Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹154.6 Cr
EMD Value
₹78.8 L
Closing Date
23 May 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Yes (up to 2 members)
No
Two Packet System
Two Stage Reverse Auction
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
01
19 conditions · 8 needing a document upload
1.2 Financial Eligibility Criterion: The tenderer must have minimum average annual contractual turnover of 'V/N' or 'V' whichever is less; where V=Advertised value of the tender in Crores of Rupees. N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderer shall submit requisite information as per Annexure-IV, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Financial Eligibility Criteria (For Joint Venture Firm): The JV shall satisfy the requirement of "Financial Eligibility" mentioned at para-1.2 above. The "financial capacity" of the lead member of JV shall not be less than 51% of the financial eligibility criteria mentioned at para-1.2 above. The arithmetic sum of individual "financial capacity" of all the members shall be taken as JV's "financial capacity" to satisfy this requirement. Note:- Contractual payment received by a Member in an earlier JV shall be reckoned only to the extent of the concerned member's share in that JV for the purpose of satisfying compliance of the above mentioned financial eligibility criteria in the tender under consideration.
1.3.Bid Capacity: For tenders having advertised value more than Rs.20 Crore wherein eligibility criteria includes bid capacity also, the tenderer will be qualified only if its available bid capacity is equal to or more than the total value of the present tender. The available bid capacity shall be calculated as under:- Available Bid Capacity = [A x N x 2] (-)0.33 x N x B Where- A = Maximum value of construction works executed and payment received in any one of the previous three financial years or the current financial year (up to date of inviting tender), taking into account the completed as well as works in progress. N = Number of years prescribed for completion of work for which bids has been invited. B = Existing commitments and balance amount of ongoing works with tenderer as per the prescribed proforma of Railway for statement of all works in progress and also the works which are awarded to tenderer but yet not started upto the date of inviting of tender. NOTE:- (a)The Tenderer (s) shall furnish the details as per Annexure VI of tender document:- (i)Maximum value of construction works executed and payment received in any one of the previous three financial years or the current financial year (up to date of inviting tender) for calculating A and. (ii)Existing commitments and balance amount of ongoing works with tenderer as per the prescribed proforma of Railway for statement of all works in progress and also the works which are awarded to tenderer but yet not started up to the date of inviting of tender for calculating B. In case of no works in hand, a 'NIL' statement should be furnished. The submitted details for (i) and (ii) above should be duly verified by Chartered Accountant. Bid Capacity for Joint Venture Firm:- The JV shall satisfy the requirement of "Bid Capacity" requirement mentioned at para-1.3 of NIT. The arithmetic sum of individual "Bid capacity" of all the members shall be taken as JV's "Bid capacity" to satisfy this requirement. (b)In case if a bidder is JV, the tenderer (s) must furnish the details of (i)Maximum value of construction works executed and payment received in any one of the previous three financial years or the current financial year (up to date of inviting tender) by each member of JV for calculating 'A', and (ii)Existing commitment and balance amount of ongoing work with each member of JV either in individual capacity or as a member of other JV as per the prescribed proforma of Railway for statement of all works in progress and also the works which are awarded to each member of JV either in individual capacity or as a member of other JV but yet not started up to the date of inviting of tender for calculating 'B'. In case of no works in hand a 'NIL' statement should be furnished. The submitted details for (i) and (ii) above should be duly verified by Chartered Accountant.
(c)Value of a completed work/work in progress/work awarded but yet not started for Member in an earlier JV shall be reckoned only to the extent of the concerned member's share in that JV for the purpose of satisfying his / her compliance to the above mentioned bid capacity in the tender under consideration. (d)The arithmetic sum of individual "bid capacity" of all the members shall be taken as JV's "bid capacity". (e)In case, the tenderer/s failed to submit the above statement along with offer, their/ his offer shall be considered as incomplete and will be Rejected Summarily. (f)The available bid capacity of tenderer shall be assessed based on the details submitted by the tenderer. In case, the available bid capacity is lesser than estimated cost of work put to tender, his offer shall not be considered even if he has been found eligible in other eligibility criteria /tender requirement. NOTE:- Date of inviting tender shall be the date of publishing tender notice on IREPSwebsite.
1.4Credentials if submitted in foreign currency shall be converted into Indian currency i.e., Indian Rupee as under: The conversion rate of US Dollars into Rupees shall be the daily representative exchange rates published by the Reserve Bank of India or entity authorized by RBI to do so for the relevant date or immediately previous date for which rates have been published. Where, relevant date shall be as on the last day of month previous to the one in which tender is invited. In case of any other currency, the same shall first be converted to US Dollars as on the last day of month previous to the one in which tender is invited, and the amount so derived in US Dollars shall be converted into Rupees at the aforesaid rate. The conversion rate of such currencies shall be the daily representative exchange rates published by the International Monetary Fund for the relevant date or immediately previous date for which rates have been published.
1.1Technical Eligibility Criteria: The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender. OR Two similar works each costing not less than the amount equal to 40% of advertised value of the tender. OR One similar work costing not less than the amount equal to 60% of advertised value of the tender, Similar nature of work for the purpose of eligibility criteria under 1.1 above shall mean: (i) Execution of 25KV/2x25KV Electrification work OR (ii) Execution of 25KV/2x25KV feeder wire work OR (iii)Execution of 25KV/2x25KV OHE modification work OR (iv)Execution of 25KV/2x25KV OHE up-gradation work OR (v)Execution of 25KV/2x25KV OHE maintenance work OR (vi)Execution of 25KV/2x25KV OHE AMC work OR (vii)Execution of 25KV/2x25KV OHE rehabilitation work OR (viii)Execution of 25KV/2x25KV OHE replacement work i.e. catenary wire/contact wire/feeder wire/ATD/ cantilever assembly OR (ix) Execution of 66 KV or higher voltage overhead Transmission line work OR (x)Execution of 66 KV or higher voltage Sub-Station work. (As per Electrical/HQ Letter no. Elect/SECR/243/tender policy/4362 Dtd:22.03.2)
Note for item-1.1: (i)Substantially completed work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price Variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. (ii)Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Government Organisation, work experience certificate issued by Public Listed Company having average annual turnover of Rs.500 Crore and above in last three financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/ registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed Company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate. Offers submitted by Joint Venture are permitted. Eligibility criteria for Joint Venture Firms: Technical, financial eligibility and Bid capacity of the JV shall be adjudged based on satisfactory fulfilment of the following criteria: Technical Eligibility Criteria: The technical eligibility for the work as per para 1.1 above, shall be satisfied by either the 'JV in its own name & style' or 'Lead member of the JV'. Each other (non-lead) member(s) of JV, who is/are not satisfying the technical eligibility for the work as per para 1.1 above, shall have technical capacity of minimum 10% of the cost of work i.e., each non- lead member of JV member must have satisfactorily completed or substantially completed during the last 07 (seven) years, ending last day of month previous to the one in which tender is invited, one similar single work for a minimum of 10% of advertised value of the tender. Note:- (i). Value of a completed work done by a Member in an earlier JV shall be reckoned only to the extent of the concerned member's share in that JV for the purpose of satisfying his/her compliance to the above mentioned technical eligibility criteria in the tender under consideration.
Explanation for clause 1 including clause-1.1 to 1.4 - Eligibility Criteria: 1.Substantially completed work means an ongoing work in which payment equal to or more than 90% of the present contract value {excluding the payment made for adjustment of Price Variation (PVC), if any} has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. 2.In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials. 3. If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials. 4.In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work. 5.If a bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or Public listed company as defined in Note for item-1.1 above, the same shall be considered for the purpose of fulfillment of credentials. 6.In case a work is considered similar in nature for fulfillment of technical credentials, the overall cost including the PVC amount (if paid) of that completed work or substantially completed work, shall be considered and no separate evaluation for each component of that work shall be made to decide eligibility. 7.In case of newly formed partnership firm, the credentials of individual partners from previous propriety firm(s) or dissolved previous partnership firm(s) or split previous partnership firm(s), shall be considered only to the extent of their share in previous entity on the date of dissolution / split and their share in newly formed partnership firm. For example, a partner A had 30% share in previous entity and his share in present partnership firm is 20%. In the present tender under consideration, the credentials of partner A will be considered to the extent of 0.3*0.2*value of the work done in the previous entity. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc.
8.In case of existing partnership firm, if any one or more partners quit the partnership firm, the credentials of remaining partnership firm shall be re-worked out i.e., the quitting partner(s) shall take away his credentials to the extent of his share on the date of quitting the partnership firm (e.g. in a partnership firm of partners A, B & C having share 30%, 30% & 40% respectively and credentials of Rs.10 crore; in case partner C quits the firm, the credentials of this partnership firm shall remain as Rs.6 crore). For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc. 9.In case of existing partnership firm if any new partner(s) joins the firm, without any modification in the name and PAN/TAN No of the firm, the credentials of partnership firm shall get enhanced to the extent of credentials of newly added partner(s) on the same principles as mentioned in item-6 above. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deeds, dissolution/splitting deeds and proof of surrender of PAN No.(s) in case of dissolution of partnership firm etc. 10.Any partner in a partnership firm cannot use or claim his credentials in any other firm without leaving the partnership firm i.e., In a partnership firm of A&B partners, A or B partner cannot use credentials of partnership firm of A&B partners in any other partnership firm or propriety firm without leaving partnership firm of A&B partners. 11.In case a partner in a partnership firm is replaced due to succession as per succession law, the proportion of credentials of the previous partner will be passed on to the successor. 12.If the percentage share among partners of a partnership firm is changed, but the partners remain the same, the credentials of the firm before such modification in the share will continue to be considered for the firm as it is without any change in their value. Further, in case a partner of partnership firm retires without taking away any credentials from the firm, the credentials of partnership firm shall remain the same as it is without any change in their value. 13. In a partnership firm "AB" of A&B partners, in case A also works as propriety firm "P" or partner in some other partnership firm "AX", credentials of A in propriety firm "P" or in other partnership firm "AX" earned after the date of becoming a partner of the firm AB shall not be added in partnership firm "AB". 14.In case a tenderer is LLP, the credentials of tenderer shall be worked out on above lines similar to a partnership firm. 15.In case company 'A' is merged with company 'B', then company 'B' would get the credentials of company 'A' also.
1 condition
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Design, supply, erection, testing and commissioning for up-gradation of existing 1x25 KV Electric Traction system into 2x25 KV Electric Traction system in between Champa-Raigarh (81 RKM/324 TKM) and Champa-Gevra Road (46 RKM/92 TKM) (Total: 127 RKM/416TKM), section of Bilaspur division over SECR."
CPM-EL-2025-26-01
CPM-EL-2025-26-01
Open
Works - General
18 Months
Bilaspur, Chhattisgarh
₹0
₹78.8 L
23 May 2025
29 Apr 2025
495 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,54,55,45,890.99 | ||
| — | 6500.00 | — | — | ||
| Concrete for foundation & Plinth In Hard Soil. | — | — | — | 4,61,58,320 | |
| — | 2500.00 | — | — | ||
| Concrete for foundation & Plinth In Rocky Soil. | — | — | — | 1,83,36,400 | |
| Concrete for foundation & Plinth In other than Hard & Rocky soil | — | — | — | 21,47,08,160 | |
| — | 1500.00 | — | — | ||
| Reinforced concrete for foundation and Plinth. | — | — | — | 1,52,28,135 | |
| Soil Filling in foundation. | — | — | — | 19,60,000 | |
| — | 1795.00 | — | — | ||
| Galvanized Traction Mast Fabricated type (Supply) | — | — | — | 20,13,09,196.15 | |
| — | 795.00 | — | — | ||
| Galvanized Traction Mast Fabricated type (Erection) | — | — | — | 45,21,363.75 | |
| — | 800.00 | — | — | ||
| Galvanized Traction Mast Fabricated type (Erection on power block) | — | — | — | 90,99,600 | |
| — | 200.00 | — | — | ||
| Galvanized Traction Mast Fabricated type (Erection on night power block) | — | — | — | 28,43,626 | |
| — | 50.00 | — | — | ||
| Galvanized Traction Mast Rolled type (Supply) | — | — | — | 54,10,250 | |
| — | 5.00 | — | — | ||
| Galvanized Traction Mast Rolled type (Erection) | — | — | — | 22,650 | |
| — | 40.00 | — | — | ||
| Galvanized Traction Mast Rolled type (Erection in power block) | — | — | — | 3,62,400 | |
| — | 5.00 | — | — | ||
| Galvanized Traction Mast Rolled type (Erection in night power block) | — | — | — | 33,975 | |
| — | 2380.00 | — | — | ||
| Portal boom assembly (Supply) | — | — | — | 28,11,41,093.8 | |
| — | 20.00 | — | — | ||
| Portal boom assembly (Erection) | — | — | — | 2,50,308.4 | |
| — | 1000.00 | — | — | ||
| Portal boom assembly (Erection in power block) | — | — | — | 2,50,30,840 | |
| — | 1360.00 | — | — | ||
| Portal boom assembly (Erection in night power block) | — | — | — | 4,25,52,428 | |
| — | 180.00 | — | — | ||
| TTC structure with 10./8.0/5.5 M Boom, TTK (Supply) | — | — | — | 2,13,55,866 | |
| — | 20.00 | — | — | ||
| TTC structure with 10./8.0/5.5 M Boom, TTK (Erection) | — | — | — | 2,30,633.4 | |
| — | 100.00 | — | — | ||
| TTC structure with 10./8.0/5.5 M Boom, TTK (Erection in power block) | — | — | — | 23,06,334 | |
| — | 60.00 | — | — | ||
| TTC structure with 10./8.0/5.5 M Boom, TTK (Erection in night power block) | — | — | — | 17,29,750.2 | |
| — | 750.00 | — | — | ||
| Fabricated Small Parts of Steel including DA (Supply) | — | — | — | 9,07,39,492.5 | |
| — | 337.00 | — | — | ||
| Fabricated Small Parts of Steel including DA (Erection) | — | — | — | 36,83,093.22 | |
| — | 328.00 | — | — | ||
| Fabricated Small Parts of Steel including DA (Erection in power block) | — | — | — | 71,69,460.08 | |
| — | 85.00 | — | — | ||
| Fabricated Small Parts of Steel including DA (Erection in night power block) | — | — | — | 23,22,424.4 | |
| — | 50.00 | — | — | ||
| Fabricated Small Parts of Steel including DA (Supply of Fasteners) | — | — | — | 54,47,434.5 | |
| — | 800.00 | — | — | ||
| Single Bracket assembly for conventional OHE (Without Insulator) (Supply) | — | — | — | 1,35,77,304 | |
| — | 800.00 | — | — | ||
| Single Bracket assembly for conventional OHE (Without Insulator) (Fabrication and erection) | — | — | — | 6,60,192 | |
| — | 400.00 | — | — | ||
| Single Bracket assembly for conventional OHE (Without Insulator) (Erection in power block) | — | — | — | 6,60,192 | |
| — | 400.00 | — | — | ||
| Single Bracket assembly for conventional OHE (Without Insulator) (Erection in night power block) | — | — | — | 8,25,240 | |
| — | 40.00 | — | — | ||
| Overhead Equipment (Supply of assorted component for conventional OHE.) | — | — | — | 22,83,433.6 | |
| — | 5.00 | — | — | ||
| Overhead Equipment (Erection of overhead equipment) | — | — | — | 1,71,152.7 | |
| — | 20.00 | — | — | ||
| Overhead Equipment (Erection in power block) | — | — | — | 13,69,221.4 | |
| — | 15.00 | — | — | ||
| Overhead Equipment (Erection on night power block) | — | — | — | 12,83,645.1 | |
| — | 431.00 | — | — | ||
| 25 KV Alu. Feeder Conductor size 234 Sq mm (Single Spider) with SPS (Supply) | — | — | — | 14,77,18,914.3 | |
| — | 100.00 | — | — | ||
| 25 KV Alu. Feeder Conductor size 234 Sq mm (Single Spider) with SPS (Erection) | — | — | — | 17,75,220 | |
| — | 200.00 | — | — | ||
| 25 KV Alu. Feeder Conductor size 234 Sq mm (Single Spider) with SPS (Erection in power block) | — | — | — | 71,00,882 | |
| — | 131.00 | — | — | ||
| 25 KV Alu. Feeder Conductor size 234 Sq mm (Single Spider) with SPS (Erection in night power block) | — | — | — | 58,13,846.81 | |
| — | 1345.00 | — | — | ||
| Guy Rod assy. Including Mast Anchor/Guy Rod fittings (Supply) | — | — | — | 1,25,07,625.75 | |
| — | 500.00 | — | — | ||
| Guy Rod assy. Including Mast Anchor/Guy Rod fittings (Erection) | — | — | — | 3,70,135 | |
| — | 500.00 | — | — | ||
| Guy Rod assy. Including Mast Anchor/Guy Rod fittings (Erection in power block) | — | — | — | 7,40,275 | |
| — | 345.00 | — | — | ||
| Guy Rod assy. Including Mast Anchor/Guy Rod fittings (Erection in night power block) | — | — | — | 6,38,484.6 | |
| — | 100.00 | — | — | ||
| Regulating Equipment 3 pulley type with Counter Weight assy. Guide tube for conventional type OHE. RDSO Spec. no. TI/SPC/OHE/3PHATD/0150 with ACS -A or latest (Supply) | — | — | — | 83,42,082 | |
| — | 10.00 | — | — | ||
| Regulating Equipment 3 pulley type with Counter Weight assy. Guide tube for conventional type OHE. RDSO Spec. no. TI/SPC/OHE/3PHATD/0150 with ACS -A or latest (Erection) | — | — | — | 61,697.3 | |
| — | 80.00 | — | — | ||
| Regulating Equipment 3 pulley type with Counter Weight assy. Guide tube for conventional type OHE. RDSO Spec. no. TI/SPC/OHE/3PHATD/0150 with ACS -A or latest (Erection in power block) | — | — | — | 9,87,156.8 | |
| — | 10.00 | — | — | ||
| Regulating Equipment 3 pulley type with Counter Weight assy. Guide tube for conventional type OHE. RDSO Spec. no. TI/SPC/OHE/3PHATD/0150 with ACS -A or latest (Erection in night power block) | — | — | — | 1,54,243.2 | |
| — | 40.00 | — | — | ||
| Section Insulator assy. (for conventional OHE) W/O core insulator (Supply) | — | — | — | 17,07,775.6 | |
| — | 5.00 | — | — | ||
| Section Insulator assy. (for conventional OHE) W/O core insulator (Erection of section insulator assy.) | — | — | — | 14,560.25 | |
| — | 30.00 | — | — | ||
| Section Insulator assy. (for conventional OHE) W/O core insulator (Erection in power block) | — | — | — | 1,74,723 | |
| — | 5.00 | — | — | ||
| Section Insulator assy. (for conventional OHE) W/O core insulator (Erection in night power block) | — | — | — | 36,400.65 | |
| — | 8600.00 | — | — | ||
| Component of Solid Core Suspension insulator (Supply) | — | — | — | 1,66,78,152 | |
| — | 2000.00 | — | — | ||
| Component of Solid Core Suspension insulator (Erection) | — | — | — | 15,16,180 | |
| — | 4000.00 | — | — | ||
| Component of Solid Core Suspension insulator (Erection in power block) | — | — | — | 60,64,760 | |
| — | 2600.00 | — | — | ||
| Component of Solid Core Suspension insulator (Erection in night power block) | — | — | — | 49,27,624 | |
| — | 100.00 | — | — | ||
| Termination of Double conductor of OHE (Component) (Supply) | — | — | — | 9,19,880 | |
| — | 20.00 | — | — | ||
| Termination of Double conductor of OHE (Component) (Erection) | — | — | — | 16,125.4 | |
| — | 70.00 | — | — | ||
| Termination of Double conductor of OHE (Component) (Erection in power block) | — | — | — | 1,12,877.1 | |
| — | 10.00 | — | — | ||
| Termination of Double conductor of OHE (Component) (Erection in night power block) | — | — | — | 20,156.6 | |
| — | 670.00 | — | — | ||
| Termination of 25 KV Alu. Feeder (supply) | — | — | — | 37,90,980.6 | |
| — | 200.00 | — | — | ||
| Termination of 25 KV Alu. Feeder (Erection) | — | — | — | 1,97,496 | |
| — | 400.00 | — | — | ||
| Termination of 25 KV Alu. Feeder (Erection in power block) | — | — | — | 7,89,984 | |
| — | 70.00 | — | — | ||
| Termination of 25 KV Alu. Feeder (Erection in night power block) | — | — | — | 2,34,822 | |
| — | 40.00 | — | — | ||
| Component of Anti-creep with cadmium copper wire.(Supply) | — | — | — | 4,78,438 | |
| — | 5.00 | — | — | ||
| Component of Anti-creep with cadmium copper wire.(Erection) | — | — | — | 23,527.35 | |
| — | 25.00 | — | — | ||
| Component of Anti-creep with cadmium copper wire.(Erection in power block) | — | — | — | 2,35,273.25 | |
| — | 10.00 | — | — | ||
| Component of Anti-creep with cadmium copper wire.(Erection in night power block) | — | — | — | 1,17,636.6 | |
| — | 400.00 | — | — | ||
| Component of Solid core cut-in insulator (Supply) | — | — | — | 6,61,344 | |
| — | 50.00 | — | — | ||
| Component of Solid core cut-in insulator (Erection) | — | — | — | 35,639 | |
| — | 250.00 | — | — | ||
| Component of Solid core cut-in insulator (Erection in power block) | — | — | — | 3,56,390 | |
| — | 100.00 | — | — | ||
| Component of Solid core cut-in insulator (Erection in night power block) | — | — | — | 1,78,195 | |
| — | 5000.00 | — | — | ||
| Structure Bond (Supply) | — | — | — | 29,28,550 | |
| — | 5000.00 | — | — | ||
| Structure Bond (Erection) | — | — | — | 13,68,800 | |
| — | 500.00 | — | — | ||
| Longitudinal Bond (Supply & Erection) | — | — | — | 1,86,115 | |
| — | 2000.00 | — | — | ||
| Transverse /Special Bond (Supply & Erection) | — | — | — | 20,09,540 | |
| — | 7000.00 | — | — | ||
| Number Plate Retro -Reflective type on Mast/Structure (Supply) | — | — | — | 32,95,040 | |
| — | 7000.00 | — | — | ||
| Number Plate Retro -Reflective type on Mast/Structure (Erection) | — | — | — | 7,40,740 | |
| — | 2000.00 | — | — | ||
| Single Earth Electrode (Supply) | — | — | — | 48,43,680 | |
| — | 2000.00 | — | — | ||
| Single Earth Electrode (Erection) | — | — | — | 39,14,700 | |
| Earth leads 50 mm x 6 mm mild steel in ground & exposed (Supply) | — | — | — | 20,30,000 | |
| Earth leads 50 mm x 6 mm mild steel in ground & exposed (Erection) | — | — | — | 6,80,000 | |
| — | 800.00 | — | — | ||
| Stay arm insulator porcelain (Supply) | — | — | — | 26,24,568 | |
| — | 800.00 | — | — | ||
| Bracket insulator porcelain (Supply) | — | — | — | 25,90,832 | |
| — | 40.00 | — | — | ||
| Core insulator porcelain for Section insulator (Supply) | — | — | — | 2,84,632 | |
| — | 3000.00 | — | — | ||
| 9-Ton/cut in porcelain Insulator (Supply) | — | — | — | 1,49,90,850 | |
| — | 3000.00 | — | — | ||
| 9-Ton/cut in porcelain Insulator (Erection) | — | — | — | 21,89,010 | |
| — | 3000.00 | — | — | ||
| 9-Ton/cut in porcelain Insulator (Erection in power block) | — | — | — | 43,77,990 | |
| — | 1000.00 | — | — | ||
| 9-Ton/cut in porcelain Insulator (Erection in night power block) | — | — | — | 18,24,170 | |
| — | 500.00 | — | — | ||
| 25 kv Post insulator (Supply) | — | — | — | 32,76,490 | |
| — | 800.00 | — | — | ||
| Component of 25 kv Post insulator (Supply) | — | — | — | 5,07,688 | |
| — | 50.00 | — | — | ||
| Component of 25 kv Post insulator (Erection) | — | — | — | 23,516 | |
| — | 600.00 | — | — | ||
| Component of 25 kv Post insulator (Erection in power block) | — | — | — | 5,64,378 | |
| — | 150.00 | — | — | ||
| Component of 25 kv Post insulator (Erection in night power block) | — | — | — | 1,76,368.5 | |
| — | 4000.00 | — | — | ||
| Large Span wire (130sqmm) (Supply) | — | — | — | 40,80,080 | |
| — | 500.00 | — | — | ||
| Large Span wire (130sqmm) (Erection) | — | — | — | 24,440 | |
| — | 2500.00 | — | — | ||
| Large Span wire (130sqmm) (Erection in power block) | — | — | — | 2,44,400 | |
| — | 1000.00 | — | — | ||
| Large Span wire (130sqmm) (Erection in night power block) | — | — | — | 1,60,350 | |
| — | 8000.00 | — | — | ||
| Dropper wire (5mm) | — | — | — | 12,07,520 | |
| — | 500.00 | — | — | ||
| Annealed copper Large jumper wire(105 Sqmm)19/7/1.016mm | — | — | — | 4,43,400 | |
| — | 500.00 | — | — | ||
| Annealed copper Small jumper wire (50 sqmm 19/1.8 mm) | — | — | — | 2,05,320 | |
| — | 150.00 | — | — | ||
| Components of Copper jumper (C Jumper & Anti Theft) ( Supply) | — | — | — | 4,20,105 | |
| — | 20.00 | — | — | ||
| Components of Copper jumper (C Jumper & Anti Theft) (Erection) | — | — | — | 2,986.6 | |
| — | 100.00 | — | — | ||
| Components of Copper jumper (C Jumper & Anti Theft) (Erection in power block) | — | — | — | 29,865 | |
| — | 30.00 | — | — | ||
| Components of Copper jumper (C Jumper & Anti Theft) (Erection in night power block) | — | — | — | 11,199.3 | |
| — | 400.00 | — | — | ||
| Connectors & Terminals (Supply) | — | — | — | 18,26,652 | |
| — | 50.00 | — | — | ||
| Connectors & Terminals (Erection) | — | — | — | 23,390 | |
| — | 250.00 | — | — | ||
| Connectors & Terminals (Erection in power block) | — | — | — | 2,33,900 | |
| — | 100.00 | — | — | ||
| Connectors & Terminals (Erection on night power block) | — | — | — | 1,16,950 | |
| — | 800.00 | — | — | ||
| Solid copper bus bar 18 mm (Supply) | — | — | — | 13,61,264 | |
| — | 50.00 | — | — | ||
| Solid copper bus bar 18 mm (Erection) | — | — | — | 6,527 | |
| — | 600.00 | — | — | ||
| Solid copper bus bar 18 mm (Erection in power block) | — | — | — | 1,56,654 | |
| — | 150.00 | — | — | ||
| Solid copper bus bar 18 mm (Erection in night power block) | — | — | — | 48,954 | |
| — | 800.00 | — | — | ||
| Solid copper bus bar connector (Bus terminal) (Supply) | — | — | — | 28,96,984 | |
| — | 50.00 | — | — | ||
| Solid copper bus bar connector (Bus terminal) (Erection) | — | — | — | 2,219 | |
| — | 600.00 | — | — | ||
| Solid copper bus bar connector (Bus terminal) (Erection in power block) | — | — | — | 53,256 | |
| — | 150.00 | — | — | ||
| Solid copper bus bar connector (Bus terminal) (Erection in night power block) | — | — | — | 16,642.5 | |
| — | 800.00 | — | — | ||
| Solid copper bus bar splice (Bus splice) (Supply) | — | — | — | 30,54,896 | |
| — | 50.00 | — | — | ||
| Solid copper bus bar splice (Bus splice) (Erection) | — | — | — | 2,219 | |
| — | 600.00 | — | — | ||
| Solid copper bus bar splice (Bus splice) (Erection in power block) | — | — | — | 53,256 | |
| — | 150.00 | — | — | ||
| Solid copper bus bar splice (Bus splice) (Erection in night power block) | — | — | — | 16,642.5 | |
| — | 6000.00 | — | — | ||
| 160 Sq mm Jumper wire Cu (Supply) | — | — | — | 2,11,89,240 | |
| — | 1000.00 | — | — | ||
| 160 Sq mm Jumper wire Cu (Erection) | — | — | — | 72,340 | |
| — | 4000.00 | — | — | ||
| 160 Sq mm Jumper wire Cu (Erection in power block) | — | — | — | 5,78,720 | |
| — | 1000.00 | — | — | ||
| 160 Sq mm Jumper wire Cu (Erection in night power block) | — | — | — | 1,80,850 | |
| — | 1000.00 | — | — | ||
| Component for 160 sq mm jumper (Cu) (Supply) | — | — | — | 48,17,690 | |
| — | 200.00 | — | — | ||
| Component for 160 sq mm jumper (Cu) (Erection) | — | — | — | 24,626 | |
| — | 700.00 | — | — | ||
| Component for 160 sq mm jumper (Cu) (Erection in power block) | — | — | — | 1,72,382 | |
| — | 100.00 | — | — | ||
| Component for 160 sq mm jumper (Cu) (Erection in night power block) | — | — | — | 30,782 | |
| — | 20.00 | — | — | ||
| 25 KV Single Pole isolator 1600 Amps. Including Tie Rod insulator (Supply) | — | — | — | 10,93,915.4 | |
| — | 10.00 | — | — | ||
| 25 KV Single Pole isolator 1600 Amps. Including Tie Rod insulator (Erection) | — | — | — | 32,927.6 | |
| — | 5.00 | — | — | ||
| 25 KV Single Pole isolator 1600 Amps. Including Tie Rod insulator (Erection in power block) | — | — | — | 32,927.6 | |
| — | 5.00 | — | — | ||
| 25 KV Single Pole isolator 1600 Amps. Including Tie Rod insulator (Erection in nigh power block) | — | — | — | 54,639.5 | |
| — | 120.00 | — | — | ||
| 2x25 Kv Double Pole isolator 1600 Amps with Tie rod Insulator (Supply) | — | — | — | 1,37,79,326.4 | |
| — | 20.00 | — | — | ||
| 2x25 Kv Double Pole isolator 1600 Amps with Tie rod Insulator (Erection) | — | — | — | 87,445.8 | |
| — | 80.00 | — | — | ||
| 2x25 Kv Double Pole isolator 1600 Amps with Tie rod Insulator (Erection in power block) | — | — | — | 6,99,566.4 | |
| — | 20.00 | — | — | ||
| 2x25 Kv Double Pole isolator 1600 Amps with Tie rod Insulator (Erection in night power block) | — | — | — | 2,18,614.6 | |
| — | 15.00 | — | — | ||
| Double Pole isolator with Earthing heel contact assembly 1600 Amps (supply of DP Isolator assembly) | — | — | — | 17,64,891.6 | |
| — | 15.00 | — | — | ||
| Double Pole isolator with Earthing heel contact assembly 1600 Amps (Supply of Earth Contact assy) | — | — | — | 1,40,330.7 | |
| — | 5.00 | — | — | ||
| Double Pole isolator with Earthing heel contact assembly 1600 Amps (Erection of the above) | — | — | — | 20,581.05 | |
| — | 5.00 | — | — | ||
| Double Pole isolator with Earthing heel contact assembly 1600 Amps (Erection power block) | — | — | — | 41,162.1 | |
| — | 5.00 | — | — | ||
| Double Pole isolator with Earthing heel contact assembly 1600 Amps (Erection in night power block) | — | — | — | 51,452.65 | |
| — | 431.00 | — | — | ||
| Arial Earth Conductor (AEC) with required fittings & fasteners on OHE mast/ Portals (Supply) | — | — | — | 2,68,22,185.95 | |
| — | 100.00 | — | — | ||
| Arial Earth Conductor (AEC) with required fittings & fasteners on OHE mast/ Portals (Erection) | — | — | — | 9,40,028 | |
| — | 300.00 | — | — | ||
| Arial Earth Conductor (AEC) with required fittings & fasteners on OHE mast/ Portals (Erection in power block) | — | — | — | 56,40,000 | |
| — | 24.00 | — | — | ||
| Arial Earth Conductor (AEC) with required fittings & fasteners on OHE mast/ Portals (Erection in nigh power block) | — | — | — | 5,64,000 | |
| — | 347.00 | — | — | ||
| Buried Earth Conductor (BEC) with required fittings, fasteners (Supply) | — | — | — | 1,14,59,910.96 | |
| — | 340.00 | — | — | ||
| Buried Earth Conductor (BEC) with required fittings, fasteners (Erection) | — | — | — | 57,02,395 | |
| — | 7500.00 | — | — | ||
| Supply & erection of T-connector for BEC end and lug for connection | — | — | — | 1,19,13,525 | |
| — | 40.00 | — | — | ||
| Dismantling of Existing OHE | — | — | — | 10,24,530.8 | |
| — | 20.00 | — | — | ||
| Dismantling of Existing OHE (in power block) | — | — | — | 10,24,531 | |
| — | 20.00 | — | — | ||
| Dismantling of Existing OHE (in night power block) | — | — | — | 12,80,660 | |
| — | 800.00 | — | — | ||
| Dismantling of Existing Mast/Structure upright | — | — | — | 22,38,768 | |
| — | 600.00 | — | — | ||
| Dismantling of Existing Mast/Structure upright (in power block) | — | — | — | 33,58,152 | |
| — | 200.00 | — | — | ||
| Dismantling of Existing Mast/Structure upright (in night power block) | — | — | — | 13,99,230 | |
| — | 800.00 | — | — | ||
| Dismantling of Existing cantilever | — | — | — | 5,52,216 | |
| — | 600.00 | — | — | ||
| Dismantling of Existing cantilever (in power block) | — | — | — | 8,28,330 | |
| — | 200.00 | — | — | ||
| Dismantling of Existing cantilever (in night power block) | — | — | — | 3,45,138 | |
| — | 6000.00 | — | — | ||
| Dismantling of Existing Feeder /Return conductor. | — | — | — | 1,89,900 | |
| — | 4000.00 | — | — | ||
| Dismantling of Existing Feeder /Return conductor (in power block) | — | — | — | 2,53,200 | |
| — | 2000.00 | — | — | ||
| Dismantling of Existing Feeder /Return conductor (in night power block) | — | — | — | 1,58,240 | |
| — | 30.00 | — | — | ||
| Dismantling of Existing Section insulator | — | — | — | 95,337 | |
| — | 25.00 | — | — | ||
| Dismantling of Existing Section insulator (in power block) | — | — | — | 1,58,895.25 | |
| — | 5.00 | — | — | ||
| Dismantling of Existing Section insulator (in night power block) | — | — | — | 39,723.8 | |
| — | 60.00 | — | — | ||
| Dismantling of Existing SP/DP isolator. | — | — | — | 1,40,196 | |
| — | 40.00 | — | — | ||
| Dismantling of Existing SP/DP isolator (in power block) | — | — | — | 1,86,928 | |
| — | 20.00 | — | — | ||
| Dismantling of Existing SP/DP isolator (in night power block) | — | — | — | 1,16,830 | |
| — | 100.00 | — | — | ||
| Dismantling of Existing Portal/TTC boom assembly. | — | — | — | 6,90,537 | |
| — | 80.00 | — | — | ||
| Dismantling of Existing Portal/TTC boom assembly (in power block) | — | — | — | 11,04,860 | |
| — | 20.00 | — | — | ||
| Dismantling of Existing Portal/TTC boom assembly (in night power block) | — | — | — | 3,45,268.8 | |
| — | 100.00 | — | — | ||
| Dismantling of Existing Guy rod | — | — | — | 71,689 | |
| — | 80.00 | — | — | ||
| Dismantling of Existing Guy rod (in power block) | — | — | — | 1,14,702.4 | |
| — | 20.00 | — | — | ||
| Dismantling of Existing Guy rod (in night power block) | — | — | — | 35,844.4 | |
| — | 80.00 | — | — | ||
| Dismantling of Existing Anticreep | — | — | — | 3,65,572 | |
| — | 60.00 | — | — | ||
| Dismantling of Existing Anticreep (in power block) | — | — | — | 5,48,358 | |
| — | 20.00 | — | — | ||
| Dismantling of Existing Anticreep (in night power block) | — | — | — | 2,28,482.6 | |
| — | 100.00 | — | — | ||
| Dismantling of Existing Regulating Equipment with counter weight assy. | — | — | — | 2,93,751 | |
| — | 80.00 | — | — | ||
| Dismantling of Existing Regulating Equipment with counter weight assy (in power block) | — | — | — | 4,70,000 | |
| — | 20.00 | — | — | ||
| Dismantling of Existing Regulating Equipment with counter weight assy (in night power block) | — | — | — | 1,46,875.6 | |
| — | 400.00 | — | — | ||
| Dismantling of Existing 25 Kv Post insulator. | — | — | — | 2,01,104 | |
| — | 300.00 | — | — | ||
| Dismantling of Existing 25 Kv Post insulator (in power block) | — | — | — | 3,01,659 | |
| — | 100.00 | — | — | ||
| Dismantling of Existing 25 Kv Post insulator (in night power block) | — | — | — | 1,25,691 | |
| — | 100.00 | — | — | ||
| Dismantling of Existing caution Boards. | — | — | — | 8,343 | |
| — | 80.00 | — | — | ||
| Dismantling of Existing caution Boards (in power block) | — | — | — | 13,348 | |
| — | 20.00 | — | — | ||
| Dismantling of Existing caution Boards (in night power block) | — | — | — | 4,171.2 | |
| — | 20.00 | — | — | ||
| Dismantling of Existing Small steel parts DA. | — | — | — | 1,32,719.2 | |
| — | 15.00 | — | — | ||
| Dismantling of Existing Small steel parts DA (in power block) | — | — | — | 1,99,078.8 | |
| — | 5.00 | — | — | ||
| Dismantling of Existing Small steel parts DA (in night power block) | — | — | — | 82,949.5 | |
| — | 2000.00 | — | — | ||
| Dismantling of Existing foundation etc. | — | — | — | 43,62,980 | |
| — | 423.00 | — | — | ||
| Preparation & supply of Design & Drawing for 2x25KV OHE & feeder (i) Preparation of LOP & CSD | — | — | — | 34,03,809.09 | |
| — | 423.00 | — | — | ||
| Preparation & supply of Design & Drawing for 2x25KV OHE & feeder (ii) Preparation of SED & As erected Drawing | — | — | — | 27,31,226.4 | |
| — | 45.00 | — | — | ||
| Supply & Erection of Danger Plate on LC Gate to electrified section for WB drg. No. ETI/C/0069, spec. no. ETI/OHE/33(2/73) | — | — | — | 1,14,068.7 | |
| — | 60.00 | — | — | ||
| Supply & Erection of General Caution notice for staff drg. No. RE/33/496, spec. no. ETI/OHE/33 | — | — | — | 31,485 | |
| — | 60.00 | — | — | ||
| Supply & Erection of General caution notice for entrence to Rly Stn. No. RE/33/ P-7551, spec No. ET/OHE/33 (273 | — | — | — | 35,615.4 | |
| — | 60.00 | — | — | ||
| Supply & Erection of Warning board caution live wire drg. No. ETI/OHE/P-7540, spec no. ETI/OHE/33(2/73) | — | — | — | 69,318.6 | |
| — | 60.00 | — | — | ||
| Supply & Erection of Shock Treatment chart (Laminated) | — | — | — | 2,25,127.2 | |
| — | 30.00 | — | — | ||
| Supply & Erection of Section Diagram Board | — | — | — | 4,98,942 | |
| — | 30.00 | — | — | ||
| Supply & Erection of Key Box for isolator with lock Key | — | — | — | 59,237.7 | |
| — | 30.00 | — | — | ||
| Supply & installation of First Aid Box | — | — | — | 59,070 | |
| — | 60.00 | — | — | ||
| Supply & Erection of Open/Close DJ Board, 250/500 m, raise panto/ lower panto , Memu board etc all type Boards related to Neutral section. | — | — | — | 90,820.8 | |
| — | 60.00 | — | — | ||
| Supply and Erection of Sigma Board. | — | — | — | 1,17,429.6 | |
| — | 60.00 | — | — | ||
| Supply and Erection of Power Block Board. | — | — | — | 72,774.6 | |
| — | 30.00 | — | — | ||
| Supply and Erection of Dead section caution boards (Electric engine STOP) drg. No. ETI/OHE/P-7572, specification No.ETI/OHE/33 (2/73) | — | — | — | 79,110 | |
| — | 30.00 | — | — | ||
| Supply and erection of Dead section caution boards (Caution unwire turnout) drg. No. ETI/OHE/ P-7573, spec No.ETI/OHE/ 33 (2/73) | — | — | — | 73,950 | |
| — | 50.00 | — | — | ||
| Supply & Erection of protective screens at FOB/ROB as per RDSO ETI/C/0068 | — | — | — | 12,71,350 | |
| — | 340.00 | — | — | ||
| Provision of digging of trench 300mm dip and refilling in all soil and repair of platform. | — | — | — | 1,40,70,186 | |
| — | 600.00 | — | — | ||
| Supply of HT Feeder Cable single core (1x66KV) size of 400 Sq mm to station, ROB/FOB area. | — | — | — | 45,13,920 | |
| — | 600.00 | — | — | ||
| Laying of Feeder Cable(1x66KV (E) 400 Sqm) inside precast cable trench. | — | — | — | 41,88,588 | |
| — | 60.00 | — | — | ||
| Supply and erection of Feeder Cable Termination Kit | — | — | — | 45,35,757 | |
| — | 30.00 | — | — | ||
| Supply and erection of Straight Through Jointing Kit. | — | — | — | 26,71,043.4 | |
| — | 400.00 | — | — | ||
| Transfer of Equipment from one Mast/Support to another. | — | — | — | 10,69,900 | |
| — | 300.00 | — | — | ||
| Transfer of Equipment from one Mast/Support to another. (Erection in power block) | — | — | — | 16,04,850 | |
| — | 100.00 | — | — | ||
| Transfer of Equipment from one Mast/Support to another. (Erection in night power block) | — | — | — | 6,68,688 | |
| — | 2000.00 | — | — | ||
| Adjustment of existing OHE & Tower wagon checking. (Supply) Note: Unit of item 'EACH' to be considered as 'SPAN'. | — | — | — | 13,70,940 | |
| — | 500.00 | — | — | ||
| Adjustment of existing OHE & Tower wagon checking. (Erection) Note: Unit of item 'EACH' to be considered as 'SPAN'. | — | — | — | 9,97,230 | |
| — | 1000.00 | — | — | ||
| Adjustment of existing OHE & Tower wagon checking. (Erection power block) Note: Unit of item 'EACH' to be considered as 'SPAN'. | — | — | — | 39,88,920 | |
| — | 500.00 | — | — | ||
| Adjustment of existing OHE & Tower wagon checking. (Erection on night power block). Note: Unit of item 'EACH' to be considered as 'SPAN'. | — | — | — | 24,93,075 | |
| — | 100.00 | — | — | ||
| Splicing and extension of OHE (Supply) | — | — | — | 3,33,155 | |
| — | 20.00 | — | — | ||
| Splicing and extension of OHE (Erection) | — | — | — | 67,595.6 | |
| — | 70.00 | — | — | ||
| Splicing and extension of OHE. (Erection in power block) | — | — | — | 4,73,169.9 | |
| — | 10.00 | — | — | ||
| Splicing and extension of OHE (Erection in night power block) | — | — | — | 84,494.6 | |
| — | 220.00 | — | — | ||
| Copper strip for equipment earthing (Supply) | — | — | — | 2,55,618 | |
| — | 220.00 | — | — | ||
| Copper strip for equipment earthing (Erection) | — | — | — | 23,344.2 | |
| — | 4.00 | — | — | ||
| Supply of 10 KVA 25 kV/240 V Auxiliary Transformer complete with accessories like 25 kV DO fuse assembly, anti-climbing device, jumpers and its fittings,9Tonne cut in insulators, earthing station. | — | — | — | 4,33,504 | |
| — | 12.00 | — | — | ||
| Shifting/re-erection/ erection of Auxiliary Transformer | — | — | — | 1,18,677.24 | |
| — | 12.00 | — | — | ||
| Shifting/re-erection/ erection of Auxiliary Transformer (in power block) | — | — | — | 2,37,354.48 | |
| — | 6.00 | — | — | ||
| Shifting/re-erection/ erection of Auxiliary Transformer (in night power block) | — | — | — | 1,48,346.58 | |
| — | 1000.00 | — | — | ||
| Supply and laying of HDPE pipe, dia 160mm under road/ground/ floor / railway track or as per site requirement already excavated trench | — | — | — | 4,28,000 | |
| — | 1000.00 | — | — | ||
| Excavation and laying of Cables 70/185 sq mm or any required sizes with half round RCC pipes | — | — | — | 1,82,000 | |
| — | 100.00 | — | — | ||
| Laying of cable specially for across the road/track by pipe pushing method including supply of 150 mm class 'B' GI Pipe | — | — | — | 13,01,900 | |
| — | 20.00 | — | — | ||
| PTFE Type Neutral Section. (Supply) | — | — | — | 2,19,23,180 | |
| — | 2.00 | — | — | ||
| PTFE Type Neutral Section (Erection) | — | — | — | 15,219.34 | |
| — | 13.00 | — | — | ||
| PTFE Type Neutral Section (Erection in power block) | — | — | — | 1,97,851.29 | |
| — | 5.00 | — | — | ||
| PTFE Type Neutral Section (Erection in night power block) | — | — | — | 95,120.85 | |
| — | 6.00 | — | — | ||
| Supply and erection of Light Weight Section Insulators per RDSO specification TI/SPC/OHE/LWTSI/0060 rev 1 with A & C slip 1 or latest. | — | — | — | 24,61,362 | |
| — | 20.00 | — | — | ||
| Supply of Hand Gloves of rating , Class 4 Hand Gloves with 36 kV working voltage as per IS 13774:2021 | — | — | — | 1,25,080 | |
| — | 5.00 | — | — | ||
| Supply, Installation, testing and commissioning of OHE height and stagger gauge | — | — | — | 11,27,465 | |
| — | 10.00 | — | — | ||
| Supply of Aluminium Wall Supporting Ladders, Height 30 foot | — | — | — | 1,06,520 | |
| — | 5.00 | — | — | ||
| Supply, Installation, Testing and Commissioning of Megger MIT 5255 KV DIAGNOSTIC INSULATION RESISTANCE TESTER | — | — | — | 29,71,165 | |
| — | 5.00 | — | — | ||
| 2.5KV Hand Driven Megger Scale 0-10000 Mega Ohms with accessories (Supply) | — | — | — | 33,770 | |
| — | 5.00 | — | — | ||
| Digital Earth tester for measurement of earth resistance with in built rechargeable battery 3.5 digit LCD display, testing range 0.01 ohm to2000 ohm & all accessories as four spikes, suitable length cable(10M,20M,30M,40M)on winder, battery charger, carrying bag,operating manual, hammer etc,(Supply) | — | — | — | 43,405 | |
| Transportations of major Railway supply Materials from Railway stores to work site /Released OHE mast/Portals/ttc etc of different Length by accumulating from different Location of working site and unload to GSD Raipur. (Unit MT may be treated as MT per KM). (Qty 20000 comes from 100MT x 200 KM) | — | — | — | 4,40,000 | |
| — | 20.00 | — | — | ||
| Safe Earth electrode Supply and Erection | — | — | — | 1,66,220 | |
| — | 12.00 | — | — | ||
| Supply of Earthing discharge rod complete suitable for working voltage of 25kV AC traction, fibre glass body screw type in a suitable carry bag as per RDSO specification no ETI/OHE/51(9/87) or latest and as approved by Engineer. | — | — | — | 2,06,016 | |
| — | 10.00 | — | — | ||
| Supply of Operating Rod | — | — | — | 41,910 | |
| — | 240.00 | — | — | ||
| Temporary Lighting arrangments during erection of Portals/ Structures during Night Power Block in Yards/ open routes along the Track. Hiring of 5/7.5 KVA D.G sets with Fuel and others sets(Unit in numbers may be treated as per day/nos). Qnty 240 comes from 2 nos x 120 nights i.e 240 ) as per requirements of sites to run the DG | — | — | — | 6,96,960 | |
| — | 1800.00 | — | — | ||
| Provision of 250 W MH/ LED fitting with Lampos and Stands complete (Unit in numbers maybe treated as per night/nos). Qnty 1800 comes from 15 nos x 120 days i.e 1800 ) | — | — | — | 1,18,800 | |
| — | 4800.00 | — | — | ||
| LED out door type 40Watt complte with tube/ LED fitting, stands etc including erection(Unit in numbers may be treated as per day/nos) Qnty 4800 comes from 120 nos x 40 days i.e 4800 ) | — | — | — | 1,90,080 | |
| — | 4800.00 | — | — | ||
| Provision of 36/Watt CFL/LED fitting with stands where ever requried light (Unit in numbers may be treated as per day/nos). Qnty 4800 comes from 120 nos x 40 days i.e 4800) | — | — | — | 58,080 | |
| Wiring of Lights by 4.00/2.5/1.5 sqmm wire (Unit in mtrs. may be treated as per day/Mtrs.) Qnty 80000 comes from 2000 mtrs x 40 days i.e 80000 ) | — | — | — | 2,64,000 | |
| — | 2000.00 | — | — | ||
| Trimming and cutting of tree branches above OHE including removal of trimmed / cut branches . Trnasportation to other place, tools and manpower with all safety measures required in 25 kv AC electrified area | — | — | — | 24,34,000 | |
| — | 500.00 | — | — | ||
| Retrieval of traction mast, uprights and all type structures | — | — | — | 28,60,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocument_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .