Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | L1 | Accepted-AOC FIRST | |
| 2 | L2₹18.6 L+₹3,747.90 (0.20%)Rejected-AOC THEERTHAM VADAKKUMBAD P O KANNUR 670105 | KANNUR | KANNUR | KERALA | 670105 | L2 | Rejected-AOC SECOND | |
| 3 | L3₹19.0 L+₹39,704.36 (2.14%)Rejected-Finance | L3 | Rejected-Finance 3RD | |
| 4 | L4₹22.2 L+₹3.6 L (19.4%)Rejected-Finance | L4 | Rejected-Finance 4TH |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
8 Mar 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT ENGINEER
LSGD, OLAVANNA
COMPLETION WORK OF VARIOUS PARTIALLY COMPLETED ROADS IN DIFFERENT WARDS - PART 1
2023_LSGD_562127_1
AE/OLV/7/23
Open Tender
Civil Works - Roads
Item Rate
180 days
OLAVANNA
Please refer Tender documents
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
11 May 2023
1 Mar 2023
10 Mar 2023
1 Mar 2023
8 Mar 2023
1 Mar 2023
Amount
EARTH WORK ESCAVATION FOR DR WORK
9.1.1:Excavation for Structures Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I. Ordinary soil (i) Upto 3 m depth
DR WORK
OD269602/2022-2023:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
EARTH FILLING
3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
BASE COURSE
OD269276/2022-2023:Filling with Quarry muck Filling up low laying and water logged areas with local materiel/ Quarry muck, spreading in layers, leveling the top at site and consolidation by ramming etc, complete for improving the CBR value of subgrade
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil.
ROAD CONCRETE
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
MANOJ P
ABDULLATHEEF P M
V ARUN KUMAR
Bidder Name
V ARUN KUMAR
MANOJ P
ABDULLATHEEF P M
M VINOD KUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_828361.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .