Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.2 L+₹5,061.84 (1.58%)Accepted-AOC | L2 | Accepted-AOC L2 |
| Sl No | Description | Qty | Unit | ANAS NAINA A L1 | MOHAMMED KUNJU NAINA L2 |
|---|---|---|---|---|---|
| 1.00Compound wall | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 12.75 | cum | 335 ₹4,271.25 Lowest | 345.33 ₹4,402.96 |
| 1.00 | OD127625/2025-2026::DRY RUBBLE MASONRY-Dry Rubble without concrete levelling course masonry with good quality blasted ruble including packing to compactness to lines and levels,cost and convayance of all materials labour charges etc complete as approved drawing and relevant technical
specification. | 12.75 | cum | 3,740 ₹47,685 Lowest | 3,833.72 ₹48,879.93 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 2.67 | cum | 9,850 ₹26,319.2 Lowest | 10,069.22 ₹26,904.96 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 10.2 | sqm | 360 ₹3,672 Lowest | 370.71 ₹3,781.24 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 204 | kilogram | 105 ₹21,420 Lowest | 107.93 ₹22,017.72 |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 0.61 | cum | 6,425 ₹3,906.4 Lowest | 6,557.89 ₹3,987.2 |
| 1.01 | 50.6.3.1:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x10cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth for 10 cm thick wall in CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding etc complete | 8.18 | cum | 7,230 ₹59,105.25 Lowest | 7,394.06 ₹60,446.44 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 310.15 | sqm | 355 ₹1,10,105.03 | 354.97 ₹1,10,095.72 Lowest |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 310.15 | sqm | 76 ₹23,571.78 Lowest | 77.62 ₹24,074.23 |
Tender Value
₹3.4 L
EMD Value
₹8,454
Closing Date
7 Aug 2025, 1:00 pmClosed
The Assistant Engineer
The Assistant Engineer, LSGD Section, Mannancherry Grama Panchayat
Annual Plan-Mannancherry GP-2025-26-Pr No-342/26- Construction of Compound wall and stair in Mannancherry Sub center in ward no -14-Pr No -342/26-General Civil Work
2025_LSGD_776032_2
CELSGD/TR/86274/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Mannancherry Grama Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹750
Yes
₹8,454
Yes
13 Nov 2025
30 Jul 2025
9 Aug 2025
30 Jul 2025
7 Aug 2025
30 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .