| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.5 L+₹48 (0.03%)Rejected-AOC THOTTIYIL CHITHARI RAVANESHWARAM | KERALA | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
₹1.7 L
EMD Value
₹4,210
Closing Date
11 Sept 2023, 6:00 pmClosed
SUMISHA
Office of the Assistant Engineer, LIDEW Section, Pallikkara Grama Panchayat
CONSTRUCTION OF COMPOUND WALL AT PANAYAL SUB CENTRE
2023_LSGD_599176_6
TN03/2023-24/AE/LSGD/PKGP
Open Tender
Civil Works - Buildings
Item Rate
120 days
Pallikkara Grama Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,210
Yes
31 Oct 2023
30 Aug 2023
13 Sept 2023
30 Aug 2023
11 Sept 2023
30 Aug 2023
Amount
MAINTANANCE WORK
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD55317/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with Using Departmental material including labour charges etc. complete as per direction of departmental officers at site.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
OD55319/2023-2024:Laterate masonry with neatly dressed laterate stone of size35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
SUKESH M
ABDUL RASHEED CH
Bidder Name
SUKESH M
MUHAMMED FAIZAL M
ABDUL RASHEED CH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .