| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33,829.56Admitted-Finance | -17.00% | ₹33,829.56 | L1 | Admitted-Finance |
| 2 | L2₹38,920.29+₹5,090.73 (15.0%)Admitted-Finance | -4.51% | ₹38,920.29+₹5,090.73 (15.0%) | L2 | Admitted-Finance |
Tender Value
₹21 L
EMD Value
₹42,000
Closing Date
11 Jun 2026, 6:00 pmClosed
EXECUTIVE OFFICER NAGAR PALIKA TINWARI
NAGAR PALIKA TINWARI
INSERTING SEWARAGE LINE AT VARIOUS PLACES OF MUNICIPAL AREA TINWARI
2026_DLB_563721_2
enit22533128
Open Tender
Civil Works
Percentage
EXECUTIVE OFFICER NAGAR PALIKA TINWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MDRISL JAIP/EXECUTIVE OFFICER NAGAR PALIKA TINWARI
₹42,000
Yes
18 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
11 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | |||||
| 1.01 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of
sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the
drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | - | CUM | 299 | - |
| 1.02 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Lime Concrete, cement concrete grade M-10 (1:5:10) and below | - | CUM | 393.5 | - |
| 1.03 | Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area
timbered) for following depth below NGL.Depth upto 3.0 m | - | SQM | 142.5 | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | CUM | 5,910 | - |
| 1.05 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | CUM | 4,860 | - |
| 1.06 | Filling with locally available river sand at all levels including watering ramming consolidating and dressing complete including cost of sand. | - | CUM | 1,013 | - |
| 1.07 | Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint,
(EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and
conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and
paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the
manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.315 mm Nominal Dia | - | MTR | 2,069 | - |
| 1.08 | Half brick masonry with FPS brick of class designation 75 in foundations and plinth in :cement mortar 1:4 (1 cement : 4 coarse sand) | - | SQM | 674 | - |
| 1.09 | Stone work (machine cut edges) for wall lining etc. (veneer work) backing filled with a grout of 12mm thick cement mortar 1:3 (1
cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment
matching the stone shade : (To be secured to the backing by means of cramps which shall be paid for separately) : Red sand stone - exposed face fine dressed with rough backing. 70 mm thick. | - | SQM | 2,293 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_1003502.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .