Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 CrAccepted-AOC | ₹2.5 Cr | 1 | Accepted-AOC First Lowest |
| 2 | 2₹2.5 Cr+₹9.0 L (3.65%)Rejected-AOC | ₹2.5 Cr+₹9.0 L (3.65%) | 2 | Rejected-AOC Second Lowest |
| 3 | 3₹2.6 Cr+₹13.6 L (5.54%)Rejected-AOC | ₹2.6 Cr+₹13.6 L (5.54%) | 3 | Rejected-AOC Third Lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Fourth Lowest |
| 5 | Rejected-Technical | - | - | Rejected-Technical Fifth Lowest |
Tender Value
₹2.7 Cr
EMD Value
₹1 L
Closing Date
4 Mar 2022, 4:00 pmClosed
Construction Engineer K L D C Ltd Thrissur
Office of the Construction Engineer, K L D C Ltd Thrissur Near Ramanilayam Guest House Thrissur-680020
Construction of Canals and Bunds
2022_KLDC_477387_1
KLDC/ TSR/2021-22/7(5)
Open Tender
Civil Works - Others
Item Rate
545 days
Kadukkutty Panchayath Thrissur District
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,400
Yes
₹1 L
Yes
24 May 2022
23 Feb 2022
7 Mar 2022
23 Feb 2022
4 Mar 2022
23 Feb 2022
Amount
1 Canals and Bunds
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.2.1 : EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Rejumon Varghese
ABDULKADER HAJI. D
K.P.JOY
MAHIN K.
Bidder Name
K.P.JOY
Rejumon Varghese
ABDULKADER HAJI. D
MAHIN K.
BAIJU R
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_685230.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .