Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.6 L
EMD Value
₹4,600
Closing Date
21 Oct 2026, 5:30 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE OFFICE - CHITOOR
Chitoor
Maintaining of Roads under Package No.1 in (R&B) Section-III, Kuppam for the year 2026-27 in Chittoor District(3rd Call)
1003072
NIT No.87/EE (R&B) CTR /TO/2026-27, Dated: 06.10.2026.
OPEN - NCB
Road Work
CHITTOOR, ANDHRA PRADESH
9 documents required · 9 mandatory
₹162
₹4,600
13 Oct 2026
13 Oct 2026
13 Oct 2026
Providing B.T. patch work for pot holes of depth ranging from 50 to 70 mm, using 40 to 45mm IRC HBG metal with required quantity of 9.50-11.20mm size IRC HBG key chips and 42 Kgs of 80/100 grade bitumen per one cum of work for filling the pot holes including removal of loose material in the pot holes trimming the edges to provide firm vertical faces cleaning applying tack coat filling the pot holes compacting with 8-10T power road roller to achieve the desired compaction and finishing including sand flushing cost and conveyance of coarse aggregate to site of work including cost and conveyance of 80/100 grade bitumen (Including wastage) to work site and all operational charges of all T&P cost of diversion traffic, providing caution boards etc., complete as directed by the departmental officers in the following reaches as per MoRT&H Specification 3004
Providing B.T. patch work for pot holes of depth ranging from 25 to 35 mm using 19-22mm IRC HBG machine crushed metal with required quantity of 9.50-11.20mm size IRC HBG key chips and 80/100 grade bitumen at 72 Kgs / 1 cum of work for filling the pot holes including removal of loose material in the pot holes, trimming the edges to provide form vertical faces, cleaning, applying tack coat, filling the pot holes compacting with 8-10T power road roller to achieve the desired compaction and finishing including sand flusing cost and conveyance of coarse aggregate to site of work including cost and conveyance of 80/100 grade bitumen (Including wastage) to work site and all operational charges of all T&P cost of diversion traffic, providing caution boards etc., complete as directed by the departmental officers in the following reaches as per MoRT&H Specification 3004
Berms sectioning in loamy and clayee soils like BC soils Red earth and ordinary gravel with an initial lead of 10 mtrs and lift of 2 mtrs and cutting high berms (or) filling of low berms including cost of labour charges for breaking clods neat sectioning ramming with Iron rammer etc., complete and as directed during execution of work
Clearing heavy jungle from the road side including all labour charges for removing cutting and burning in to ashes etc., complete as directed by the departmental officers during execution of work
Making up loss of materials /irregularities on shouldes to the design level by adding fresh approved soil and Compacting ith appropriate equipment as per MORT & H Specification No. 3003
Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., complete for finished item of work as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
87.xlsx
TENDER_DOCUMENT • 0.03 MB
DTS...doc
TENDER_DOCUMENT • 1.02 MB
YELLO SHEET-87.xlsx
TENDER_DOCUMENT • 0.02 MB
~$131.xlsx
TENDER_DOCUMENT • 0.00 MB
~$134.xlsx
TENDER_DOCUMENT • 0.00 MB
~$21.xlsx
TENDER_DOCUMENT • 0.00 MB
~$YELLO SHEET-134.xlsx
TENDER_DOCUMENT • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .