Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
13 Jul 2026, 11:00 am
Ashvini Rai
NHAI HQ
IE Services for Const of new 2lane with paved shoulder coastal Highway from Konark to Paradeep Km.79.400 to Km. 160.180 on Hybrid Annuity Mode in the state of Odisha PKG II
2026_NHAI_279699_1
ORDIV-22011 /3/2026-Odisha Division e-File no.317639
Open Tender
Consultancy
1460 days
NHAI HQ
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
NHAI HQ
₹10 L
4 Jun 2026
4 Jun 2026
14 Jul 2026
4 Jun 2026
13 Jul 2026
4 Jun 2026
APPENDIX C : FINANCIAL PROPOSAL SUBMISSION FORM
FROM : (Name of Firm) To : National Highways Authority of India G-5 & 6, Sector-10, Dwarka New Delhi (India) - 110 075
Subject : Independent Engineer Services for Construction of new 2-lane with paved shoulder coastal Highway from Konark to Paradeep (Km.79.400 to Km. 160.180) on Hybrid Annuity Mode in the state of Odisha (Package-II)
We, the undersigned, offer to provide the consulting services for the above in accordance with your
Request for Proposal dated [Date], and our proposal. Our attached financial proposal is for the sum of
[Amount in words and figures] This amount is exclusive of the local
taxes which we have estimated at (Amount in Words and Figures).
The percentage of overhead charges shall be (Amount in Words and Figures).
Our financial proposal shall be binding upon us up to the expiration of the validity period
of the proposal, i.e., [Date].
We undertake that, in competing for (and, if the award is made to us, in executing) the above contract, we will strictly observe the laws against fraud and corruption in force in India namely “Prevention of Corruption Act 1988”.
Commission and gratuities, if any, paid or to be paid by us to agents relating to this proposal and contract execution, if we are awarded the contract, are listed below:
Name and Address of Agents Amount and Currency Purpose of Commission or Gratuity
We understand you are not bound to accept any proposal you receive.
We remain, Yours sincerely, Managing Director/Head of the firm/Authorised Representative of the firm* Name of the firm
*Lead Member in case of JV
(To Be quoted by bidder)
RFP Document No. RFP No./ ORDIV-22011/3/2026-Odisha Division, Tender Title: Independent Engineer Services for Construction of new 2-lane with paved shoulder coastal Highway from Konark to Paradeep (Km.79.400 to Km. 160.180) on Hybrid Annuity Mode in the state of Odisha (Package-II)
Consultant’s Name
S. No. Description Amount (INR)
I Remuneration for Local Professional Staff
II Supporting Staff
III Transportation
IV Duty Travel to Site
VI Office Supplies, Utilities and Communication
VII Office Furniture and Equipment
VIII Reports and Document Printing
IX Road Survey Equipment
Subtotal (I to IX)
X Contingencies
XI %Overhead of the firm on S.No. I to IX above. (The % overhead cannot be quote@ less than 10%. If remuneration quote @ less than 10%, the financial proposal will be non-responsive and will not be considered for further evaluation.
Goods and Services Tax Payable in India
Total Cost (Including Tax)
Note: Payments will be made as per stipulations of the Conditions of Contract.
Annexure of APPENDIX C-1 : BREAKDOWN OF LOCAL CURRENCY COSTS
(To be quoted by the bidder )
I. REMUNERATION FOR LOCAL PROFESSIONAL STAFF
S. No. Position Name 48 Months(Construction Period of 30 months + Development and O&M period of 18 months)
Rate (INR) No. of man-months* Amount (INR)
A. Key Personnel
1 Team Leader cum Senior Highway Engineer TBN 48
2 Resident cum Highway Engineer TBN 72
3 Bridge/Structural Engineer TBN 34
4 Senior Pavement Specialist TBN 10
5 Senior Quality cum Material Expert TBN 30
6 Planning Engineer TBN 8
7 Road Safety Expert TBN 15
B. Sub-professional Staff
1 Survey Engineer 93
Assistant Highway Engineer 108
Environmental Engineer 7
Assistant Bridge Engineer 78
Assistant Quality cum Material Engineer 90
Electrical Engineer 7
Quantity Surveyor 32
Horticulture cum Landscaping Expert 19
Lab technician 120
11 HTMS/Toll Expert 3
12 Document/ Data entry Operator 30
II. Support Staff
S. No. Position Name Staff months Billing Rate (INR) Amount (INR)
1 Office Manager 48
2 Accountant cum Cashier 48
3 Steno cum Computer Operator 48
4 Office Boy (1 No.) 48
III. Transportation (Fixed rate on rental basis) The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 4000km/month run
S. No. Description of Vehicles Qty. (No. of vehicle-month) Total Rate / Vehicle - Month Amount (INR)
During Construction Period During Development and O&M Period
1 1 Innova or equivalent 4000 km/month (not more than 3 years old) 30 18
2 2 Balero or equivalent 4000 km/month (not more than 3 years old) (2 Nos during construction and 1 No during Development and O&M period ) 60 18
3 1 Pick up Van 4000 km/month (not more than 3 years old) 30 18
IV Duty Travel to Site (Fixed Costs) (For all Lengths of projects) : Professional and Sub-Professional Staff
Trips Number of Trips Rate* (INR) Amount (INR)
Site to NHAI HQ for Key Professionals (Round Trips by by Air-Economy class /train first AC/Deluxe-AC Bus) 20
Site to Regional Office for Key Profesionals (Round Trips by Air Economy Class/Train First AC/Deluxe AC Bus)) 20
* Rate quoted includes Hotel charges, travel cost etc. complete.
V. Office Rent (Fixed Costs)– Minimum 200 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.
Nos. of Months Rate/month Amount (INR)
VI. Office Supplies, Utilities and Communication (Fixed Costs)
S. No. Item Months Monthly Rate Amount (INR)
1 Office Supplies 48
2 Drafting Supplies 48
3 Computer Running Costs 48
4 Domestic and International Communication 48
VII. Office Furniture and Equipment (Rental) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Nos. of Months Rate/month Amount (INR)
VIII. Report and Document Printing
S. No. Description No of Reports No of Copies per Report Total Nos. of copies Rate per copy (In Rs) Amount (INR)
1 Monthly reports (Design and Construction) 48 3
2 Half yearly Report 8 3
3 Various others reports as provided in the Contract Agreement such as Completion Report Lump sum
IX. Road Survey Equipment
The cost shall include carrying out survey using equipment, manpower, software and report processing
Item km Rate per km (INR) No. of times survey to be conducted Amount (INR)
Surface defects detection and roughness measurement using Network Survey Vehicle 80.78 8
Pavement strength measurement using FWD 80.78 4
Bridge inspection using Mobile Bridge Inspection Unit 80.78 8
Road signs inspection using Retro Reflectometer 80.78 8
X Contingencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval form the Competent Authority in NHAI.
Contingencies (INR) Amount (INR)
XI. Overhead in % of total cost
Note: - The % overhead cannot be quote@ less than 10%. If remuneration quote @ less than 10%, the financial proposal will be non-responsive and will not be considered for further evaluation.
The consultant shall quote a fixed percentage of overhead, which may include overhead charges over the salary of key personnel, sub professional staff and other parts of financial proposal except contingencies, cost of the coordinator/ other support staff and profits.
Amount of performance Security Quoted by Bidder (To be quoted by Bidder)
RFP No./ ORDIV-22011/2/2026-Odisha Division, Tender Title: Independent Engineer Services for Construction of new 4-lane Access Controlled Coastal Highway from Rameshwar to Konark (km.0 to km. 79.400) on Hybrid Annuity Mode in the State of Odisha (Package-I).
Contract No Date
Consultant’s Name
Amount of Performance security to be submitted by bidder Rs (in figure) ( Minimum amount to be 5% of the financial quote)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
NIT.pdf
Tender Documents • 0.53 MB
COASTAL Package-2 IE RFP.pdf
Tender Documents • 4.92 MB
Financial Sheet PKG-2.xls
Tender Documents • 0.18 MB
Download all tender documents and submit your bid