates.Any leakage that may occur during the
hydro-test or subsequently during the defects liability period or the period for which the structure is guaranteed shall
Signature of Bidder Page 50 of
Ahmedabad Municipal Corporation
be effectively stopped either by cement/epoxy pressure grouting, gunting or such other methods as may be approved
by the Engineer. All such rectification of the Client / Engineer at no extra cost to the Client.
TESTING CONCRETE STRUCTURE FOR LEAKAGE
Hydro-static test for water tightness shall be done at full storage by Engineer, as described below:
In case of structures whose external faces are exposed, such as elevated tanks, the requirements of the test shall be
deemed to be satisfied if the external faces show no sign of leakage or sweating and remain completely dry during the
period of observation of seven days after allowing a seven day period for absorption after filling with water.In case of
structures whose external faces are submerged and are not accessible for inspection, such as underground tanks, the
structures shall be filled with water and after the expiry of seven days after filling,the level of the surface of the water
shall be recorded. The level of water shall be recorded again at subsequent intervals of 24 hrs, over a period of seven
days. Backfilling shall be withheld till the tanks are tested. The total drop in surface level over a period for seven day
shall be taken as an indication of the water tightness of the structure. The Engineer shall decide on the actual
permissible nature of this drop in the surface level, taking into account weather the structures are open or closed and
the corresponding effect it has on evaporation losses. Unless specified otherwise, a structure whose top is covered
shall be deemed to be water tight if the total drop in the surface level over a period of seven days does not exceed
Each compartment/segment of the structure shall be tested individually and then all together.For structures such as
pipes, tunnels etc. the hydro-static test shall be carried out by filling with water, after curing as specified, and
subjecting to the specified test pressure for specified period. If during this period the loss of water does not exceed the
equivalent of the specified rate, the structure shall be considered to have successfully passed the test.
If Engineer feels that the materials i.e. .cement, sand coarse aggregates, reinforcement and water are not in
accordance with the specifications or if specified concrete strengths are not obtained, he may order tests to be carried
out on these materials in laboratory, to be approved by the Engineer, as per relevant IS Codes. Client shall pay only for
the testing of material supplied by the Client, otherwise Contractor shall have to pay for the tests. Transporting of all
material to the laboratory shall however be done by the Contractor at no extra cost to client. In the even of any work
being suspected of faulty material or workmanship requiring its removal or if the works cubes do not give the
stipulated strengths, Engineer reserves the right to order the Contractor to take out cores and conduct tests on them
or do ultrasonic testing or load testing of structure, etc. All these tests shall be carried out by Contractor at no extra
cost to the Client. Alternatively Engineer also reserves the right to ask the Contractor to dismantle and re-do such
unacceptable work at the cost of Contractor. If the quoted unit rates/prices of concrete shall be deemed to provide for
all tests mentioned above.
All materials, workmanship and finished construction shall be subject to continuous inspection and approval of
Engineer. Materials rejected by Engineer shall be expressly removed from site and shall be replaced by Contractor
immediately at no extra cost to Client.
Upon the completion of concrete work, all forms, equipment, construction tools, protective coverings and
any debris, scraps of wood etc. resulting from the work shall be removed and the premises left clean.
ACCEPTANCE CRITERIA
Signature of Bidder Page 51 of
Ahmedabad Municipal Corporation
Any concrete work shall satisfy the requirements given below individually and collectively for it to be acceptable.
a) Properties of constituent materials;
b) Characteristic compressive strength;
c) Specified mix proportions;
d) Minimum cement content;
e) Maximum cement content;
f) Workability;
g) Temperature of fresh concrete;
h) Density of fully compacted concrete;
i) Cover to embedded steel;
k) Tolerances in dimensions;
l) Tolerances in levels;
n) Surface finishes;
o) Special requirements such as :
(i) Water tightness;
(ii) Resistance to aggressive chemicals
(iii) Resistance to freezing and thawing
(iv) Very high strength
(v) Improved fire resistance
(vi) Wear resistance
(vii) Resistance to early thermal cracking
The Engineer’s decision as to the acceptability or otherwise of any concrete work shall be final and binding of the
Contractor. For work not accepted, the Engineer may review and decide whether remedial measures are feasible so as
to render the work acceptable. The Engineer shall in that case direct the Contractor to undertake and execute the
remedial measures. These shall be expeditiously and effectively implemented by the Contractor.Nothing extra shall
become payable to the Contractor. Nothing extra shall become payable to the Contractor by the Client for executing
the remedial measures.
Item No:08 Constructing Slab type Chamber of following size including excavation, refilling, BBCC (1:5:10), for
foundation, C.C.Channel (1:2:4) finished, 15 mm thick cement plaster inside & outside in CM 1:3, finishing
with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered masonary in
CM 1:5, RCC Slab in CC 1:1.5:3, including Centering & reinforcement but excluding the cost of chamber seat
cover etc..completed.(a) A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia
(B) 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=20 mm. (C) 0.75 X
mt. size (Inside Clear) Depth from 0.0 to 1.20 meter for pipe dia <=230 mm
The inspection chamber shall be constructed as per plan and section approved by the city engineer. The
specification for different items are as under:
This shall be done as per specification in Item No.
Signature of Bidder Page 52 of
Ahmedabad Municipal Corporation
(ii) Brickbats cement concrete in proportion (1:5:10) For detailed specification refer R & B Dept. booklet
for General Technical Specification for building works , Page no. 31 , Section. No. 5.3.8(a)
(iii) Brickwork(1:5): For detailed specification refer R & B Dept. booklet for General Technical Specification
for building works , Page no. 43 , Section. No. 6.12(B).
(iv) C.C. Channels : Cement concrete of the invert and channels of manholes shall consist on a part 1 part of
cement 2 part of sand, 4 part of black trap metal or other approved material of size 1/4' to 1' well grade as per
The work shall be done as per P.W.D. hand book specification No. 20 and as per general instruction of C.E. The
rate includes all necessary materials mixing lifting placing ramming watering etc. the expressed faces to be
neatly of the channels shall be half round as per drawing and instructions of the engineer in charge.
(V)Cement Plaster(1:3) :For detailed specification refer R & B Dept. booklet for General Technical Specification
for building works , Page no. 104 , Section. No. 17.58(I) Except that the thickness of the plaster shall be
mm instead of 10 mm.
FRC SEAT COVER:
Frame shall be fixed in cement concrete all around and finished with neat cement. The. F.R.C (L.D.-25)
chamber seat and cover shall be as per central store approved design. Cover [ 706 x 556 x 50 mm rectangular
cover. 2.5 mt load design 50 x 2 mm MS flat all round. 12 mm ǿ plain round bar for lifting the cover & should
be fitted with plastic caps ] and frame [ 600 x 450 mm clear opening, outer size 816x 666x100 mm.on the
upper periphery of frame 25 x 3 mm wide M.S. flat should be well embedded in concrete to protect the edge
of frame ]etc.comp..
The M/s shall be on No. Basis.
Item No.09 Labour work for fixing any kind of paving with cement pointing in CM 1:2, including watering,
ramming etc. comp. as dir. For pavement. (I) Laying on Sand bedding as per requirement to fix the C.C.Block /
Nibhada Stone in Line & Level
Work shall be carried out as per item description including cost of all labour and materials etc. complete as
directed. General standard practice of laying of paver block is applicable.
The measurements shall be on Smt. basis.
Supplying and fixing Nimbhada ladi 37 to 50 mm thick for walk-way, covering the activity of excavation, ramming,
Laying on sand bedding as per requirement to fix the Nibhada Stone in Line & Level with cement pointing in cement
mortar 1:2 etc complete as directed.
1. Nimbhada stone : The material shall conform to M-48 Page No.-16 except that the stone shall be of
ordinary nimbhada stone instead of rough kota stone .
2. Sand : As per buiding booklet M-6 Page No.4.
3.Cement : As per buiding booklet M-3 Page No.3.
The work man ship shall conform to buiding booklet section no. 14,-14.46 (A), 2.0 page no.-
Signature of Bidder Page 53 of
Ahmedabad Municipal Corporation
Mode of measurment shall be on smt basis
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any size ; shape
(Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for footpath, parking
areas, service lanes and other areas as mentioned in the drawing / instruction of Engineer-in-Charge and/or his
authorized representative. Cost includes formworks using rubber mould, Rate providing and laying paver blocks as
per required grading and specification. The paver block shall be mechanically compacted. The work of paving blocks
shall be executed in line and level by skill mason of flooring work only. It should be laid in such a way that the no
cutting of the paver block to be necessary. if cutting of paver block necessary then it should be cut by machine only
and carting. The finished surface of the paver block shall have resonably good, plain finished. Paver blocks shall be
compacted and shall be relaid if necessary. Gravel or such type of materials shall not be allowed for production.
Laying on 50 mm thick sand bedding.
• Laying on 50 mm thick sand bedding.
Scope of work :
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil murrum including
sorting outs and stacking of useful materials stuff up to 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various Retail
outlets. The work includes: Verification of the existing site condition and advising our project in charge to lay
suitable base course if required. Contractors are required to satisfy themselves with quality of sub grade,
sub-base course before the paver blocks are laid and suggest strengthening if required.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
Manufacturing of paver blocks in your plant as per requirements in technical specification enclosed.
Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand bedding,
within shortest possible time the site is public place hence care should be taken to ensure that the routine
activities should not be disturbed. The job of laying may required to be carried out during night also.Testing
of paver blocks shall through reputed Govt. /Non Govt. Test house only and submission of test results as
per requirements in Technical Specifications. AMC reserves the right to carryout test at random. Cost for
such tests to be borne by party. The contractor shall guarantee that all material and components designed,
fabricated, supplied, and laid by him shall be free from any type of defect due to faulty material and/or
workmanship/erection for a period of One year from the date of completion of work. However, the
contractor one year's shall render free maintenance.
TECHNICAL SPECIFICATIONS:
Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of compaction
by application of hydraulic compaction and also by high intensity vibration to the moulds. The machine
should have automatic control panel
for uniformity in strength.
Signature of Bidder Page 54 of
Ahmedabad Municipal Corporation
Concrete Batching & Mixing Plant: (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient should be
mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should
equipped with automatic control panel for maintaining water cement ratio from batch to batch to obtain
concrete of uniform quality and strength. The plant should be equipped with adequate mechanism for
mechanized loading of raw materials into mixer and conveyor belt for transportation of concrete from mixer
to concrete block making machine to maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks.
Laboratory (Desirable but not essential) :
The testing equipment should have required in the Laboratory as per the following: A Compression testing
machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
Systematic record of test results of various paver blocks manufactured in the factory. Concrete Mix Design
for various grade of concrete used for making of paver blocks.
Specifications For Coloured Paver Blocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or equivalent
approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour
pigment of 3% by weight of cement. The colour shade shall be “RED” as selected by AMC before
commencement of the work. White cement shall be used for colored pavers to obtain the desired colour
shade. The job also includes providing 50 mm thick sand bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the
date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as per
Pavers Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should be
retained until the laying. The surface should be reasonably smooth and of anti skid and anti glare type. The
paver should have uniform chamfers to facilitate easy drainage surface run off. The pavers should have
uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after vibration on the paver
Surface. The concrete mix design should be followed for each batch of materials separately and automatic
batching plant is to be used to achieve uniformity in strength and quality. The pavers shall be manufactured
in single layer only. Skilled labour should be employed for laying blocks to ensure line and level of laying,
desired shape of the surface and adequate compaction of the sand in the joints. The pavers shall be of
cement gray colour without any pigment & for coloured pavers refer “specifications for coloured pave`” The
pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X 250mm X
380mm. The kerbing should be embedded for 100mm depth. The concrete used for kerbing shall be cured
properly for 7 days minimum.
Paver Block Dimensions:
Signature of Bidder Page 55 of
Ahmedabad Municipal Corporation
Thickness 60 mm
Shape Unipaver, I shape or directed by Addl.C.E.
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of any pigment.
For coloured pavers refer “specifications for
coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
Testing of Paver Blocks :
SR. NO. TEST Average Values Frequency
1. Compressiv Strength Min. 35 N/Sq mm for 60 250 Smt / 1 Test
2. Flexural Strength Minimum 4.5 N/Sq mm
3. Abrasion Resistance Maximum 1.5 N/Sq mm
4. Water Absorption Maximum 5.80%
* Sampling and testing procedure as per enclosed specifications.
Sampling and Testing Procedure for Paver Blocks
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than 5000 blocks, shall be divided
into ten approximately equal groups. Three blocks shall be drawn from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated section of part
thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the
paving in transit. Protect the paving from damage and contamination until they have been tested. The
testing shall be carried as soon as possible, after the sample has been taken. As soon as practicable after
sampling. The samples shall be stored in water at 20 degree C 5 degree C for 24 hours prior to testing.
The item is to be executed as per instructions and to the entire satisfaction of Engineer-in-Charge and/or his
authorized representative using Rubber mould and Table vibrator for Kerb instead of mechanical press
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet,
metal, soling etc. complete with stacking the materials as directed. The road surface of asphalt shall carefully
be opened to full width as directed by the Engineer-in-Charge and/or his authorized representative.
Excavation area shall be properly identified and marked in rectangular shape. The road crust shall be opened
up to entire depth i.e. including soling. All the materials shall be separately deposited in such a way and in
places as may be determined by the Engineer-in-Charge and/or his authorized representative. In case rubble
not being so deposited or being mixed up with the excavated materials will not be allowed for refilling. The
Signature of Bidder Page 56 of
Ahmedabad Municipal Corporation
cost of materials shall be charged from the contractor. The decision of the C.E. shall be final and binding to
For detailed specification for Laying of Paver Block on sand bedding, refer R & B Department booklet for
General Technical Specification for building works. The rate shall be for a unit of SMT.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb Block for Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork , mould with well equipped with vibratory system for kerb stones of approved design including
curing, etc. complete, including the cost of formwork etc. complete. The rate shall also include necessary cutting of
asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and
materials. The rate shall also include the flush pointing in CM (1:3) for all joints of the kerbstones. Filling of zari
alone the sides of the kerb stone fixed with Bituminous concrete mixed in proper position as directed by Engineer in
change to form a portable mixture. In any case Gravel or such type of materials shall not be allowed for production.
a) Laying on 5 cm thick Sand Bedding.
Supplying and fixing M-20 grade using black trap aggregate of Sevaliya/Timba or equivalent quality
mm. nominal size for pre-cast reasonably exposed finish/, formwork using mould with well equipped with vibratory
system for kerb stones of approved design including curing, etc. complete, including the cost of formwork etc.
complete. The rate shall also include excavation and erecting and fixing the kerbs in position with necessary
equipments and materials. The rate shall also include the flush pointing in CM (1:3) for all joints including kerb stones
of approval design (Sample must be got approved). In any case Gravel or such type of materials shall not be allowed
for production .a) Laying on 5 Cms thick Sand Bedding Kerb Stone Fixing 300mm-L x 150mm-B x 380mm-H :-
Supplying and fixing M-20 grade using black trap aggregate of Sevaliya/Timba or equivalent quality 20 mm.
nominal size for pre-cast reasonably exposed finish/, formwork using mould with well equipped with vibratory system
for kerb stones of approved design including curing, etc. complete, including the cost of formwork etc. complete. The
rate shall also include excavation and erecting and fixing the kerbs in position with necessary equipments and
materials. The rate shall also include the flush pointing in CM (1:3) for all joints including kerb stones of approval
design (Sample must be got approved). In any case Gravel or such type of materials shall not be allowed for
production. a) Laying on 5 Cms thick Sand Bedding.
Water shall confirm to M-1. Cement to M-2. Sand to M-5. Grit to M-7. Graded stone aggregate 20 mm.
nominal size to M-10.
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific
machineries shall be used to manufacture the Precast blocks. These machineries should be compatible to produce
blocks of required strength and dimensions. The machine shall contain hydraulic Press or advanced equipment to
generate required compaction & Grade and finish. Moulds/ Steel Plates/ Dies of the machine shall be dimensionally
checked & to be got approved before commencing the production. Contractor shall prepare proper Drying Yard for
keeping the blocks before curing. The drying yard shall be levelled and covered so that no shrinkage cracks are
formed. Contractor shall prepare adequate size curing pond to cure the blocks for not less than 21 Days. No other
means of curing shall be allowed. The technical specification of concrete shall confirm to IS 456-2000. The concrete
Signature of Bidder Page 57 of
Ahmedabad Municipal Corporation
mix is not required to be designed and only nominal mix as per IS : 456-2000 shall be followed. The proportion of the
concrete mix shall be 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm. nominal size) by volume.
Concrete work shall have fairly exposed concrete surface or as specified in the item. The designation ordinary M-10,
M-15, M-20, M-25 specified as per I.S. corresponds approximately to 1:3:6, 1:2:4, 1:1.5:3 and 1:1:2 nominal mix of
ordinary concrete, by volume respectively. The ingredients required for ordinary concrete containing one bag of
cement of 50 Kg. by weight (0.0342 m3.) for different proportions of mix shall be as per IS 456-2000. The proportion
of the aggregate for the kerb stone shall be modified as per the approval of the engineer-in-charge. The water
cement ratios shall not be more than those specified as per IS. The cement of the mix shall be increased, if the
quantity of water in a mix has to be increased to overcome the difficulties of placement and compaction so that the
water cement ratio specified in the table is not exceeded. The maximum size of coarse aggregate shall be as large as
possible within the limits specified but in no case greater than 1/4th of the minimum thickness of the member,
provided that the concrete can be placed without difficulty so as to surround all reinforcement thoroughly and to fill
the corners of the form. For reinforced concrete work, coarse aggregates having a nominal size of 20 mm. are
generally considered satisfactory. Admixture shall be used in concrete only with approval of the Engineer-in-charge
based upon the evidence that with the passage of time, neither the compressive strength of concrete is reduced nor
are other requisite qualities of concrete impaired by the use of such admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of 50 Kg.
weight. The volume of one such bag being taken as 0.0342 m3. Boxes of suitable sizes shall be used for measuring
sand and aggregate. The size of the boxes (internal) shall be 30cm. x 30 cm. and 38 cm. deep. While measuring the
aggregate and sand, the box shall be filled without shaking ramming or hammering. The proportioning of sand shall
be on the basis of its dry volume and in case of damp sand, allowances for bulk age shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be kept in
first class working condition and maintained throughout the construction. Measured quantity of aggregate, sand
and cement required for each batch shall be poured into the drum of the mechanical mixer while it is continuously
running. After about half a minute of dry-mixing, measured quantity of water required for each batch of concrete mix
shall be added gradually and mixing continued for another one and a half minute. Mixing shall be continued till
materials are uniformly distributed and uniform colour of the entire mass is obtained and each individual particle of
the coarse aggregate shows complete coating of mortar containing its proportionate amount of cement. In no case
shall the mixing be done for less than 2 minutes after all ingredients have been put into the mixer. Mixers which
have been out of use for more than 30 minutes shall be thoroughly cleaned before putting in a new batch. Unless
otherwise agreed to by the Engineer-in-charge, the first batch of concrete from the mixture shall contain only 2/3rds
of normal quantity of coarse aggregate. Mixing plant shall be thoroughly cleaned before changing from one type of
cement to another.
The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete, shall be determined by regular slump tests in accordance with IS : 1199-1959. The slump of 10 mm. to
mm. shall be adopted when vibrators are used.
Signature of Bidder Page 58 of
Ahmedabad Municipal Corporation
All Moulds shall be cleaned and made free from standing water, dust, snow or ice immediately before placing
Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the Precast blocks. All the edges of the Precast blocks shall
confirm the profile of the final drawing & edges/ curvatures of the moulds shall be checked accordingly. Moulds shall
be regularly checked for correctness of dimensions of Blocks, twists, bends due to handling, etc.. before starting
every days work.
Care shall be taken to set all formwork/Mould in perfect line, level (or in required camber or slope as specified) and
plumb. Formwork/Mould propping shall be strong, rigid and sturdy. The formwork/Mould shall be as per pattern &
design shown in drawings. Formwork/Mould shall be done accurately and precisely so as to achieve neat, clean and
smooth concrete surface, in line, level and plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall
not be allowed. Before placing concrete, forms shall be thoroughly cleaned off of all rust, dust and loose materials.
Colorless oil or grease of approved quality shall be applied before placing steel. Also the formwork material will be of
wood/plywood/steel or any sort of such material, as approved by the Engineer in charge, so that all exposed concrete
surfaces have uniform colour.
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in charge)of cement shall be
Removal of Moulds:
Specific time shall be identified for removal of moulds, such that the concrete of the Precast blocks shall gain
strength to withstand the stresses generated due to self weight and handling to drying yards without any
deformation to shape/ dimensions/ edges.
Drying Period: Sufficient time shall be given to the block after it is removed from the mould so that it can gain
strength and dry in shade to prevent any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site:
Water should be drained of from the block before it is actually sent to the site. Time should be provided for
proper draining of water which may be present in the block kept for curing in the pond.
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses leading to breaking of
block. Care should be taken to prevent the block from breaking during transporting.
The pits of the size 0.15 M in width and required depth shall first be excavated, true to line and level. The
relevant specifications of item A- 1 shall be followed for excavation work. The pits shall be filled with a layer of
M. thick sand bedding. The curbs then shall be placed in position of which 50mm. shall be below road. Care should be
Signature of Bidder Page 59 of
Ahmedabad Municipal Corporation
taken to maintain proper line and level. The joints between the kerbs shall be pointed with C.M. 1:2 and cured for
minimum seven days.
Sampling and testing of concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, cured and tested at
7 days or 28 days as per requirements in accordance with IS : 516-1959. A random sampling procedure shall be
adopted to ensure that each concrete batch shall have a reasonable chance of being tested i.e. the sampling should
be spread over the entire period of concreting and cover all mixing units.
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each sample, 5 for
testing at 7 days and the remaining 5 at 28 days. The samples of concrete shall be taken on each day of the
concreting as per above frequency. The number of specimens may be suitably increased as deemed necessary by the
Engineer-in-charge when procedure of tests given above reveals a poor quality of concrete and in other special cases.
The average strength of the group of cubes cast for each day shall not be less than the specified cube strength of
Kg/cm2. at 28 days. 20% of the cubes cast for each day may have value less than the specified strength provided the
lowest value is not less than 85% of the specified strength. If the concrete made in accordance with the proportions
given for a particular grade, does not yield the specified strength, such concrete shall be classified as belonging to the
appropriate lower grade. Concrete made in accordance with the proportions given for a particular grade shall not,
however, be placed in a higher grade on the ground that the test strength are higher than the minimum specified. If
rock pockets/honeycombs in the opinion of Engineer-in-charge are of such an extent or character so as to effect the
strength of the structure, materially or to endanger the life of the steel reinforcement, he may declare the concrete
defective and require the removal and replacement of the portion of the structure affected.
Precast Kerb Stones :
The relevant specifications of concreting as per item above shall be followed except that work shall be carried
out for precast concrete kerb stones as specified in the item. All Precast members shall be cast at workshop.
Sufficient curing shall be done before placement of the same The method of transporting and placing the precast
members shall be as approved by the Engineer-in-charge. Members shall be so transported that no breakage or
undue stresses are induced in them. If required, all members shall have a key provided on both the faces i.e. top and
bottom surfaces, of adequate size so as to fill the same with concrete while laying. The function of this key is to avoid
the leakage through the joint between the precast member and the member on which it is laid.
Mode of Measurements and Payment :
The rate shall include cost of formwork but exclude the cost of reinforcement. The volume occupied by
reinforcement shall not be deducted from R.C.C. work.
Mode of measurements and payment: The rate shall be for a unit of Rmt.
(A) Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work and repairing by
brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and removing manhole cover and debris from
MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
Signature of Bidder Page 60 of
Ahmedabad Municipal Corporation
Relevant specification shall be followed as per item description : Repairing damaged M.H. and rasing M.H. up
to road level incl. removing damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in
C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the debris from MH and carting the
same as directed.
The measurement shall be in Nos. basis Manhole.
Repairing damaged I.C./Raising removing damaged brick work and repairing by brick masonry in C.M. 1:5 and
plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover, removing the debris from chamber and
carting the same as directed. (Based on Drainage SOR 2015-16 Item No.22)
Relevant specification shall be followed as per item description : Repairing damaged I.C. and rasing upto
road level incl. removing damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in
C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the debris from MH and carting the
same as directed.
The measurement shall be in Nos. basis Manhole.
Item No.15:- Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
(a) F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø & 100 mm thick
circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain round bar for lifting the
cover & should be fitted with plastic cups. Frame : 560 mm ø clear opening, outer size- 888x888x175
mm. On the upper periphery of frame 25 x 3 mm wide MS flat should be well embed in concrete to
protect the edges of frame. FRC E.H.D.-35 manhole cover & frame described as above (As Per Central Store)
(B) (SET cover and frame) F.R.C. Heavy Duty [HD-20] Machinehole Covers & Frames - 560 mm ø clear opening,
The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 :2002 table
(C) (SET cover and frame) F.R.C. Medium Duty [MD-10] Machinehole Covers & Frames - 560 mm ø clear
opening, The dimension of frame and cover as per mentioned in Amend No. 1 to IS 12592 :2002 table 1 (SET
cover and frame)
(D) (SET cover and frame) F.R.C. Light Duty [LD-2.5] Machinehole Covers & Frames - 560 mm ø clear opening,
The dimension of frame and cover as per mentioned in Amend No. 1 to IS 12592 : 2002 table
(E) (SET cover and frame) F.R.C. Medium Duty [MD-10] Chamber Covers & Frame - 600 x 450 mm clear opening,
The dimension of frame and cover as per mentioned in Amend No. 1 to IS 12592 : 2002 table
(F) (SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber Cover & Frame - 600 x 450 mm clear opening,The
dimension of frame and cover as per mentioned in Amend No. 1 to IS 12592 : 2002 table
(G) (SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber Cover & Frame - 450 x 450 mm clear opening,The
dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
The Item shall be carried as per Item mentioned in tender document and as per instruction of Engineer-in-
Charge and/or his authorized representative.
The mode of payment for this item shall be on Nos. Basis based on actual weight of Machine hole frame.
Signature of Bidder Page 61 of
Ahmedabad Municipal Corporation
Providing and fixing S.W. gully trap with C.I. grating brick masonry chamber and water tight C.I. cover with frame of
300mm x 300mm size (inside) with standard weight.(i) Square mouth traps.(B) 150mm x 100mm size P or R type
(Building S.O.R. 2023-24, I.C.24006B , Iteam No. As Per NBO 24.19)
Mode of measurements and payment: The rate shall be for a unit of No.
Item No : 17 & 18 Providing and supplying ISI marked only Standard length Stoneware pipes in
standard lengths of following class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance
to departmental stores, stacking etc.
(IS - 651 / 1989) (Based on GWSSB SOR 2022-23, Item No. 11.0 P-17)
100mm, 150mm,230mm AA Class
The pipes shall be of best quality stone ware pipes. The pipes shall be of approved quality and make and shall
be brought on site after approval. (The pipes shall be laid in grade as per instruction) contractor shall have
introduce bills for standard pipes.The joints shall be done in cement prop. (1 : 1) (1 part cement : 1 part sand)
using spun yarn dispend in hot asphalt and caulking tools. The hydraulic pressured test shall be given be the
contractor for testing pipes and jointing. No. trenches shall be filed without the approval of the Engineer in
charge. The rate of the pipes work are inclusive of excavation and refilling. The excavation etc. shall be done as
The sewet trench shall be excavated to the alignment and gradient shown on the plan and section. In all storts
soil including oil masonary asphalt roads and wet. excavation . The sewer excavation shall be commenced at the
down stream end of the sewer and be continued upto thegradient as directed. The trench shall not open more
than 60 meters in advace of the completed sewer only when directed by the Engineer in charge looking to the
progress of the work in obtaining the formation of the bottom of the trenches the usual methods of suing sight
rails and bonning roads shall be adopted during the whole of the process. The center line of uniform height
shall be carried clearly on each rail. The depth of the excavation and invert of the sewer shall be checked by
means of bonning road of appropriate length and also straight edge. The bed of the trench be shall well
remmed before starting laying of sewer lines and cement concrete and masonary work. Where trenches are
deep in bad grounds the sides shall be supported by suitable timbering of shorting work looking to the nature of
soil near big or important structures, the sides of the trenches shall be closely and securely timbered. If any
settlement of the building is anticipated the timbering shall be left in the ground. The various materials
excavated shall be separately stacked so that in refilling the may be relaid on the same order as before and
least possible damage shall be done carpet on the public roads and private properties. Surface covering
consisting of asphalt carpet shall be kept on one side and preserved for reinstatement. The excavated earth
shall not heaped near the renchers so as to caused unnecessary obstruction along the pulling inspection,
trenches etc. shall be tunneled under only as necessary. The side of the trenches shall be nearly vertical and
plumb & red light shall be placed at each end at intervals as instructed and further protested by rope fence.
Necessary caution boards shall also be erected and diaced as directed by the Engineer in charge. Wherever
possible material excavated from the trenches of whatever kind shall not placed nearer than 3 meters from the
outer edge of the excavated trench. The utmost shall have to be taken in refilling the trenches so that no
damage may be done no sewer no lump shall be allowed to be put around the sewer. The remming of the filling
Signature of Bidder Page 62 of
Ahmedabad Municipal Corporation
shall be done and well watered. The surplus earth shall be removed directed within 30 meters lead. The
measurement of the work shall be exact length and width of the trench as specified or as per City Engineer
instruction and depth shall be measured vertical as per section upto invert or the pipe lind The City Engineer
reserves the right of extra excavation on either side if considers necessary for the safely of the work. The
bottom and sides of the trench shall be dressed in level and plumb in all directions before any concrete in India.
In case the excavation is done deeper than required no filling shall be allowed to bring the formation to proper
level but contractor shall have to lay cement or lime be concrete of filling or other acceptable materials as
directed by C.E. at contractor won cost so as to come to proper information, in case bas formation are met with
the work shall have be done as per instruction of C.E. necessary arrangements for watering trenches must be
provided be contractor and without proper watering trenches will not be allowed to be tilled to further.
Contractor shall have to make arrangement for acees to invert of the sewer and for inspection of the ware as
ordered by the Engineer. If is required to shired or after the alignment section of diameter of the pip the
contractor shall carry or altered the alignment section or diameter of the pipe the contractor shall carry out the
altered work at the rates quoted by him for the original work for items and contractor shall not claim any
expenses due to the changes made. In case no work shall be done at night or on Sundays & other holidays and
during the recess time except in and other holiday the case of bad grounds such as running sand where the
work must be executed various day night without intruption when so ordered by the Engineer. All existing
water pipe storm drains sewer line railway tract, electric cables etc. which do not in the opinion of Engineer
required to be charged in location shall be supported and protected from injury by the contractor. The
contractor shall be liable to pay all damages to water pipe, drains electric and telephone cables and to private
property during the execution of this contract and the same will be recovered from the running bills or the
deposit of work whenever it becomes necessary in the opinion of the Engineer in charge location of any existing
sewers drains etc. not otherwise from in these specification the contractor shall do the work of making such
change and the work shall be paid for as extra work. All places of public utility etc. shall be kept accessible for
use. No extra payment shall be made for land sides and side slopes done without prior approval of the Engineer
in charge. Wherever natural soil commends winder excavation the mentioned above the same shall be given
after approved C.E. The rate for excavation for easy jointing and caulking nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the lines are
checked and approved of and order given by the Engineer in charge. The refilling shall be accompanied by
through watering the layers of 0.50 metrs. Further refilling shall be done there after and process should be
repeated till trenches are completely refilled. Temping and ramming with rammers shall have to be done at all
place of important work where ordered by Engineer in charge.
After the trench is give the trenches shall have to be refilled within 4 days with complete watering. If the
contractor fails to do watering satisfactory corporation shall get it done at the risk and cost of the contractor
with or without giving any notice and the expenses incurred in doing so recovered from the contactor either in
cost or from his payment through bills.
The rate shall be for a unit of one Rmt basis.
Constructing Bombay Pattern Type Catch Pit of size 600 mm x 600 mm & depth up to 1000 mm including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick masonry wall in the prop. of CM (1:6) with 40 mm thick
IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the catch pit in the
proportion of CM (1:3) without jali etc. comp. as directed by E.I.C.
Signature of Bidder Page 63 of
Ahmedabad Municipal Corporation
600mm x 600mm x 1000mm Depth
For detailed specification refer clause No. 24.44.1 of R & B Department booklet for General Technical
Specification for building works.
Extra Depth of Catch pit size 600mm x 600mm for every additional depth of 100 mm or Part
thereof beyond 1000mm depth upto 1500 mm depth
For detailed specification refer clause No.24.46 of R & B Department booklet for General Technical
Specification for building works.
Mode of measurement and payment
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He shall
also be responsible for the cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc. comp.. As directed by
engineer in charge.
Providing and Supplying of catchpit Jali P/F FRC catch pit jali with frame 750mm x 750mm clear opening including
transportation from making yard to road store As per RA (Without GST)
Mode of measurements and payment: The rate shall be for a unit of No.
Item No : 21 Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to avoid
accident & for smooth traffic diversion & movement including cautionary board etc. Item also includes for
making temporary sufficient nos of lighting arrangement through out the work with necessary required
arrangement. The same shall be removed after completion of work. (Only for break down work from start to
complete) (Based on Drainage SOR 2015-16)
For detailed specification refer5th revision of MORTH (2013) & also amendment shall be applicable to the
latest versions.
The M/s shall be on SMT basis.
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 64 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
E TENDER NOTICE NO. – /2026-27
Special Tender Clause For CCRS SLA
Ahmedabad Municipal Corporation has to make a special clause as per for SLA
Name of work :- Ftrzgt Jtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht MþaJJtbtk ytJlth ftbtu <ubs 70:20:10le Mfeb
nuX¤lt ftbtu <&t yLg csux vife Ftzegt rJM<thbtk sw>e sw>e vtu¤tubtk, Fzfeytubtk, atufXtbtk vÚ&h vurJkd fhJtlt ftb ctc<.
<t.22.01.2026 lt htus bu.Bgwrlrmvjfrb§hmtnucle Jefje bexekdbtk &guj aatobtk bwÆt lk.21 bwsc
su <u me.me.yth.yum.le Vhegtœlu y.Bgw.ftu.îtht cltJuj Ôntuxmyuv d{wvbtk bwfgt ctœ «tuçjubJtRÍ yum.yuj.yu.lt mbgdt¤t ctœ fhuj ftbdehe btxu,awftJJtlt &<t
ltKtkbtk&e y.Bgw.ftu.lt rl<e-rlgb bwsc vulÕxe leau bwsc fhJtbtk ytJNu.
(A) Penlty For Maintenance and SLA Purpose
CCRS within SLA time (Category & Problem wise) CCRS After SLA time (Category
& Problem wise Penlty)
Department Category Problem SLA Penalty Penalty Penalty
(Hours) (Hours) (Hours)
Engineering Water>>Engineering Water-low presure 240 240 480
Engineering Water>>Engineering Water-No Supply 240 240 480
Engineering Water>>Engineering Water-Other 72 72 144
Engineering Water>>Engineering Water-Leakage In Main 48 48 96
Engineering Water>>Engineering Water-Pollution In Supply 24 24 48
Engineering Drainage>>Engineering Drainage-Manhole Cover 24 24 48
Engineering Drainage>>Engineering Drainage-Other 48 48 96
Engineering Drainage>>Engineering Drainage-Choking Of Line 48 48 96
Engineering Drainage>>Engineering Drainage-Public Toilets and 72 72 144
Urinals-Drainage Line Hours
Blockage or Choking
Engineering Road Road-Other 48 48 96
Signature of Bidder Page 65 of
Ahmedabad Municipal Corporation
Engineering Road Road-Bhuva On Road 48 48 96
Engineering Road Road-Repair Require 72 72 144
Engineering Storm Water Road-Water logged Due To 24 24 48
Engineering Storm Water Road-Catch Pit Repairing 96 96 192
Engineering Public Building Public Building-Public 360 360 720
Toilets and Urinals- Hours
Doors,Windows,Tiles or
Engineering Footpath Road-Footpath Repairing 168 168 336
Engineering Building>>Engineering Building-Municipal Schools 168 168 336
Repairing Hours
Wvhtuf< vulÕxele mbgbgtoœt ctœ vK ftbdehe fhJtbtk l ytJu <tu vwhuvwhe ftbdehele hfb suxje vulÕxe jtdw vzNu.
(A) Penalty 10% for New Allocated Works.
(B) The Work Order under this Annual Rate Contract (ARC) Tender shall be issued only
against the approved and sanctioned estimate for the respective work.
The time limit for execution of each work shall be specified in the respective Work
Order issued under this tender.
Any penalty for delay or non-compliance shall be calculated and imposed based on the
approved sanctioned estimate amount of the respective work and shall be governed by
the relevant terms, conditions, specifications, and penalty clauses of this tender.
Seal and Signature of the Bidder Additional City Engineer (CZ)
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 66 of
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT-CENTRAL ZONE
Name of Work:- Ftrzgt Jtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht
MþaJJtbtk ytJlth ftbtu <ubs 70:20:10le Mfeb nuX¤lt ftbtu <&t yLg csux vife Ftzegt rJM<thbtk sw>e
sw>e vtu¤tubtk, Fzfeytubtk, atufXtbtk vÚ&h vurJkd fhJtlt ftb ctc<.
Sr. Rate Amount
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
1 disposing off the excavated stuff upto 50 Meter
lead.(A) Loose or soft soil Building S.O.R. 2023-24,
I.C.04001A, Iteam No. As Per NBO
2004.00 0 to 1.5 meter depth. 115.92 Cmt
Extra Rate Over Item of Excavation of Earth for
excavation of asphalt pavement / RCC of thickness
up to 0.20 meter including demolishing the asphalt
carpet, metal, soiling/cutting Reinforcement etc.comp. -
with stacking the material as directed. (Based on
Previously approved rate by C E sir )
up to 0.20 meter thickness (By Manual) SOR - (Jan.
2016) Rates for work of Drainage / SWD pipe line-4A
0.20 to 0.30 meter (By any type of Breaker Machine
b 668.00 or R.C.C. Cutter machine including cost of operator, 177.76 Smt
fuel, & transportation etc complete.) SOR - (Jan.
2016) Rates for work of Drainage / SWD pipe line-4B
0.30 meter & above (By any type of Breaker Machine
c 5344.00 or R.C.C.Cutter machine including cost of operator, 311.08 Smt
fuel, & transportation etc complete.) SOR - (Jan.
2016) Rates for work of Drainage / SWD pipe line-4C
Dismantling the following including loading, unloading
and disposal of unserviceable material for all lead or
3 as directed by Engineer-In-Charge and stacking the
serviceable material and backfilling the resulting
trenches and pits complete.
Dismantling tiled or stone floors laid in mortar
including stacking of serviceable material and
a 6680.00 disposal of unserviceable material with all lead and 47.25 Sqm
lifts. Building S.O.R. 2023-24, I.C.20005, Iteam No.
Demolition including stacking of serviceable materilas
and disposal of unserviceable materials with all lead
and lift. (i) R.C.C. work. Building S.O.R. 2023-24,
I.C.20002, Iteam No. As Per NBO
Demolition of Brick work and stone masonry including
stacking of serviceable materilas and disposal of
c 25.00 unserviceable materials with all lead and lift. (ii) In 544.95 Cmt
Cement Mortar. Building S.O.R. 2023-24, I.C.20003B,
Iteam No. As Per NBO
Conveyance of lime murrum building rubbish earth
manure or sludge & execavated rock and rubbish
4 [Lime murrum building rubbish]. Up to 5.00 Km lead
(Building SOR 2023-24 Statement No.5 Item No.
030201A1; Page no.6)
a 50.00 Lead up to 1.0 Km. lead 256.16 Cmt
Signature of Bidder Page 67 of
Lead up to 2.0 Km. lead
Lead up to 3.0 Km. lead
Lead up to 4.0 Km. lead
Lead up to 5.0 Km. lead
Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
5 tipper to site, laying in uniform layers in sub-
base/base course on well prepared surface and
compacting with vibratory roller to achieve the desired
density as per Codal Provision. (RA Approved
St.Com.Res. No.189,Dt.19/05/2022)
Production & Supply of WMM
Providing and laying cement concrete 1:4:8
(1-Cement: 4- coarses and 8-hand broken stone
aggregates 40mm nominal size) and curing
6 120.00 complete excluding cost of formwork in (A) 2653.67 Cmt
Foundation and Plinth (upto 10 ton). Building SOR
2023-24 Iteam Cod :05004A Iteam No. As Per NBO
Providing and laying in position Ready Mixed M-200
grade concrete for reinforced cement conctere work
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead
up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping
of R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering finishing
and reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to
accelerate/ retard setting of concrete, improve
workability without impairing strength and durability as
per direction of the Engineer - in - charge. Without Fly
Ash (Min cement level as per latest IS 456 shall be
maintained) Building SOR 2023-24 Iteam No. As Per
NBO 5055, Page No.
Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement
8 plaster inside in CM 1:3, finishing with cement slurry,
Brick masonary in CM 1:5 & excluding the cost of
chamber seat cover etc.completed. (Based on
Drainage SOR 2015-16; Item No.11)
0.60 X 0.45 mt. size Inside Clear, Depth from 0.00 to
0.60 X 0.75 mt. size Inside Clear, Depth from 0.00 to
Signature of Bidder Page 68 of
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.00 to
1.20 meter for pipe dia <=20 mm
Labour work for fixing interlocking blocks / any kind of
pavement on up to 50 mm thick sand bedding,
9 480.00 levelling, watering and fixing in line & level as well 69.64 Smt
cleaning the site etc. comp. as directed (AMC
Supplying and fixing Nimbhada ladi 37 to 50 mm thick
for walk-way, covering the activity of excavation,
ramming, Laying on sand bedding as per requirement
to fix the Nibhada Stone in Line & Level with cement
pointing in cement mortar 1:2 etc complete as
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks, Brick, I shape)
using black trap good quality aggragate of 20 mm
nominal size for footpath, parking areas, service
lanes and other areas as mentioned in the
drawing/instruction of engineer in charge. Cost
includes formworks using rubber mould, Rate
providing and laying paver blocks as per required
grading and specification. The paver block shall be
mechanically compacted. The work of paving
blocks shall be executed in line and level by skill
mason of flooring work only. It should be laid in such
a way that the no cutting of the paver block to be
necessary. if cutting of paver block necessary then it
should be cut by machine only and carting. The
finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall be
compacted and shall be relaid if necessary. Gravel or
such type of materials shall not be allowed for
production. Laying on 50 mm thick sand beddding.
(Footpath Tender Rate)
Supplying and fixing of 300 mm-L x 150 mm-B x
mm-H Kerb Block for Footpath in M-20 grade using
20 mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-cast
blocks, reasonably exposed finish/ formwork, mould
with well equipped with vibratory system for kerb
stones of approved design including curing, etc.
complete, including the cost of formwork etc.
complete. The rate shall also include necessary
cutting of asphalt, fixing the Kerb stones in line and
level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include
the flush pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of the kerb
stone fixed with Bituminous concrete mixed in proper
position as directed by Engineer in change to form a
portable mixture. In any case Gravel or such type of
materials shall not be allowed for production. a)
Laying on 5 cm thick Sand Bedding. SOR - (Jan. -
2016) for Central Verge / Footpath / Stone Paving
Repairing damaged M.H. and raising M.H. up to road
level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3
and fixing C.I. steps and existing MH sheet cover, -
removing the debris from MH and carting the same
as directed. (Based on Drainage SOR 2015-16) Item
Signature of Bidder Page 69 of
a 10.00 up to 0.15 mt. (@ Two Coarse)
b 100.00 up to 0.35 mt. (@ Four Coarse)
c 10.00 up to 0.65 mt. (@ Seven Coarse)
d 10.00 up to 0.90 mt. (@ Ten Coarse )
Repairing damaged I.C./Raising removing damaged
brick work and repairing by brick masonry in C.M. 1:5
and plaster in C.M. 1:3 and fixing C.I. steps and
existing chamber sheet cover, removing the debris 401.79
from chamber and carting the same as directed.
(Based on Drainage SOR 2015-16 Item No.22)
Providing F.R.C. MH seat cover incl. carting to the
15 work site etc. comp. Directed. (As per Central Store
Circular No.11/2022-23 Dt. 14.03.2023)
(SET cover and frame) F.R.C. Extra Heavy Duty
[EHD-35] Machinehole Covers & Frame - 560 mm ø
a 25.00 clear opening, The dimension of frame and cover as 2,843.0 No.
per mentioned in Amend No. to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Heavy Duty [HD-20]
Machinehole Covers & Frames - 560 mm ø clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 :2002 table
(SET cover and frame) F.R.C. Medium Duty [MD-10]
Machinehole Covers & Frames - 560 mm ø clear
c 80.00 opening, The dimension of frame and cover as per 1,996.0 No.
mentioned in Amend No. 1 to IS 12592 :2002 table 1
(SET cover and frame)
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Machinehole Covers & Frames - 560 mm ø clear
opening, The dimension of frame and cover as per
mentioned in Amend No. 1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Medium Duty [MD-10]
Chamber Covers & Frame - 600 x 450 mm clear
opening, The dimension of frame and cover as per
mentioned in Amend No. 1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Chamber Cover & Frame - 600 x 450 mm clear
opening,The dimension of frame and cover as per
mentioned in Amend No. 1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Chamber Cover & Frame - 450 x 450 mm clear
opening,The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
Providing and fixing S.W. gully trap with C.I.
grating/brick masonry chamber and water tight C.I.
cover with frame of 300 mm x 300 mm size (inside)
with standard weight. (i) Square mouth traps. (A) 100
mm x 100 mm size P type (Based on Building SOR
2023-24, Item No. 24006AA, NBO Item 24.19)
Signature of Bidder Page 70 of
Providing and supplying ISI marked only Standard
length Stoneware pipes in standard lengths of
following class and diameter including all taxes,
insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance -
to departmental stores, stacking etc. (IS - 651 / 1989)
(Based on GWSSB SOR 2022-23, Item No. 11.0 P-
a 300.00 100 mm dia Rmt
b 80.00 150 mm dia Rmt
c 11.00 200 mm dia Rmt
d 50.00 230 mm dia Rmt
Lowering, laying and jointing Stone Ware pipes of
following diameters with cement joints in C. M. 1:1
proportion in proper position, grade and alignment at
18 all level as directed by Engineer-in-charge including
conveyance from stores to site of work, Jointing
material etc. comp. (Based on GWSSB SOR 2022-
23, Item No. 12; Page-40)
a 300.00 100 mm dia Rmt
b 80.00 150 mm dia Rmt
c 11.00 200 mm dia Rmt
d 50.00 230 mm dia Rmt
Constructing Bombay Pattern Type Catch Pit of size
0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
19 50.00 prop. of CM (1:6) with 40 mm thick IPS flooring in the 3,110.8 No
prop M15 at bottom and 15 mm thick cement plaster
inside the catch pit in the proportion of CM (1:3) with
out jali etc. comp. as directed. (AMC SOR)
CatchPit Jali Fixing P/F FRC catch pit jali with
20 50.00 frame 600mm x 600mm clear opening etc. comp.. As 1377.64 No
directed by engineer in charge. (R.A.)
Barricading the entire break down or excavated area
on rental basis using wooden ballies / M.S.angles at
max. 2.00 meter centre to centre, C.G.I. Sheet,
reflective paint / Board out side to avoid accident & for
smooth traffic diversion & movement including
cautionary board etc. Item also includes for making
temporary sufficient nos of lighting arrangement 80.36
through out the work with necessary required
arrangement. The same shall be removed after
completion of work. (Only for break down work from
start to complete) (Based on Drainage SOR 2015-16)
Signature of Bidder Page 71 of
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 72 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER NO.235.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .