Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 CrAccepted-AOC RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹20.2 Cr Quoted ₹20.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹20.9 CrRejected-AOC PLOT NO B 1 INFOCITY SECTOR 34 GURGAON HARYANA 122004 | GURUGRAM | HARYANA | 122004 | ₹20.9 Cr | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹17.8 Cr
EMD Value
₹17.8 L
Closing Date
18 Jun 2020, 3:00 pmClosed
Senior Manager(IA)
HSIIDC OFFICE INDUSTRIAL ESTATE RAI
Up-gradation of existing 5 MLD capacity Common Effluent Treatment Plant (CETP) to 10 MLD capacity based on Primary, Physico-chemical, Biological (Extended ASP with BNR) including tertiary treatment and allied works on turnkey basis and trial run for
2020_HBC_119641_1
HSIIDC/RAI/44
Open Tender
Civil Works - Others
450 days
Industrial Estate Rai
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
HSIIDC
₹17.8 L
HSIIDC RAI OFFICE
2 Apr 2021
22 Feb 2020
22 Jun 2020
22 Feb 2020
18 Jun 2020
22 Feb 2020
26 Feb 2020
Amount
Capital cost for up-gradation of 5 MLD to 10 MLD capacity complete in all respect
Up-gradation of existing 5 MLD capacity Common Effluent Treatment Plant (CETP) to 10 MLD capacity based on Primary, Physico-chemical, Biological (Extended ASP with BNR) including tertiary treatment and allied works on turnkey basis & trial run for 3 months at Industrial Area, Rai, Sonipat complete in all respect a per scope of work given in bid document.
Description of Work / Item(s)
Amount
Proposed Operation & maintenance of 10 MLD CETP
Rate for complete process of treatment (operation & Maintenance for 5 years) and contingent works there to as defined in the scope of work in the bid documents per KL.
Description of Work / Item(s)
Amount
O&M of existing 5 MLD CETP during construction Phase
Rate per KL for complete process of treatment (operation & Maintenance) and contingent works thereto for Operation & maintenance of the existing CETP of 5 MLD, during Construction period
Subhash Infraengineers Pvt. Ltd.
Subhash Infraengineers Pvt. Ltd.
Subhash Infraengineers Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid