Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹73,250Accepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹73,360+₹110 (0.15%)Accepted-Finance | 2 | Accepted-Finance L2 | |
| 3 | 3₹74,884+₹1,634 (2.23%)Accepted-Finance | 3 | Accepted-Finance L3 |
Tender Value
₹86,170
Closing Date
20 Dec 2021, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
THE EXECUTIVE ENGINEER MECHANICAL DIVISION DEWAN BAGH BARAMULLA
General Overhauling of Engine of DRR No. 654 Wilson make of Field Sub-Division Pattan.
2021_PWDJK_152544_3
MDB/TS/e-TENDER/2021-22/166
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
7 days
Baramulla
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
EXECUTIVE ENGINEER MECHANICAL DIVISION BARAMULLA
Exempted
24 Dec 2021
10 Dec 2021
21 Dec 2021
10 Dec 2021
20 Dec 2021
10 Dec 2021
180 days
Amount
Dismantling of engine assembly from the Roller with the help of chain pulley block/ lifting mechanism and skilled labour. The job shall include dismantling of engine head, cylinders and other allied accessories from engine block and engine assembly. The job shall also include refitting of engine assembly with allied accessories on the Roller.
Providing and fitting of Piston with circlip and gudgeon pin (std) (63S30012)
Providing and fitting of Piston ring set (S4) (99S2066)
Providing and fitting of Cylinder liner (53DE0005)
Providing and fitting of valve inlet (31431681)
Providing and Fitting of valve exhaust (31431011)
Providing and fitting of Guide valve inlet/exhaust (3361727)
Providing and Fitting of Main Bearing crankshaft (S4009918)
Providing and fitting of Big End Bearing (31131173)
Providing and fitting of Thrust Washer (S4009933)
Providing and fitting of Connecting rod bush (31134151)
Providing and fitting of 08 No Connecting rod bolts (95250)
Providing and fitting of 08 No Head Stud long/short (32524148)
Providing and fitting of Fuel Injector Pipes (S4009909-12)
Providing and fitting of Gasket (S4004920)
Providing and fitting of Housing Rear end oil seal (37424611)
Providing and fitting of Seal crank shaft rear end (2418F375)
Providing and fitting of Timing case oil seal (2415344)
Providing and fitting of 20 No Banjo bolt with washer (S4000901)
Providing and fitting of 02 No Valve Grinding Stick
Providing and fitting of Water Pump Assy (S4009930)
Providing of Emery Paste
Providing of Emery Sheet
Providing and fitting of Shellac Tube
Providing and fitting of Pump coupling Assy
Providing and fitting of 06 No Bolt (B-1-010)
Providing and fitting of 06 No Bolt (B-1-011)
Providing and fitting of 12 No Bolt (B-1003)
Providing and fitting of 12 No Nut (N-4-012)
Providing and fitting of Flange Splined (306-15-3)
Providing and fitting of Coupling Shaft (306-15-4)
Providing of Araldite Tube
Providing and fitting of 08 No Engine Foundation Bolts
Machining and Finishing of cylinder block by way removing the old cylinder liners and reboring on reboring machine for reducing the ovality and taper from top to bottom of the cylinders and after reboring to the requiredd cylinder size and wall finishing by means of honing, the new cylinders liners are inserted through gradual uniform force by means of arbor press, reinstalling the piston connecting rod assemblies. The job also includes insertion of valve seats and refacing of valves by way of grinding on various grades of sand paper and alignment of crankshaft, Journal and crankpin and fitting of main big end bearings.
Dismantling of fuel pump of the vehicle and complete general overhauling and refitting of the same after overhauling on the vehicle. The job includes dismantling the timing cover, head cover and engine foundation bolts and arms. After rearranging the timing gear at proper firing position and adjusting the tappet clearance, refitting the covers and foundation arm and bolts.
M/S MEHRAJ AUTOMOBILES
IMPERIAL MOTORS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .