Tender Value
₹38.8 L
EMD Value
₹1.2 L
Closing Date
1 Dec 2026, 6:30 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Engineer (G), UTPS
The work of online, preventive and breakdown maintenance of coal mills XRP-1003 and its associated auxiliaries of 500 MW unit No.6 of GSECL Ukai TPS. (WT-5286 BMD-6)
368655
WT-5286
Open
Miscellaneous Works
Works
Tapi
2 documents required · 2 mandatory
₹2,950
Gujarat State Electricity Corporation , Thermal Power Station,Ukai-394680
₹1.2 L
24 Nov 2026
24 Nov 2026
24 Nov 2026
1 Dec 2026
24 Nov 2026
180 days
Pre-Qualification Criteria of Technical Bid ..................................................................................
GENERAL TERMS & CONDITION OF CONTRACT ..............................................................
TERMS AND CONDITIONS REGARDING LABOUR LAWS ................................................
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
Notice Inviting Tender (NIT)
TENDER NO: - WT-5286
Sub: The work of online, preventive and breakdown maintenance of coal mills XRP-1003
and its associated auxiliaries of 500 MW unit No.6 of GSECL Ukai TPS. (BMD-6)
CE [Generation] invites “On line Tenders” (e-tendering) for the of above subject item / works.
Tender Papers & Specifications may be down loaded from Web site http://tender.nprocure.com (For
view, down load and on line submission) and GSECL web sites www.gsecl.in (For view & download
only.) Tender fee may be paid along with submission of tender in EMD cover, for respective tender. The
Technical bid containing all the relevant documents will have to be uploaded in PDF form through online
on n-procure website only.
Sr. Name, Designation & e-mail ID Mobile No. For query
1 Mr. M. A. Varia (COA) [email protected] 9925210981 Account related
2 Mr. J.K. Sandhi S.E. (M [email protected] 9909940741 Technical Specification /
& C) SOW related
3 Mr. Parimal S. Kayasth [email protected] 9687663053 Engineer in Charge of the
(Executive Engineer, subjected work
4 Mr. K. C. Chaudhari (Ex. [email protected] 9925213026 Tender related /
Engineer -P&C) downloading documents
“Technical bid containing all the relevant documents of tender (PDF form with resolution 300 dpi or
higher. The size of PDF not more than 3 MB) to be submitted through ONLINE process only on (n)
“No any documents will be accepted in offline mode or hard copy (Except EMD cover)”
Tender No. WT-5286G
Estimated Cost of the tender items. Rs.
Tender Fees Amount (Non-Refundable) By Rs.2,500.00 + 18% GST(Rs.
D.D/NEFT/RTGS 450.00)
Earnest Money Deposit Amount (Refundable) Rs. 1,16,350.00/-
Online [e-tendering] tender/offer submission last date up to As per NIT Details
18:30 hrs only [This is mandatory]
The payment of EMD [Earnest Money Deposit]
In case of payment through DD/NEFT/RTGS/Pay order/ As per NIT Details
Bank Guarantee, the scanned copy of original document
must be uploaded on (n) Procure and original copy of the
same must be submitted physically in cover. (TF & EMD
It is not mandatory to submit hard copy of EMD/tender
fee cover, in case of online payment/ NEFT/RTGS.
Date of opening of online Technical Bid, all relevant As per NIT Details
documents submitted through online process, submission of
original DD, Pay order & BG within 5 days from Online
last Bid submission date.
Tentative date of on-line opening of Technical bid/price bid. As per NIT Details or By letter
Time Limit for completion of Work 3 months
Security Deposit (Performance security e.PBG) 5% of order end cost value
Penalty for late completion As per GSECL’s rules.
Validity Period from the date of opening of Technical bid 180 Days
Tender Fee will be accepted by Demand Draft on Bank of Baroda, Ukai Branch in favor of the Gujarat
State Electricity Corporation Ltd. OR NEFT/RTGS, Earnest Money Deposit will be accepted DD/
NEFT/RTGS/ Pay order/Bank Guarantee OR by any other means accepted by our A/C section. Cheque
or FDR will not be accepted. Right to reject any or all tenders without assigning any reason there of
is reserved by the competent authority. Contractor should possess separate PF code number from
1. Bidders are requested to submit Technical & Price Bid through ONLINE (on (n) Procure)
only. Offline or hard copy of Bids will not be accepted. (Except TF & EMD cover). Further
if the quantity quoted differs in any of the Technical bid and Price bid forms, it is at the
discretion of Competent Authority of GSECL to consider the quoted quantity
2. In case of payment through DD/Pay order/ Bank Guarantee (Note: Bank Guarantee may
be applicable in case of EMD), the scanned copy of original document must be uploaded
on ((n) Procure) and original copy of the same must be submitted physically in cover as
per NIT Details.)
All such documents (Original DD, Pay Order & BG) should be strictly submitted by RPAD
/ Speed post only. Otherwise the offer will not be considered or ignored and no any further
communication in the matter will be entertained.
“NO COURIER SERVICE OR HAND DELIVERY” will be accepted.
3. The details like Tender No., EMD, Name of bidder etc. should be match on both On-line
offer (e-tendering) and submitted documents of EMD details.
4. Any deviation found in Data/Details/Documents between On-line offer (e-tendering) and
submitted documents of EMD details will not be considered and no any further
communication in the matter will be entertained.
The exemption in payment of Tender Fee & EMD shall be given to the,
a) Micro & small-scale enterprises which participate directly in tendering process for
the product which they are manufacturing / service which they are providing and
have Udyam registration for items / service under procurement.
b) Startups which participate directly in tendering process for the product which they
are manufacturing / service which they are providing and recognized by DPIIT
under the Start-up India Program and has obtained Udyam registration.
c) Organization which has registration certificate for the manufacturing product of the
tender, from Gujarat Khadi Gramodyog Board or Khadi and Village Industries
Commission (KVIC) or Commissioner of Cottage Industries.
d) Board/Corporations/PSUs of the Central/State Government for their own
manufactured items.
e) State Government recognized organizations like (i) organizations for blinds, dumb
and deaf, disabled, mentally disabled persons; (ii), women's self-help group
recognized by Gujarat Livelihood Promotion Company, which participate directly
in tendering process for the product which they are manufacturing /service which
/they are providing.
f) In keeping with GeM guidelines, OEM and service providers rendering services
directly or by its own and having annual turnover of INR 500 Crore or more.
g) In keeping with GeM guidelines, Sellers/Service Providers holding BIS license, for
the Primary Product Category whose credentials are validated through BIS
Agencies registered under Udyam in the capacity of Traders, Re-sellers, or similar
categories (i.e. other than Manufacturers/Service Providers) are not eligible for EMD
5. Bidder must have to follow the Online Payment of Tender Fee / EMD / SD etc. through
Bill Desk Payment Gateway on GSECL Payment Portal https://payment.gsecl.in
Before initiating payment, ensure the following details are in hand:
Valid Email ID (For Payment Receipt)
Debit Card / Credit Card / UPI / Net Banking / Wallet
Tender details (For amount confirmation)
6. Any technical questions, information and clarifications that may be required pertaining
to this enquiry should be referred to the CHIEF ENGINEER (GEN) , GUJARAT
STATE ELECTRICITY CORPORATION , THERMAL POWER STATION,UKAI-
394680 , DIST-TAPI.
The bank details are as under,
Beneficiary Name : M/s. Gujarat State Electricity Corporation Ltd.
Address: Urja Nagar, GEB Colony, Taluka: Songadh. Dist.: Tapi.,
Pin Code -394680.
Bank Name : Bank of Baroda Ukai,
Nature of A/C : Current Accounts. , Branch: Ukai,
IFSC CODE No. : BARB0UKAIXX (0 = ZERO)
MICR CODE No. :
Bidders should be in touch with the websites https://gem.gov.in, www.gsecl.in,
https://tender.guvnl.com for information regarding revision / corrigendum / amendment in
tender till due date of online submission and thereafter. No separate correspondence will
be done in this regard.
GSECL reserve the rights to accept/reject any or all tenders without assigning any reasons
1. Bidder can not allow to withdraw their offer after opening of technical bid if withdraw
their offer then his EMD shall be forfeited and he will not allowed to participate in the
tenders invited from the same office for the period of one year for that place from where
tender is invited.
2. If participating bidder/agency have stake in one or more other agencies/bidders who are
participating in same tender and on account of submission of wrong information /
declaration in tender/enquiry certificate-A then the bidder will be declared as
disqualified automatically and EMD/SD will be forfeited.
CHIEF ENGINEER (GEN.)
GSECL, TPS, UKAI.
(1) I/We here by agree to abide by and fulfill all the terms and provisions of the tender and
contractor for work/supply as applicable and in default thereof to forfeit and pay to the
Corporation the sums of money due.
(2) I/We hereby agreed to abide that the full value of the earnest money deposit paid herewith
should be absolutely forfeited to the Corporation if I / We would not deposit the full amount
of specified security deposit.
Seal and Signature of
Tenderer / Contractor
Following are the certifying agencies for obtaining the Digital Signature Certificates (DSC as
per category III).
Name of certifying agencies Web Site Address are as under,
1 Safescrypt www.safescrypt.com
2 TCS www.tcs-ca.tcs.co.in
3 MTNL www.mtnltrustline.com
4 (n)code Solutions (GNFC) www.nprocure.com
In Case Bidder needs any clarification or if training required for participating in on line tender,
they can contact the following office.
(n) Procure Cell,
(n)Code Solutions (A Division of GNFC Ltd.)
304, GNFC Infotower, Nr. Hotel Grand Bhagwati,
S G Highway, Bodakdev,
Gujarat, India.
Email: [email protected] , [email protected]
(n)Code Solutions (A Division of GNFC Ltd.)
14th Floor, Tower One, Road 5C, Zone
Gujarat International Finance Tech City (GIFT City) Gandhinagar - 382
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
INSTRUCTION TO BIDDERS
01. TPI clause :
All bidders shall submit the details/documents in support of Technical Qualification
Requirements duly certified and verified for authenticity from Specified Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm along with a
certificate regarding verification of authenticity of documents as per the format placed at
Appendix-1. All the documents submitted by the bidder in support of the meeting Technical
QR only shall be digitally signed by the Specified Third-Party Inspection Agency (TPIA) or
Statutory Auditor of their Company or Practicing CA/CA Firm,
The verification and certification of authenticity of documents is acceptable from any of the
following TPIAs:
1. M/s. Competent Inspectorate and Consultants Pvt. Ltd. Hyderabad, India.
2. M/s. Gulf Lloyds Industrial Service India Pvt. Ltd - Ahmedabad.
3. M/s. International Certifications Services.
4. M/s. Intertek India Pvt. Ltd.
5. M/s. India SGS Pvt. Ltd.
6. M/s. Moody International (India) Pvt. Ltd.
7. M/s. TUV SUD South Asia (P) Ltd.
8. M/s. TUV Rheinland (India) Pvt. Ltd.
9. M/s. Bureau Veritas (India) Pvt. Ltd.
10. Hertz Inspection & Services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
Bidders shall be responsible for getting their documents / credentials verified & certified by the
Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor of their Company or
Practicing CA/CA Firm in support of Technical QR. All the costs pertaining to third party
verification and certification shall be borne by the Bidder. GSECL shall have no liability
(financial or otherwise) towards the same and shall not be liable for any claim/ dispute between
the bidder and the Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor of
their Company or Practicing CA/CA Firm.
The following website may be referred for contact details of above TPIAs:
http://nabcb.qci.org.in/accreditation/reg_bod_inspection_bodies.php
Party shall have to submit following documents with TPI. Also refer attached Appendix-1 and
submit with TPI.
1. Past order copies (other than GSECL)
2. All supporting documents related to pre-qualification Requirements.
02. Stop Dealing/Blacklisting/Banning for business Dealing :
As per GSECL policy, A Firm/bidder will be placed in a Stop deal/ banned for business dealing
/ blacklist, if the Firm/bidder has carried out any of the following mischief / mal practices with
a) Has submitted fake, false or forged documents / certificates.
b) Has revised / withdrawn price bid after opening of Techno-commercial bid, until and
unless it is sought for.
c) Has tampered with the stipulated tendering procedure.
d) Has refused to accept LOI / Work Order after the same is issued by the Company within
the validity period and as per agreed terms and conditions.
e) Has committed breach of contract or has failed to perform a contract or has abandoned
f) Has failed to submit all the necessary tests reports / documents within time schedule / as
per Company’s time limit, as mentioned in the LOI/WO, if the Letter of LOI is placed
subject to submission of type reports / documents to the firm.
g) Has supplied inferior quality / defective materials and refused to replace with stipulated
time frame, as specified by the Company.
h) Has substituted materials in lieu of materials supplied by the Company or has not returned
or has short returned or has unauthorisedly disposed of materials / documents / drawings
/ tools or plants or equipment supplied by the Company.
i) Has involved in malpractices such as bribery, corruption, fraud, canvassing and Pilferage.
j) Has un-authorised obtained official company information or copies of documents, in
relation to the Tender/Contract.
k) Has failed to follow the stipulated mode of communication, if specified by the tendering
authority / purchaser.
l) Has parted with, leaked or provided confidential / proprietary information of the Company
given to the firm only for its use (in discharge of its obligations against an order) to any
third party without prior consent of the Company.
m) Any other ground for which in the opinion of the Company makes, it undesirable to deal
with the Firm, and.
n) In case the State Government directs the Company to place a firm in stop dealing / banned
for business dealing / blacklisting.
03. Conflict of Interest among Bidders/Agents :
A bidder shall not have conflict of interest with other bidders for particular quoted item. Such
conflict of interest can lead to anti-competitive practices to the detriment of Procuring Entity’s
interests. The bidder found to have a conflict of interest shall be disqualified. A bidder may be
considered to have a conflict of interest with one or more parties in this bidding process for quoted
a) They have proprietor/ partner(s)/ Director(s) in common; or
b) They receive or have received any direct or indirect subsidy/ financial stake from any of them;
c) They have the same legal representative/agent for purposes of this bid; or
d) They have relationship with each other, directly or through common third parties, that puts
them in a position to have access to information about or influence on the bid of another
e) Bidder participates in more than one bid in this bidding process. Participation by a bidder in
more than one Bid will result in the disqualification of all bids in which the parties are
involved. However, this does not limit the inclusion of the components/ sub-
assembly/assemblies from one bidding manufacturer in more than one bid.
f) In cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their behalf in a
particular tender enquiry. One manufacturer can also authorize only one agent/ dealer. There
can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf; and
2. Indian/ foreign agent on behalf of only one principal.
g) A Bidder or any of its affiliates participated as a consultant in the preparation of the design or
technical specifications of the contract that is the subject of the Bid;
h) In case of a holding company having more than one independently manufacturing units or
more than one unit having common business ownership/ management, only one unit should
quote. Similar restrictions would apply to closely related sister companies. Bidders must
proactively declare such sister/ common business/ management units in same/ similar line of
i) Bidder shall not act in contravention/ violation to the provisions of competition act, as
amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration as per ANNEXURE,
that bidder shall not have conflict of interest/related with other bidders for particular quoted item,
04. Procedure for Purchase Preference and Price Matching :
A. Purchase Preference for items that are divisible in nature
a) Purchase preference shall be given in order of "Class-I Gujarat MSE, Class-I Local
Supplier, Class-II Gujarat MSE, Class-II Local Supplier, Non-local supplier" as provided
under this resolution subject to matching the L1 price & quantity.
b) The purchase preference mechanism is summarized as follows:
I. If the L1 price is of a Class-I Gujarat MSE, 100% bid quantity shall be awarded to
Class-I Gujarat MSE.
II. If L1 price is of a Class-I Local Supplier, preference shall be given to Class-I Gujarat
MSEs, subject to the margin of purchase preference and matching the L1 price, then
50% of the bid quantity shall be awarded to Class-I Gujarat MSE, and the balance
quantity shall be awarded to Class-I Local Supplier.
III. If L1 price is of a Class-II Gujarat MSE, preference shall be given to Class-I Gujarat
MSEs, subject to the margin of purchase preference and matching the L1 price, then
50% of the bid quantity shall be awarded to Class-I Gujarat MSE, and the balance
quantity shall be awarded to the L1 bidder. If any of the Class-I Gujarat MSEs within
the margin of purchase preference is unable to match the L1 price, the 'class-I Local
supplier' subject to the margin of purchase preference and matching the L1 price and
bid shall be awarded accordingly. In case none of the Class-I bidders within the
margin of purchase preference matches the L1 price, the entire bid quantity shall be
awarded to the L1 bidder.
IV. If L1 price is of a Class-II Local Supplier, preference shall be given to Class-Gujarat
MSEs, subject to the margin of purchase preference and matching of the L1 price,
then 50% of the bid quantity and the balance quantity may be awarded to the L1
bidder. If any of the Class-I Gujarat MSEs within the margin of purchase preference
is unable to match the L1 price, the 'Class-I Local Supplier' subject to the margin of
purchase preference and matching the L1 price and bid shall be awarded accordingly.
In case none of the Class-I bidders within the margin of purchase preference matches
the L1 price, the Class-II Gujarat MSE' subject to the margin of purchase preference
and matching the L1 price and se on in case none of the Class II Gujarat MSE within
the margin of purchase preference matches the L1 price, the entire bid quantity shall
be awarded to the L1 bidder.
In case if the bid quantity is in odd numbers and the quantity to be divided between two bidders
then higher quantity will be awarded to L1. (For example, the bid quantity is seven, then it will
be divided into four versus three).
Procuring entity shall issue a price matching offer to all eligible bidders fulfilling the local
content, in the above order of preference and price matching criteria, and shall provide
working days to bidders to submit their written/online offer.
B. Purchase Preference for items that are not divisible in nature
In the procurements of goods or services which are not divisible in nature, and in
procurement of services where the bid is evaluated on price alone, the 'Class-I Gujarat MSE,
'Class-I Local Supplier' shall get purchase preference over 'Class-II Gujarat MSE', 'Class-II
Local Supplier', subject to margin of purchase preference and price matching, as per the
below order of preference:
In order of Class-I Gujarat MSE, Class-I Local Supplier, Class-II Gujarat MSE, Class-II
Local Supplier, Non-local supplier
The purchase preference mechanism is summarized as follows:
I. If the L1 price is of a Class-I Gujarat MSE, 100% bid quantity shall be awarded to
Class-I Gujarat MSE.
II. If L1 price is of a Class-I Local Supplier, preference shall be given to Class-I Gujarat
MSEs, subject to the margin of purchase preference and matching the L1 price, then
100% of the bid quantity shall be awarded to Class-I Gujarat MSE. In case none of the
Class-I Gujarat MSEs bidders within the margin of purchase preference matches the
L1 price, the entire bid quantity shall be awarded to the L1 bidder.
III. If L1 price is of a Class-II Gujarat MSE, preference shall be given to Class-I Gujarat
MSEs, subject to the margin of purchase preference and matching the L1 price, then
100% of the bid quantity shall be awarded to Class-I Gujarat MSE. If any of the Class-
I Gujarat MSEs within the margin of purchase preference is unable to match the L1
price, the 'Class-I Local Supplier' subject to the margin of purchase preference and
matching the L1 price and bid shall be awarded accordingly. In case none of the Class-
I bidders within the margin of purchase preference matches the L1 price, the entire bid
quantity shall be awarded to the L1 bidder.
IV. If L1 price is of a Class-II Local Supplier, preference shall be given to Class- I Gujarat
MSEs, subject to the margin of purchase preference and matching of the L1 price, then
100% of the bid quantity may be awarded to the Class-I Gujarat MSEs. If any of the
Class-I Gujarat MSEs within the margin of purchase preference is unable to match the
L1 price, the 'Class-I Local Supplier' subject to the margin of purchase preference and
matching the L1 price and bid quantity shall be awarded accordingly. In case none of
the Class-I bidders within the margin of purchase preference matches the L1 price, the
'Class-II Gujarat MSE' subject to the margin of purchase preference and matching the
L1 price and so on. In case none of the Class-II Gujarat MSE within the margin of
purchase preference matches the L1 price, the entire bid quantity shall be awarded to
C. Applicability in tenders where contract is to be awarded to multiple bidders :
In tenders where contract is awarded to multiple bidders subject to matching of L1 rates
order of preference (for scenarios listed in Clause 4A) shall be: Class-I Gujarat MSE, Class-
I Local Supplier, Class-II Gujarat MSE, Class-II Local Supplier, Non-local supplier. Order
splitting quantity shall be finalized by the concerned procuring entity before tendering &
shall clearly mention in the tender.
D. In case of Bunch Bid, Supplier will get benefits of Clause 4, only if supplier fulfils criteria
of local content for all items of Bunch bid. Bunch bid is the grouping of similar
products/services in a single bid based on the relevance of the categories of
products/services being procured.
E. Verification of local content :
a) The 'Class-I Gujarat MSE', 'Class-I Local Supplier' 'Class-II Gujarat MSE' and Class-
II Local Supplier', shall be required to indicate percentage of local content and provide
self-certification that the item offered meets the local content requirement at the time
of tender bidding or solicitation. They shall also provide details of the location(s) at
which the local value addition is being done.
b) In cases of procurement for a value in excess of Rs. 10 crore, the 'Class-I Gujarat MSE',
'Class-I Local Supplier', 'Class-II Gujarat MSE' and 'Class-II Local Supplier' shall be
required to provide a certificate from the statutory auditor or cost auditor of the
company, if entity is registered under company Act. While in case of other entity,
supplier shall provide certificate from a practicing cost accountant or practicing
chartered accountant certifying the percentage of local content.
Note : To qualify for purchase preference, such MSEs must possess :-
1. A valid Udyam Registration for the product manufactured or service provided and address
should be in Gujarat. And
2. A valid Central Stores Purchase Organization (CSPO) / National Small Industries
Corporation (NSIC) Registration.
05. Migration period for Reclassification of MSMEs: In case of an upward change in terms of
investment in plant and machinery or equipment or turnover or both, and consequent re-
classification, an enterprise shall continue to avail of all non-tax benefits of the category (micro or
small or medium) it was in before the re-classification, for a period of three years from the date of
such upward change.
06. The undersigned reserves the right to accept / reject any or all tenders without assigning any reason
07. Any alteration / addition / deletion will not be considered after opening of tender, unless called for
by the GSECL for negotiations.
08. Subletting of tender is not permitted, however sub-contracting is permitted with the consent of
Chief Engineer (Gen.), GSECL Ukai.
09. Validity : The tender shall remain open for acceptance for a period of at least 180 days from the
date of opening of technical bid.
10. Security Deposit (SD) : Security Deposit to be paid is mentioned as below:
a) For parties eligible for exemption from paying the EMD :
Parties eligible for exemption from paying the EMD amount will not be required to pay
the Security Deposit for order end cost values up to Rs. 5 lac.
However, these parties (i.e. Parties eligible for exemption from paying the EMD) will
still need to provide a security deposit for order end cost values above Rs. 5 lac, the
security deposit will be 3% of the order end cost value.
b) Remaining parties i.e. Not Eligible for EMD Exemption will have to pay Performance
security (Security Deposit) @ 5% of the order end cost value for all order values.
11. Security Deposit will be collected from the successful tenderer at the rates mentioned in final
work contract. This may be recovered by deduction through running bills of the contractors and
/ or by treating the Earnest Money Deposit (Bid Security) paid at the time of submission of the
12. SD will be accepted by RTGS/NEFT, BG also.
The bank details are as under,
Beneficiary Name : M/s. Gujarat State Electricity Corporation Ltd.,
Address : Urja Nagar, GEB Colony, Taluka: Songadh. Dist.: Tapi.,
Bank Name : Bank of Baroda Ukai,
Nature of A/C : Current Accounts, Branch: Ukai,
IFSC CODE No. : BARB0UKAIXX (0 = ZERO),
MICR CODE No. :
13. Bidder must have to submit confirmation of BGs through Structured Financial Messaging
14. GSECL GSTIN No.: 24AAACG6864F1ZO
15. Relationship with employee :
Every bidder should, at the time of submission of bid, give a declaration in their letterhead as
“If in any Bidder Company/ firm, the interest (i.e. Shareholding in company and share in
partnership firm) of any employee of the tendering Company or his/ her relative as defined in
Section 2(77) of the Company’s Act. 2013 is 10 percentages or more, the tendering Company
will not deal with such Company/ Firm at all.
Tenderer therefore, must specifically disclose this fact in his technical Bid. Non-disclosure of
such facts would immediately disqualify the Tenderer for further dealing with the Tendering
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
Other GENERAL INSTRUCTION TO TENDERERES
Tenders are invited from the contractors / firms who have executed same/similar job works
1. Tenders documents are in two bids system i.e. “Technical Bid “and “Price Bid (online on nProcure
i) Financial qualification criteria as mention in PQR
ii) Separate EPF Code No. Allotted by RPFC.
iii) GST No. and PAN No. shall have to submit with Tech. bid.
iv) Experience evidence as per requirement in PQR.
v) Details of available equipments & Tool-Tackles along with the tender as per PQR.
The above documents shall be upload along with technical bid in online. Also the successful
contractor has to obtain valid labour license and Group Insurance Policy of the insured
labourers under W.C. Act. Immediately for sufficient labours for the contract is entrusted
and for extended period if any.
1.1. Bidders are requested to submit price – bid (Part-II) on-line (on nprocure portal) only and not
to submit the price bid in physical form. This is mandatory. If price bid is submitted in physical
form, same will not be opened and only on-line submitted price bid will be considered for
1.2. It is mandatory for all the bidders to submit their technical bid documents on – line (e-
tendering) only in schedule time. Tender documents submitted in physical form will not
be accepted and same will not be considered.
2. Bidders shall upload complete the tender documents in all respects and they are to be signed with
Company’s seal on all pages.
3. The bidders shall upload their offer without any deviations in general terms and conditions of the
contract, or in Technical specifications/Items. Tenders with such deviations, shall be rejected.
Incomplete and conditional tenders shall not be considered.
4. GSECL reserves the right to split up the work covered in the scope of this contract amongst more
than one contractor.
5. Intending bidders shall submit tenders after studying all tender documents carefully and after
visiting the site for satisfying themselves of actual site conditions, location and accessibility of site
and nature and extent of the work involved etc.
6. Submission of tenders implies that bidders have obtained all necessary information and other data
required for executing the work. No, claim for extra charges on account of any misunderstanding
or otherwise will be allowed.
7. Site cleaning and all approaches to the site shall be in the scope of bidders.
8. Bidders will not be allowed to give sub-contract of the works awarded to him for any reasons what
so ever without permission of Chief Engineer (Gen.), GSECL Ukai.
9. In the experience certificate, contractor has to furnish the details of same / similar works executed
by him along with the list of equipment’s, tools and tackles and manpower available with him
along with the details of the same, which he intends to deploy on site of the work. The successful
contractor has to deploy all such resources at site during course of work.
10. Tenders without Payment of TF / EMD or with part payment of TF / EMD will not be opened or
considered. Those who are exempted from payment of TF / EMD shall submit a copy of certificate
along with the tender.
11. After opening of Technical bid no revised price from any bidders will be accepted.
12. Price quoted shall be firm, till overall completion of the work, under contract and there will not be
any price escalation.
13. Date of opening of price bid will be intimated later on to those bidders who are qualified in
technical bid. Price bid of only qualifying bidders on the basis of evaluation of technical bid shall
only be opened. Price bid of bidders who are not technically qualified as per requirement of special
note for prequalification shall not be opened.
14. The decision of GSECL in the matter will be final and no any claim will be entertained in this
15. Tender shall remain open for acceptance, subject to the validity period of 180 days from the date
of opening of Tech. bid and during this period no tender shall be allowed to withdraw his tender.
Any such withdrawal during the period will entail forfeiture of the Earnest Money deposited with
16. All the works shall be carried out as per specifications attached with the tender and relevant Indian
Standards issued by the Bureau of Indian Standards. All materials procured should be confirming
to relevant Indian Standards issued by Bureau of Indian Standards, wherever not specified in the
17. Tenders, which do not fulfill all or any of the conditions of the tender or incomplete in any respect,
are liable to rejection.
18. GSECL reserves the right to reject any or all the tenders without assigning any reason thereof.
19. All royalties, sales tax, toll tax, local tax, development charges, GST, welfare cess and any other
taxes including works contract tax etc., in respect of this contract and also any statutory variation
in future towards above mentioned taxes & any other taxes if levied in future by statutory authority
applicable to the this contract shall be payable by the contractor and GSECL will not entertain any
claim whatsoever in this respect. The rates will be "Excluding the GST”. The reimbursement
against “GST" will be paid to the contractor as per Govt. & corporation, rules & regulations. The
proof of payment made by the contractor to the appropriate department shall be submitted to
GSECL, failing which appropriate amount shall be withheld on getting information/instruction
from the concerned department.
20. OH&S Management System Requirement :
It is to be noted that GSECL, Ukai TPS is establishing and implementing Occupational Health
& Safety Management System complying with OHSAS18001:2007.
You as a part of the GSECL Ukai team and as defined by the scope of mentioned standard, all
contractors are required to comply with and participate to prevent occupational Health and
safety hazards and risks including observation of safety rules. Further you are also to comply
with all applicable legal requirements while executing the work, in case the job is assigned to
21. Party shall have to submit documents before cutoff date in online submission only as mentioned
in tender notice.
22. Technical and financial bids shall be compulsorily submitted simultaneously online i.e. no time
gap in submission of technical and financial bids.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
BID PRE QUALIFYING CRITERIA
Sub: The work of online, preventive and breakdown maintenance of coal mills XRP-1003 and its
associated auxiliaries of 500 MW unit No.6 of GSECL Ukai TPS. (BMD-6)
Pre-Qualification Criteria of Technical Bid
The bidders who wish to participate in the bidding shall satisfactorily establish that they fulfill
the following Qualifying Requirements.
Tender Pre-Qualification Criteria
1 The bidder must furnish the following certificate/documents/work
orders with their technical Bid.
The bidder should produce certificate/document/work order copy as
evidence for experience of having successfully completed similar
works/jobs carried out satisfactory in last seven year period in any
power station/government/semi Government /state electricity
board/corporation body/private limited company/public limited
Moreover, Experience of having successfully completed similar
works during last 07 years ending last day of months previous to the
one in which applications are invited. Similar works should be
either of the following:
Three similar completed works each costing not less than the
amount equal to 40% of the estimated cost.
Two similar completed works each costing not less than the amount
equal to to 50% of the estimated cost.
One similar completed works costing not less than the amount equal
to 80% of the estimated cost.
Similar work means: “Online, Preventive and Breakdown
Maintenance of Coal Mills (BHEL make XRP 623/
763/783/803/883/1003 and Higher capacity than XRP 1003), along
with complete overhauling & servicing work OR ARC/BRC work
order of coal mills of any unit having capacity of 75 MW or higher
in power plant”.
2. Details of minimum tools, tackles and equipments in possession
relevant to the job. However party should have to arrange/maintain
sufficient tools-tackles, equipments and materials at site as per site
requirement or as per instruction of EIC and give consent for the
same along with bid.
3. Details of P.F. Code No. from appropriate authority.
4. Financial qualification criteria:
1) The Average Annual Turnover of the bidder, shall not be less
than 30 % of estimated cost for tender during the preceding
three (3) financial years as on date of Techno-Commercial bid
2) Net worth of bidder shall not be less than 100% of the bidder’s
paid up share capital as on the last day of the preceding
financial year. In case the Bidder meets the requirement of Net
worth based on the strength of its Subsidiary (ies) and/or
Holding company and/or Subsidiaries of its Holding
Companies wherever applicable, the Net worth of the Bidder
and its Subsidiary (ies) and/or Holding company and/or
Subsidiary (ies) of the Holding Company, in combined
manner should not be less than 100% of their total paid up
share capital. However individually, their Net worth should
not be less than 75% of their respective paid share capitals.
Net worth in combined manner shall be calculated as
Net worth (combined) = (x1+x2+X3)/(y1+y2+y3) X
where x1,x2, x3 are individual net worth which shall not be
less than 75 % of the respective paid up share capitals and
y1, y2, y3 are individual paid up share capitals.
3) In case the bidder is not able to furnish its audited financial
statements on stand-alone entity basis, the unaudited
unconsolidated financial statements of the bidder can be
considered acceptable provided the bidder further furnishes
the following documents for substantiation of its qualification.
Copies of the unaudited unconsolidated financial
statements of the bidder along with copies of the Audited
consolidated financial statements of its Holding Company.
A Certificate from the CEO/CFO of the Holding Company,
stating that the unaudited unconsolidated financial
statements form part of the Consolidated Annual Report of
4) In cases where audited results for the last preceding financial
year as on the date of techno-commercial bid opening are not
available, the financial results certified by a practicing
Chartered Accountant shall be considered acceptable. In case,
Bidder is not able to submit the Certificate from practicing
Chartered Accountant certifying its financial parameters, the
audited results of three consecutive financial years preceding
the last financial year shall be considered for evaluating the
financial parameters. Further, a Certificate would be required
from the CEO/CFO, stating that the financial results of the
Company are under audit as on the date of Techno-
commercial bid opening and the Certificate from the
practicing Chartered Accountant certifying the financial
parameters is not available.
5) The bidder must submit Average Annual Turnover and Net
worth Certificate in support of Financial QR, duly certified
and verified for authenticity from Independent Statutory
Auditor of their company / Practicing Charted Accountant/
C.A. Firms / TPIA (Third-Party Inspection Agency )
empanelled approved by GSECL, along with copy of Annual
Audited Accounts of last three years.
Note for point No. 1, 2, 3 & 4:
i. Other income shall not be considered for arriving at annual
ii. “Holding Company" and “Subsidiary Company” shall
have the meaning ascribed to them as per Companies Act
of India, in vogue.
iii. Net worth means the sum total of the paid up share capital
and free reserves. Free reserve means all reserves credited
out of the profits and share premium account but does not
include reserves credited out of the revaluation of the
assets, write back of depreciation provision and
amalgamation. Further, any debit balance of Profit and
Loss account and miscellaneous expenses to the extent not
adjusted or written off, if any, shall be reduced from
reserves and surplus.
5. Consent for obtaining contract labour license from the appropriate
authorities for throughout the work contract.
6. Consent for the WC policy of all the contract labours duly engaged
throughout the work contract.
7. Details of registered partnership deed in case of partnership firm
and activities of association and memorandum of association in case
of company and notarized copy of same should be submitted along
8. The tender shall be opened of the paid EMD only.
9. Party should have to submit duly filled, sign and seal Certificate –
“A” along with bid.
10. Party has submit the soft copy of downloaded tender document,
condition of the contract, specification & other relevant documents
duly stamped and signed. OR Instead of the same, the bidder shall
submit the duly Notarized Undertaking as stated declaration form
on the stamp paper of Rs.300/-.
11. Conditional tender is liable to be rejected. Withdrawal or insertion
of conditions unilaterally after opening of tenders will not be
permitted unless it so desired by the GSECL.
12. Party should have to submit the details of the copy of registration
number regarding GST along with Technical Bid.
13. Party should have to submit PAN No. copy.
Non-compliance of above criteria the technical bid is liable to be rejected. After acceptance of the
Technical Bid, Price Bid will be considered for opening.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
Name of work:- The works of online, preventive and breakdown maintenance of coal mills
XRP-1003 and its associated auxiliaries of 500 MW unit No.6 of GSECL Ukai TPS
PART –‘A’ : GENERAL TERMS & CONDITION OF CONTRACT : -
01. The contract means the document forming tender and the subsequent agreement that may be
02. The General rules and regulations of the Corporation for tender and contract for works
will apply to the extent the same are not modified herein. Any other rules and regulations,
conditions etc. that are in force in present and that may be framed by the Corporation
from time to time in condition with contracts will be binding and acceptable to the
03. Sub- letting or transfer of contract without prior written approval of Corporation will
be treated as a breach of contract and it will be punishable by forfeiting the security
deposit as well as termination of contract.
04. The contractor have to pay total 5% of the order end cost value (including GST) as
security deposit within a 07(Seven) days of receipt of Letter Of Intent(LOI).
05. The contractor shall hold the Corporation indemnified against and in respect of any claim
arising out of injury to any persons, loss of life, workman’s compensation or any other claims
whatsoever. The contractor shall be responsible for any damages to any property of
the Corporation due to negligence of the contractor or his employees. The Corporation
will be entitled to recover the damages from the contractor and it shall be final and
binding to the contractor.
06. The successful bidder will have to enter into an agreement with GSECL and the cost
of the stamped paper will be borne by the contractor. The contractor will also have to
execute an indemnity bond on required value of stamped paper as per GSECL rules. The
cost of the stamped paper will be borne by the contractor.
07. The party shall strictly observe all the labour laws and Factory Acts in existence and
amendments made from time to time
08. (A) Party shall have to strictly observe all safety rules as per the Factory Act – 1948 and
whatever amendments made from time to time to avoid any chances of accidents. Contractor
shall have to strictly follow the instructions of safety officer.
(B)The safety precautions issued vide this office circular no. CCUT/ SAFETY/ 490 / CIR /
345A dated 14-12-90 are applicable to this contract also and to be followed strictly.
(C) Before starting the contract, it is advisable that party shall have the documents for
insurance of workers.
09. The work shall be completed within stipulated time. If required, party shall have to work
round the clock to maintain the work schedule.
10. Payment shall be made as per actual work done only.
11. The contractor shall have to take all necessary precautions to avoid fire during cutting,
welding, etc. In case of any smoldering fire, same should be extinguished by contractor
immediately using their own labour, tools, water & buckets etc.
12. The party shall arrange his own adequate tools and tackles, welding accessories, drilling
m/c , grinders, scaffolding, welding m/c, gas cutting sets, lifting materials like hydraulic
jacks, chain pulley blocks, Hook chooks, D-shackles, slogging spanners, spirit level, level
gauge, dial gauges & piano wire etc.
13. Party shall have to arrange all consumables, including required kerosene, rustolene, red
oxide, paints, grinding wheels etc. at his own cost.
14. An authorized and technically qualified representative of the contractor must be
available at site while the work is going on. The address & contact No. of the
representative should be submitted to this office so that party can be contacted
whenever required in connection with execution of the work. If representative is not
available at site then Rs. 1000/- penalty per day will be imposed.
15. Scaffolding materials like wooden sleepers, M.S. Angles, channels and plates if
available with GSECL, will be issued free of cost, otherwise contractor will have to
arrange for the same at his own cost. After completion of work scaffolding as is to
be removed immediately and should be credited to main store of Ukai TPS.
16. After completion of work, working area and surrounding area should be made clean
by removing M. S. debris and all types of scrap etc. Scrap should be credited to main
store and should be dumped at place shown by E. E. (Store).
17. Electrical connection and power consumption will be given free of cost at one
mutually agreed point.
18. Oxygen/ acetylene gas, if available, will be issued on chargeable basis from GSECL
main store, otherwise the party has to arrange on its own. The empty cylinders should
be returned to main store within stipulated time.
19. Shifting, transportation of materials from main store/tool room to working site shall have
to be done by contractor at his own cost.
20. Party shall submit daily progress report for the work carried out by them. If party fail to
submit the same then Rs. 200/- per day will be imposed as a penalty.
21. Penalty Clause: Any delay that may take place in contract in works activities beyond
Contractual cutoff date/stipulated period in the order shall be subjected to penalty (not
liquidated damages) at the rate of 1/2 % of the contract price/order price per week or part
thereof plus applicable taxes (if any) on delayed portion or part thereof subject to maximum
of 10% plus applicable taxes (if any) of the total contract value/order value on delayed
portion (i.e. End cost including applicable Taxes (if any)
22. The contractor, if desires, can see the plant and site of work with permission of
undersigned on any working day during working hours.
23. Party has to carry out the work at site only.
24. The required spares given by the Corporation free of cost for carry out the work as per
Schedule-B. If any damages occurred while work, the actual cost of will be recovered from
the contractor.
25. Income Tax will be deducted at source at prevailing rates as per I. T. Act.
26. Do not mention any commercial terms/conditions in Technical bid. Any terms/conditions
related to commercial matter mentioned by you in Technical bid will not considered.
27. Party is abide to our corporation standard INTEGRITY PACT which available with technical
section and you may read if desire during office hrs.
28. The contractor shall have to submit the labour license of appropriate authority.
29. After completion of work contractor should have submit material account statement along
with reconciliation statement along with bill.
30. Bidders shall have to fulfil following criteria requirements while submission of technical bid.
a). Details of minimum tools, tackles and equipment in possession relevant to the job.
However party should have to arrange /maintain sufficient tools-tackles, equipments and
materials at site as per site requirement or as per instruction of EIC and give consent for
the same along with bid.
b). Details of P.F. Code no. from appropriate authority.
c). Consent for obtaining contract labour license from the appropriate authorities for
throughout the work contract.
d). Consent for the WC policy of all the contract labours duly engaged throughout the work
e). Details of registered partnership deed in case of partnership firm and activities of
association and memorandum of association in case of company and notarized copy of
same should be submitted along with bid.
f). The tender shall be opened of the paid EMD only.
g). Party should have to submit duly filled, sign and seal Certificate “A” along with bid.
h). Party has to submit/upload either all tender documents with duly signed & stamped or
Declaration form on 300/- Rs. Stamp paper.
i). Conditional tender is liable to be rejected. Withdrawal or insertion of conditions
unilaterally after opening of tenders will not be permitted unless it so desired by the
j). Party should have to submit the details of the copy of registration number regarding GST
along with Technical Bid. If party has two GST registration out of which one is cancelled
than party has to provide the “no due certificate” from GST department for the cancelled
GST registration.
k). Party should have to submit PAN No. copy.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Part-II (HR Related)
Name of work: The works of online, preventive and breakdown maintenance of coal mills
XRP-1003 and its associated auxiliaries of 500 MW unit No.6 of GSECL Ukai TPS
Special terms and conditions of payments (HR)
Sub: Special terms & condition and guideline for revision of Hardship cum attendance bonus
based contract labors engaged for the works of online, preventive and breakdown
maintenance of coal mills XRP-1003 and its associated auxiliaries of 500 MW unit No.6
of GSECL Ukai TPS.
1. Contractor has to pay labor rate as under
Description [A] [B] [C]
Min daily wage as per Hardship cum Hardship cum
GOG attendance bonus per attendance bonus
w.e.f. 01.10.2026 to day, if labors remain per day, if labors
31.03.2027 present for 14 day remain present for
and above 13 day and below.
a Skilled Labor Rs. 534.50/day Rs.215.00/day Rs 165.00/day
b Semi- skilled Labor Rs. 524.50/day Rs.215.00/day Rs 165.00/day
c Un Skilled Labor Rs. 513.50/day Rs.215.00/day Rs 165.00/day
Note : Payment shall be made considering 26 days per month accordingly total man days will be
2. Statutory liability : Towards EPF- 12.5%, Bonus 8.33%, EL-5%, and which are as per prevailing
statutory labors laws will be paid only on minimum labor wages as per GOG guideline mentioned
in Colum A above. Same will be reimbursed against submission of bill and supporting document
separately. In case of increased in minimum wage by GOG, total labor payment should be
increased accordingly category wise as mentioned in Colum-A above.
The Hardship cum attendance bonus at above column B&C shall be paid subject to following:
Attendances shall be reckoned by way of bio-metric only.
Weekly Off days shall not be considered.
Two national holidays i.e.26th January 15th August (if not weekly off days) will be considered.
In case of “On duty accident” the absence shall be considered.
It shall not be paid to Manager, site in charge & clerical staff engaged by contractor at site.
It shall not be payable for leave of any kind.
3. The other Liabilities such as WC Policy/ESI/Insurance Policy, Safety PPE such as Safety Shoes,
Safety Helmet, Uniform, Rain Coat, Gum Boot etc are included in the rate as per GSECL terms and
condition. No extra payment will be made
4. In case of any increase in minimum labor wages by GOG accordingly contractor has to pay
difference of wages of GOG rates + Stationary Liability on difference of wages and same will
be reimbursed to contractor extra. Party will have to submit all necessary documents and it
will be paid directly after due verification.
5. Engaged persons payment as mention at point no (1) to (4) above will be made by contractor as per
actual biometric presence and documents & payment to be paid to persons by RTGS/NEFE. It is
mandatory to have biometric punching of all staff of the contractor prior to entering the power house.
Payment of the workers has to be made by contractor strictly in their bank account as per their bio
metric presences. No payment will be admissible for the staff whose biometric presence is not
observed. Labour payment of workers will be reimbursed to the contractor on producing the
documentary evidence e.g. Bank statement account wise for labour payment. Any
banking/transition charges etc… to be borne by contractor. Biometric presence shall be provided by
TK. Office on chargeable basic of Rs.10/- per month. It will be the responsibility of contractor to
arrange for biometric punching as well as bank account & payment to workers in their account.
GSECL will not be responsible for the same. The contactor has to furnish daily biometric presence
report as well as their allocated locations. It is the liability of the contractor to observed that each
person entering the site with Biometric punch should the presence for all the working hours.
Validation of missing punch must be ensure at the entry and exit point of TPS gate by TK office. In
case of failure or missing punch due to system problem then it is to be immediately rectified
/recorded at TK office and allow worker for entry exit, accordingly payment shall be for such
incidents. Data of punching report in form of email will be provided to contractor by TK office.
6. After submission of payment of RTGS copy by contractor & verification by GSECL. Payment will
be reimbursed by GSECL in account of contractor on top priority.
7. Contractor has to quote in tender for service charge in schedule B as a separate item of respective
works contract i..e. Percentage of amount for providing total manpower involved for the subjected
work as per scope mentioned in tender.
8. For the respective work all the required consumbales, tool/ tackles, tractor and Hydra, diesel etc
contractor will be paid fixed lump sump amount. The rates for these items are considered as per
justified past records of existing contract
9. Contractor has to carry out the subjected work as per scope of work defined in tender/ order terms
& condition and ensure complete by them, if any negligence found, penalty as mentioned in tender
/ order will be imposed from contractor bill. Same will be decided by power station CE level
10. Manager, clerical staff and site in charge an any other required persons as per norms which are not
included in man days are not to be considered for labor payment. Their payment is to be considered
as service charges as per item no 3 and 4 of schedule-B. Contractor has to consider the same in the
quoted rate of service rate of service charges. Their liabilities/ responsibilities are to be consider in
the in the quoted rate of service head
11. The contractor have to maintain and monitor total 41 number of labour per day (three shift
including general shift labor and considering leave reserve /W/ off).
12. There will not be any payment to be disbursed against engagement of additional manpower.
Accordingly liabilities/difference of wages will be given only for engagement of 41 nos. of
manpower during running unit.
13. In each shift contractor has to provide labors and supervisors presence report work wise / location
wise to concern GSECL EIC within 15 minutes and work allotted to them.
14. If required labors/ skilled labors (supervisor) are not available during shift, at that time previous shift
labors/ supervisors can be required by contractor for plant routine work, however only single
payment will be reimbursed to contractor by GSECL. However, contractor has to pay the wages to
the labors/ supervisor in such case as per labour law/factory act. The payment of hardship cum
attendance bonus will not be paid by GSECL.(i.e. However, out of legally payable OT as per
factories Act (i.e double) only single payment towards minimum payment shall be reimbursed.)
15. Payment mentioned in schedule-B will be paid monthly bases upon satisfactorily completion of the
work as per scope and other terms conditions.
16. Bill payment to be paid after submitting of bill for executed items and evidence of labor liability
cleared by LWO and recording of bill in MB by EIC.
17. Before commencement of the work, contractor has to submit list of man power category wise.
18. Indemnity form as per attached annexure A1 shall be submitted by the contractor before
commencement of work.
19. For evaluating L-1 Bidder it will be on the basis of total amount offered in schedule-B i.e. total of
19. For evaluating L-1 Bidder it will be on the basis of total amount offered in schedule-B i.e. total of
all Items including service charges of schedule-B.
20. Service charges will be paid as per quoted rate by contractor only which is irrespective of labor
payment of item Sr no 1 of schedule B. [i.e If any change in labor wages/payment, there should not
be any change in service charges quoted by contractor].
21. As a contractor, the contractor shall be responsible and liable to pay difference in wages, if any,
and/or observe the revised service conditions that may be awarded by the Honorable Industrial
Tribunal effective from the date directed in the award.
22. The contractor must be maintaining regular labour record and should be paying all required
benefits to labour force contractor should obtain certificated to this effect from Labour
(A) The successful bidder (contractor) has to engage the IT protected labour as per Hon'ble
Gujarat High court in Special Civil Applicaton No: 13763/11, 13756/11.
(B) At present such contract is under operation in Unit No.6 of 500 MW. IT protected labours
are required to be retained by the successful contractor at site as per court order as per for
this work. Successful tenderer will have to execute an understanding/consent as per
Annexure – II attached herewith on non judicial stamp paper of Rs.100 = 00 and submit the
same before order placement.
(C) Wherever applicable, as per stay order of the court, as may be in forced from time to time,
the bidder will have to give consent and confirm that he will employ the IT related contract
workers engaged by present/previous contract. In case of misconduct by the workers, the
contractors can take suitable disciplinary actions against them directly.
(D) Considering the recent trend of the Court/Tribunal and High Court in respect of contract
labourers, it is advisable to the contractor to engage the labourers, who have been doing
this work during the tenure of the last contract. The GSECL on demand will give the list
of such labourers to the contractor.
(E) As per Stay Order of the court Law, as may be in forced From time to time , the decision
Whatever may be of honorable court in accordance with GSECL Shall be abide to
(F) The responsibility and liability of labours engaged other than IT protected labourers for
this work will be totally of contractor who has been awarded the contract and he will take
back all these labours to his own establishment on completion of the contract. The GSECL
will not be held any responsible and liable in any way in the matter.
(G) The liabilities of protected labours engaged will be reimbursed by submitting the necessary
24. Contractor shall have to issue the appointment letter to their labor engaged during the contract period
each & every instance & should be narrated clear cut terms and conditions for the liabilities of the
concerned contractor.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
SCOPE OF WORK (ANNEXURE-I)
Scope of work includes on line maintenance to be attended immediately and preventive
maintenance as per Schedule instruction given by Engineer-in-charge and breakdown
maintenance with minimum down time of eight mills XRP-1003 with associated auxiliaries. The
milling plant covers eight mills with auxiliaries as under:
1. Mills from Bunker flange to boiler flange with connected systems from main limb
termination point to mill as under :
I) Seal air system.
II) Mill inerting system.
III) Fire fighting system.
IV) Fuel piping.
V) Service air system.
VI) Instrument air system.
VII) Mill handling hoist.
VIII) Coal feeder.
IX) Cold air sealing system.
X) Mill reject system.
2. a) The ducting system from air pre heater outlet common duct flange up to individual
duct to mill flanges, including gates, damper and attachment and insulation. The ducts
include hot air Primary Air Duct, Cold Air Mix Air Duct
b) The cold air duct tapping from PA discharge common duct to individual mill
connections including gates/ dampers and attachment. In addition to above anything and
everything to be done to run the mills. This does not include electrical and C&I
TERMS AND CONDITIONS: (Pertaining to work)
1. The work consists of online, preventive & breakdown maintenance of 500 MW unit No.
bowl mills type XRP-1003 (Total 08 mills, having capacity of 72 TPH per mill.) All the
mills, feeder, seal air fans and its auxiliaries are required to be kept in adequate available
condition so as to avoid loss of generation and have maximum generation on unit. The
scope of work shall include all the maintenance works scheduled at Annexure- A & B to be
undertaken in minimum time so that the mills remain available for maximum generation. The
equipment scope is from bunker flange to boiler burner coal pipe fuel inlet elbows with mill
individual and common ducts.
2. The work consists of handling of materials, equipments from GSECL main stores & other
to 5 units to mill bay of the units. The dismantled items/equipments shall have to be returned
to the place of storage as directed by Engg.-in-charge, after required repair/maintenance.
The old spares should be removed immediately from the site and working area should be
kept clean and clear. The manpower is to be arranged for mill material checking if required.
3. The contractor shall be equipped/mobilized/ready in all respects with required/sufficient
skilled workman and all necessary general tools, tackles to take up any type of maintenance
job on mills, seal air fan etc. either on line, preventive and/or break down of any one or more
numbers of mills at a time in short notice of one hour.
4. In case of planned preventive maintenance work has to be started as per daily, weekly,
monthly, quarterly, half yearly schedule given by EIC and keep the records of
measurements, hard facing, etc.
5. In case of breakdown maintenance, the contractor shall mobilize all his resources
immediately and take up the required jobs as directed by Engineer.-in-charge on emergency
basis and shall have to complete within least possible time. Otherwise appropriate amount
of generation loss will be recovered from the bill if the down time of mill is more for each type
of maintenance.
6. Area of mills, Seal air fans, coal feeders & its auxiliaries shall be kept and maintained neat
and clean free of debris, scrap/coal dust/lubricant all the times so that working is not held-
up at any time.All old/worn out parts or new spares of mills, coal feeders seal air fans and
its auxiliaries shall be immediately removed from working area and credited either to store
or stacked properly in area as directed by Engineer-in-charge on completion of work. Failing
which appropriate value old/new material will be recovered in case of loss/theft of material.
7. Any deviation, omission, alternation, modification of mills, seal air fans, coal feeders, RC
feeder and its auxiliaries that may be felt necessary by Engineer-in-charge to suit operation
condition/to maintain generation and/or to suit site condition and or to improve performance
of the plant and or suggested by original equipment manufacturer by M/s. BHEL for
improvement/betterment of the plant shall be carried out by the contractor as part of this
contract without any extra cost. The quantum of job/frequency of job to be carried out or to
be attended on each mill/ RC Feeder /Seal air fans / gravimetric feeder and its auxiliaries
can be increased as per operational conditions.
8. All the jobs shall be carried out as per instruction under direct supervision of contractor’s
supervisor and to the entire satisfaction of Company’s Engineer-in-charge or his
representative and the mill under maintenance shall be brought back to operation within
shortest period so that generation may not be affected. Contractor‘s supervisor has to take
reading of mill temp., Amp, mill running hrs etc. from control room/mill plant of respective
Unit in the beginning of every shift & recorded in daily progress report.
The contractor shall have to work round the clock on shift basis and the work started shall
be carried out nonstop till completion of job and safe commissioning of the mills.
9. The line clear/yellow tag shall be issued to the contractor supervisor or his representative
on his behalf for maintenance work & work shall be treated as completed when the
equipment is accepted by operational staff and put into service. Any defects noticed on
putting mills into operation after repair shall have to be rectified for which no extra payment
10. The contractor shall be allowed to use hoist provided in mill plant free of cost. However same
shall be used without any damaged. Any damage shall have to be repaired by the
contractors, otherwise recovery for the same shall be made, and overhead trolleys are to be
maintained in good condition by contractor. Minor mechanical maintenance of handling
system is included in this contract without using spares. Alternative arrangement is to be
made if hoist is not available in this contract rates only.
11. During maintenance of the mills, the chequred plates/supporting channel/beams/grills etc.
of mill floor area are removed and same should be replaced on its original place after
completion of work. During the maintenance work/overhauling work, the damaged chequer
plates/supporting channels/beams/grills etc. should be repaired immediately by the
12. Scaffolding material require to execute the work at height such as attending puncture of coal
pipe, bend etc will be arrange by contractor. Whenever required scaffolding will be prepared
by party. Once work completed contractor shall have to dismantle scaffolding, juggar etc.
13. The party will have to submit monthly bill in triplicate regularly. The contractor has to submit
the material accounts in appropriate from without fail. Payment mentioned in schedule-B will
be paid monthly bases upon satisfactorily completion of the work as per scope and other
terms conditions.
14. Consumables like kerosene, Rustolene, Hacksaw blades, foam seal sealer, Dum-Dum M-
seal, grinding wheels, cotton wastage, hold tight, gasket shellac compound, Diesel, Pen oil
& Anabond, Weight instrument of ISI mark for the capacity of 0 Kg to 20 Kgs etc. shall have
to be arranged by the contractor. Also all welding consumables and accessories such as
welding machine, cables, holder, gas regulator, gas cutter, heating torch, and portable hand
grinder shall have to be arranged by the contractor. Along with the material account
contractor has to submit the list of expenditure for afore said consumables utilized during
each month with duly entry by the TPS main gate CISF. However, if required, GSECL will
issue gas cylinders, on chargeable basis if available. Electrical connection and consumption
will be given free of cost as per requirement, looking to the site conditions as decided by
Engineer-in-charge. The amount is lump sump basis. Contractor require to arrange
consumable as per actual site requirement
15. (a)For item sr.no.3 the party has to submit documentary evidence to claim the amount
actually consumables received and utilized per month RA Bill (i.e, Entry
pass/challan/PAKKA Invoice) dully sign and stamped by CISF, Ukai TPS Main gate. The
same should be summarized and submitted along with monthly Bill claim. Reimbursement
will be made within the quoted rates. No Extra payment will be made against amount
exceeding quoted rates. For the consumable items amount will be reimbursed as per
prevailing/justified rates as decided by EIC.
16. Small bearings, gears, rubber parts, nut-bolts, minor spares if not available with GSECL and
if instructed by Engineer I/c. contractor has to purchase and the payment of the same shall
be reimbursed to contractor as per “PAKKA’ invoice from supplier in the name of GSECL.
17. In case of any work on motor side and if required, the contractor has to carryout
decoupling/alignment and re-coupling etc. of the mill motor immediately after putting the
motor on foundation by other agency.
18. Mills should be maintained in such a way that there should not be any chance for fire inside
or outside. In case fire takes place, immediate actions are to be taken to put out the same
in consultation with shift charge engineer and fire fighting crew.
19. To improve the efficiency of the mills, all types of Major/minor modifications as suggested
by Engineer-in-charge or OEM are to be carried out by the contractor within quoted rates.
20. Contractor have to maintain flow in pulverized coal pipe as per design to avoid jamming of
coal pipe and velocity should remain same in all pipe.
21. Contractor will not be penalized for non-availability of mills during reduced generation due
to system conditions or any other trouble elsewhere in the plant only. Availability of mill
should not be reduced at any time. During such period, preventive maintenance can be
arranged as per instruction of Engineer-in-charge.
22. During the maintenance work, any damage to valuable parts or damage to the parts due to
mishandling, excessive wastage of material will be considered seriously and appropriate
amount will be deducted from the bill. The amount will be decided by Engineer-in-charge
and binding to the contractor.
23. Mill discharge pipe line, from mill top to burner if found chocked-up are to be cleaned by the
contractor whenever required. Also mill suction feed pipe from mill to RC feeder and feeder
suction pipe from bunker gate 1st gate below bunker to RC feeder are found chocked up are
to be cleaned by the contractor. The bunker pocking & hammering is included in case of
24. The party has to submit daily report for ‘Hourly mill availability’ in the sample proforma given
by GSECL with reasons stating therein of non availability of mill. Subsequently forms etc.
should be got printed by the contractor.
25. Mill maintenance does not mean only replacement old/broken/worn out parts by new parts
but party will have to carry out necessary repairing work of spare part as per the direction of
GSECL Engineer-in-charge for that no extra payment will be made. Handling of spares for
machining from mill bay to work shop and recollection is included in this contract rate.
26. Repairing of Bowl hub (minor), trunion arm head, journal shaft of roller assembly, spring
assembly, labyrinth seals, lub oil pumps, filters, lub oil cooler, journal bearing housing by
metal filling and hard facing of straight pipe piece after mill outlet elbow is to be carried out
by the contractor using appropriate welding electrodes as per instruction of Engineer-in-
charge within the quoted rates.
27. Replacement of damaged feeder belts as and when required, it is to be replaced by the
contractor. The servicing of feeder rollers, repairing/replacement of seal plate, support plate,
scrapper belt, chain sprocket etc. shall be done by the contractor in the quoted rate.
28. If material is not available with GSECL, then party shall have to use the material of other
mills after dismantling as directed by Engineer-in-charge within the quoted rates.
29. Hard facing of mill discharge valve assembly, multi port assembly, coal mill distance piece,
orifice plates, ventury cone mill outlet bends, straight pipes after bend, mill body etc., before
replacement shall be carried out by hard facing electrode issued by GSECL.
30. Repairing of mill plate form including bend/damaged grills and their supports and railing have
to be repaired/replaced by the contractor without any extra cost.
31. Looking to the quantum of work, contractor has to increase the man power as per instruction
of Engineer-in-charge in his quoted rates.
32. The sample of oil and coal are to be collected and given to chemical laboratory for analysis.
33. Party shall envisage the requirement of material in advance by one month and same shall
be intimated to Deptt. Head so that necessary arrangement can be made to make the
material and spares available.
34. Party shall have to create an arrangement separately for storing and maintaining the spares.
Party shall have to keep one person separately who maintains the stock register as per the
guidance given by Engineer-in-charge.
35. Monitoring and maintaining record of consumption of bearings, special electrodes and
critical spares is very crucial and important aspect. Contractor shall assist fully to prepare
such records very precisely. Necessary formats guide line will be given by Engineer-in-
36. Facility of quarter will be extended to the representative of contractor only on chargeable
basis as per Company’s standard norm. Internal telephone will be provided at site office and
at the residence of representative of contractor if possible.
37. Material account register, register showing the life of rollers and their wear out measurement,
register showing the life of bearings, should be maintained day to day properly positively for
record of material consumption when even Engineer-in-charge asked to it must be shown.
38. Contractor shall collect all dirty lube oil unserviceable lube oil in empty drum and shall credit
the same to main store.
39. The history registers of inspection and replacement of bearings and other important mill
spares, consumption of various lubricant oil shall be kept and maintained by the contractor
and submitted to Engineer-in-charge every week or as and when demanded by Engineer-
40. a) For planning of materials procurement, contractor shall have to inform well in
advance with submission of list of spares as per site stock condition/work
b) Contractor has to keep surrounding area clean (removal of coal dust debris) before
starting any welding work in mill area and shall take all precaution to avoid fire hazard
41. Contractor’s supervisor has to report to EE (Shift) as well as E.I.C. of maintenance for
beginning of every shift to take instruction from him if any, for smooth running of the plant.
42. Contractor’s supervisor must available at mill area so as to enable operation staff to contact
immediately, supervisor will not leave working place without informing EE(Shift)/EIC.
43. Contractor has to repair/attend any punctures in coal mill system round the clock as per
instruction of EIC as part of this contract;
Coupling joint leakages of mills of unit i.e. leakages from bunker mouth to Gravimetric
feeder inlet/outlet piping from mill hopper multi port outlet with coupling joint
MDV assembly, straight pipe piece with coupling joint.
Mill outlet elbow and first straight pipe piece after mill outlet elbow including collar,
coupling and rubber element up to fuel inlet elbow (Excluding the fuel inlet elbow
coupling joint).
Straight pipes should be replaced with collar.
Mills reject system auxiliary & it’s piping from mill to collecting hopper.
During replacement/repairing of above the necessary welding general purpose
electrodes & required scaffolding shall be prepared by contractor without any extra
For patch work required patch material will be provided by free of cost. Necessary
consumables for attending leakages (i.e, Sodium Silicate, Dum dum, etc) shall be
born by contractor at their own cost.
44. Coal leakages/coal pipe/bends/coupling punctures onwards mill outlet first bends to burner
first bends are included in scope of contractor to have on line work with no leak condition in
45. Contractor has to provide ELCB switch on his every welding machine safety point of view.
46. Contractor has to dismantle trunnion shaft from old worn out journal head and refitting in
new journal head. During short shutdown of unit, for attending hot cold duct leakages.
Contractor has to remove duct insulation for attending duct leakage and refitting of same
after completion of work.
47. Major reclamation of worn out spares like clamping ring, MDV, Multiport, Top cover plate,
ventury with vertical feed pipe, P.F. bends, transition piece etc. shall be arranged separately
by contractor within quoted rates. However minor finishing work of the reclaimed spares prior
mounting in position falls in the scope of contractor.
48. During annual shut down/capital overhauling of unit contractor has to arrange for dismantling
mill outlet elbows of all the coal mills for inspection and repairing replacement as directed
by GSECL. If contractor fails to do the above work then recovery will be made from the bill
at a rate decided by competent authority.
49. Any special welding electrodes other than MS welding electrodes for mill maintenance work
shall be issued free of cost by GSECL. However, consumption detail shall be furnished by
the contractor to maintain the record.
50. To maintain the performance of mill necessary maintenance or any major/minor modification
suggested by GSECL EIC have to be arranged by party as part of the work scope without
any extra cost as decided by competent authority of GSECL.
51. Contractor has to repair/attend any punctures as well as coupling joint leakage of mills of
Unit Nos. 6 i.e. leakage from mill body. Multipart outlet with coupling joint, MDV assly.
straight pipe piece with coupling joints, mill outlet elbow and mill discharge pipe up to burner
fuel inlet elbow bottom coupling immediately round the clock as per instruction of Engineer-
in-charge as part of this contract.
52. During AOH / COH of Units or in short shutdown of units contractor have to replace worn
out / punctured coal discharge pipe, coal mill suction pipes & pulverized bends as per the
instruction of GSECL Engineer-In-Charge in the quoted rate only.
53. During short shutdown of unit for attending hot/cold air duct leakage, expansion bellow air
leakage, contractor has to remove duct/bellows insulation for attending duct leakage &
refitting of same after completion of work. Necessary insulation will be provided by GSECL
free of cost. Binding wire, screws etc. to be arrange by the party.
54. Contractor has to repair/replace damaged instrument air line/service air line, isolating valves
at mill area & RC feeder area.
55. Contractor has to provide “ELCB” switch on his every welding machine for safety point of
56. The contractor has to carry out the complete leak sealing of coal pipes right up to blr. burner,
over & above the work specified in condition 06 as per the technical/General terms &
conditions attached in Annexure-C as part of this contract without any extra cost.
57. During AOH/COH of unit’s contractor have to dismantle the mill outlet elbows of respective
unit as per the instruction of GSECL Engineer-in-charge. If any minor repairing is required
by special welding electrodes then GSECL will supply the same free of cost & the work
involved will be carried out by the contractor without any extra cost. Minor repairing of mill
discharge valve assembly and multiport assembly shall be carried out by the contractor in
the quoted rates. Necessary repairing special type welding rods shall be supplied by GSECL
58. In case of breakdown maintenance or in case of extra ordinary emergency situation,
contractor shall arrange to mobilize requisite additional labor force at short notice to meet
with such emergency situation over and above their normal routine staff without any extra
payment by GSECL. If contractor fails to carry out required emergency work in time
stipulated by EIC or if it is felt that adequate labor/skilled technicians are not employed
by contractor, then GSECL will recover the appropriate amount proportionate to nature of
work & cost involved.
59. Contractor has to keep surrounding area clean (Removal of coal dust debris etc.) before
starting any welding work in mill area & shall take all precaution to avoid fire hazard in this
area. After required repair/maintenance the old spares should be removed immediately from
the site and working area should be kept clean and cleared failing which appropriate amount
as decided & approved by C.E.(G) will be deducted from the contractor’s bill.
60. During monsoon or whenever the incidence of bunker chokes up are more, the contractor
has to arrange and keep the sufficient extra men power round the clock to carry out the
Feeder/Bunker hopper bottom portion/Bunker to feeder pipe/Feeder to mill pipe choke up
removal by manual hammering/water jetting / by pocking for 01 or more feeders
simultaneously in unit as per the instruction of EIC. Any delay resulted in generation loss/FO
consumption due to non availability of manpower the appropriate amount as decided &
approved by C.E. (G) will be deducted from the contractor’s bill.
61 You have to prepare history register for critical spares replacement & maintain the record of
material used during servicing/over hauling work.
62. All Mill LOP system & its nearby area shall be cleaned daily, must be free from coal dust/oil
Mill Reject System
1. To carry out routine, preventive and break down maintenance of whole system excluding
servicing of compressors. However if GSECL arrange for servicing of ELGI make
compressor in contractual period, party has to provide their labor with OEM without
charging any extra cost.
2. Attending different leakages (water, air, dust) in reject system. Replacement of conveying
pipe, bend etc.
3. Repairing / replacement of bag filter of silo.
4. Repairing/replacement of pyrite hopper.
5. Repairing /replacement of transporting vessels.
6. Repairing/replacement of meshes of pyrite hopper.
7. Repairing/replacement of pneumatic cylinder of knife gate valve of tramp ion.
8. Cleaning/clearing of chocked up boosting air and conveying line.
9. Attending leakages of fire fighting system.
10. Replacement of spool piece of tramp ion.
11. Repairing of both silo cone & plates. Air & oil filter cleaning/replacement.
12. Compressor air and oil filter cleaning/replacement.
13. Attending leakages of valves, pipe lines, coolers, receivers etc.
14. You have to carry out cleaning of pyrite hopper incase of failure of automatic conveying
system & and engage the manpower round the clock.
15. All other activity which is not mentioned here & related to MRS carried out by contractor.
16. Compressor oil checking/topping/replacement.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
PENALTY CLAUSES:
01 Prompt attending of defects/worn out parts is an essence of this contract. Generation loss
purely on account of non availability of mill will be considered very seriously. This will be
recovered when mill availability is delayed due to contractor’s fault. For this purpose mill
capacity will be consider as 72 TPH. i.e. Rs. 9840.00 per mill per hour will be deducted.
Six mills should be made available for maximum generation of 500 MW per unit.
02 To keep the mills on good condition, some preventive checks are prescribed. Non
implementation of such checks of running mill will result in deduction of Rs. 300/- per check
per day as required. Such preventive checks reading should be recorded.
03 The contractor has to carryout maintenance work very speedily to complete the work in a
prescribed time given by Engineer.-in-charge. Any delay in completion of such work on
mill will affect preventive maintenance of other mill and hence deduction will be
implemented @ Rs. 1500/- per day per mill. However exact amount will be decided by
competent authority of GSECL.
04 It shall be the responsibility of the contractor to have minimum rejection from each mill.
The party should analyze the cause of more rejection and attend the same immediately. If
the contractor is found negligence and responsible for having more rejection, then penalty
will be imposed @ Rs. 500/- cu.m. On the excess quantity of rejection as decided by Chief
Engineer (Gen), UTPS. Subject to reject coal qty. per mill per day exceeds 4 m3 & density
05 Mill, Gravimetric coal feeders and other auxiliaries should be maintained neat and clean
in such a way that there should not be any chance for fire inside or outside. In case fire
takes place, immediately actions are to be taken to put out the same in consultation with
shift charge Engineer and fire fighting crew. Mill top area. Mill platform/mill body/mill ducts
(common & individual all mill) seal air pocket both side, LOP, LOP vicinity area Gravimetric
coal feeders, coal discharge pipe line up to first bend, of the boiler corner shall be cleaned
daily by blowing service air or manually in the morning shift before 07=00 hours by service
air available at nearest point Rs. 1000/- per unit per day shall be deducted for not carrying
out the cleaning work & surrounding area underneath of mill, cable trays, of mill area etc.
are also to be cleaned as above before 07=00 hrs. Register of air blowing shall be
maintained daily with signature of respective mill plant operator.
06 Coal leakages/coal punctures from Bunker flange to boiler flange shall be attended by the
contractor. If required, spares have to be replaced to have ‘NO LEAK’ condition. The coal
leakages must be arrested immediately; if not attended, penalty per puncture at a rate of
Rs. 2000/- will be charged. The Leakages of all hot air duct and punctures are to be
attended as per outages/ isolation available.
07 Oil leakages from any auxiliary related to mils will be viewed very seriously and if it is not
attended during stipulated time Rs. 1000/- per mill per day will be deducted from the RA
08 Contractor shall have to use proper tools tackles for the maintenance works. Removal of
parts, bearings, shafts, gear by hammering is not allowed. If such occurrences are noticed,
penalty of Rs. 5000/- per occurrence shall be deducted from the bill with the approval of
competent authority.
09 Poor Workmanship Occurrence of poor workmanship, frequent repeated maintenance
will be viewed seriously. The amount of Rs. 10000/- per occurrence shall be deducted
from the bill with the approval of competent authority.
10 If scrap material not removed from mill area after completion of work as per instruction of
Engr-In-Charge. The amount of RS.5000/- per day will be deducted from the bill after
approval of competent authority.
11 Contractor or technical qualified authorized persons has to remain present at site & if it is
observed that work is carried out under GSECL supervision in his absence. Penalty of
GSECL official charges per hr. (on prorate basis) will be deducted from contractor RA bill.
12 Any deviation from mill maintenance work schedule, result will be in deduction of 10%
amount of respected RA bill. However exact amount will be decided by competent authority
13 Clause for Penalty for Delays. If the work is not upto the satisfaction as per scope given
by the EIC within stipulated time in all respects, the penalty will be levied as per Corporation's
rules. Penalty will be calculated with ref. to point no.1. Total penalty shall not be exceeded
10% of contract value.
14 Penalty clause for non- submission of reports and protocols:
SR.NO ITEM PENALTY PER CASE
01 Non- submission of daily report Rs 200/- per day
02 Non- submission of spare parts record and forecast of Rs.5000/- per incident
03 Non- submission of PM report on schedule time Rs 1000/- per Mill
04 Non availability of site in charge Rs.7000/- per day
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
LIST OF EQUIPMENTS OF MILLING SYSTEM OF UTPS UNIT #6
Item Description Nos. Per unit
TYPE-XRP 1003 with planetary gear
Make – BHEL Capacity-74.1 (Design
36” Gravimetric feeder
Coal Mill Rejection Dense Phase conveying System
3 System Make – H V Equipments Ltd.
On both side of boiler
4 Seal Air fans NDV 12.5 H
Sr. Equipment Nos. Per unit
Roller Journal Assembly ( 03 Numbers per mill + Spare
B Planetary mill drive & bowl assembly
C Mill side and liner assembly
D Separator body assembly
E Mill discharge valve assembly
F Electrical motor & coupling
G Seal air piping
2 Coal mill PGB lube oil system & piping
3 Coal pipe with couplings, collars, gaskets & orifices 32 (4 nos. per mill)
5 Coal sampling device & its fittings
6 Mill reject system
A Equipments related with dense phase conveying system
B ELGI air compressor
C Conveying piping -
7 PA cold & hot duct & its all gates and dampers -
8 Seal air fans and its pipings etc
9 Hot Air, Cold Air Dampers
10 Hot Air, Cold Air Gates
10 Metal Expansion Bellow
TENTETIVE TIMINGS FOR VARIOUS ACTIVITIES TO BE DONE FOR COAL MILL
01 Removal of foreign material and mill made available. 4 hrs.
02 Shear pin replacement in RC feeder. 30 minutes
03 Attending oil leakages of lubricant oil system. 30 minutes
04 Inside cleaning of gravimetric feeder 03 hrs
05 Replacement COC drive reducers 05 hrs
06 Cleaning, servicing feeder and replacement of belt. 16 hrs
07 Classifier vane replacement (Total 40 nos.) 10 hrs
08 MDV & multi port replacement (Total 04 + 04) 03 days
09 Roller assembly replacement including replacement of roller.
(per roller of mill)
10 Replacement of the entire three worn out roller. 4 days
11 Bull ring segment replacement 40 hrs
12 Scrapper assembly repair and refitting. 06 hrs
13 Dust guard joint replacement/ servicing. 01 Days
Complete mill overhauling including replacement of bull ring
14 segment, Grinding Rollers, Air port Assy, Classifier blades, 08 Days
various liners, servicing of roller assembly, spring assembly etc
and feeder servicing.
15 Replacement of air port assembly 04 days
Overhauling/servicing of planetary gear box assembly including
16 dismantling and refitting of gear box, replacement of 06 Days
bearings/coupling etc.
17 Changing the eccentric of roller assembly (All 03 per mill) 12 hrs
18 Spring assembly servicing (01 No.) 12 hrs
19 Cleaning of choked up coal discharge pipe 10 hrs
20 Separator cone replacement. 06 Days
21 Lower skirt replacement. 02 days
22 Complete mill overhauling. 25 days
23 Replacement of bowl extension liner. 01 day
24 Replacement of bowl hub cover & liner. 01 day
25 Replacement of Tramp iron 36 hrs
26 Labyrinth seal replacement (both) 02 days
27 LOP replacement 04 hrs.
The addition and alternation will be done in above chart after verifying actual characteristic of
1. The above work frequencies have been approximately arranged and will be corrected after
observation of milling plant performance.
2. Check list of daily, monthly and overhauling to be submitted regularly for activity carried out.
3. If Generation loss occur due to any reason, due to non-availability of mill under above
maintenance beyond the prescribed time then recovery will be made as per respective
penalty specified in penalty clause
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
1. On line maintenance shall be consisting of following but not limited to the same.
a) Removal of iron, foreign materials, rubber scraps, big stones from coal mills and
b) Repairing of replacement of coal rejection box/rejection gate to avoid passing hot air.
c) Repairing of air port Assay.
d) Checking of mill discharge pipes for coal flow checking.
e) Checking of oil level in roller assemblies of the coal mill once in a week during the
outage of said mill and if required make up is to be done.
f) Cleaning of tramp iron gates, Gravimetric/Volumetric RC/feeder, removing coal
chock-up of pipe from bunker to RC/feeder and RC/feeder to mill centre pipe and
inside mill, seal air pockets, mill top including discharge pipes & girders.
g) Checking and replacement of shear pin blocks of coal feeders regularly particularly
in monsoon season.
h) Rousing of cold and hot air damper, if any in running condition.
i) Greasing of bearings & spring assembly, topping of oil, filter cleaning etc.
j) Maintenance of hot air shut off gates,
k) Leakage in hot/cold air ducts to mills to be attended & also cleaning of both ducts
l) Replacement of rubber belts of gravimetric coal feeders tension checking and setting
of coal feeder belt.
m) Opening/closing of hot air cold air gates manually if asked by the operating staff.
n) Changing and setting of classifier blades for coal fineness 70% + 5% through
wire mesh as per chemical laboratory report.
o) Checking of coal feeder/opening the doors of feeder as and when asked by shift
charge engineer for the work of C & I or Electrical department.
p) Rousing of Bunker outlet valve, Seal air valve / worn up valves of RC feeder.
q) Replacement of labyrinth seal, LOP, filter cleaning, spare LOP servicing etc.
2. Preventive and breakdown maintenance.
a) Periodic checks for wear and tear shall be exercised as per instruction of EIC for
replacement of any of the following components.
1. Bull ring segments.
2. Grinding rolls.
3. Air port Assy.
4. Separator body (mill body).
5. All man hole doors.
6. Separator hood/liner.
7. Separator bottom and bracket liners.
8. Cover plates and its supports.
9. Roller chamber air vanes and individual duct air vanes.
10. Journal arm head journal skirt.
11. Bowl extension ring (liners).
12. Journal shaft and trunion shaft.
13. Upper journal housing.
14. Trunion bush (thrust and free end).
15. Inner cone.
17. Spring assembly.
18. Classifier bodies, blades etc.
19. Ventury outlet.
20. Separator body mill top cover plates and its liners.
21. Multi port outlet and its bolts.
22. Mill discharge valve assembly.
23. Coal mill distance piece.
25. All couplings with rubber gasket above mill top to mill outlet elbow including second
coupling of elbow and straight pipes.
26. Mill outlet elbow and straight pipes and its collar.
27. Deflector blocks of PF bends.
28. Mill center pipe & its nozzle (Bunker to mill).
29. RC feeder completes i.e. rollers, coupling chain and sprocket oil level etc.
30. Mill side liners and mill side bottom liners.
31. Mill bottom cover plate.
32. Mill bottom.
33. Dust guard, mechanical face seal, air seal housing upper skirt and lower skirts.
34. Dust guard seal/vition seal.
35. Scrapper and guard assembly or its parts.
36. Expansion bellows.
37. Trap iron box and its gate.
38. Pocking rods for bunkers.
39. Hot air/cold air control damper.
40. All gates/chain gates from Bunker to mill.
41. Repairing hard facing of mill body, mill top cover from inside by patch welding filling
and hard facing.
42. Changing the coal mill roller assemblies as per the instruction of EIC.
43. Replacement of jammed roller assembly and overhauling and servicing of same as
and when required.
44. Replacing of spring assembly. Stud if found broken in running condition, servicing of
spring assembly. Jack belt assembly.
45. Attending the oil leakages from shaft glands,oil level glass oil return line etc.
46. Replacement of bend/eroded bowl center cover oil level glass oil return line etc.
47. Replacement of bend/eroded bowl center cover plate, body liner, eroded bullring
48. Replacement of separator hood cover with liners and cover plate, replacement of
upper skirt/lower skirt assembly. Air vanes, bottom insulation plates, separator
brackets, attending punctures of inner cone etc.
49. Replacement of eroded/punctured mill discharge valve, multi port assembly, PF
bends, coal mill distance piece, straight pipes after coal mill distance piece, Victaulic
coupling gaskets of the mill discharge lines, coal discharge pipes upto boiler first
bend, Duct/Bellow repairing/replacement as and when required and instructed by
Engineer-in-charge for minimize the coal leakages from discharge pipe lines, PF
bends, mill discharge valve assembly, multi port assembly for satisfying ‘No leak
condition’ on the boiler.
50. Repairing/Defect attending/Replacement work of Planetary Gear Box.
b) In case of replacement of any spares, the following works shall be carried out
by dismantling required assembly to make mills ready for operational
requirement. Required spares shall be issued by GSECL free of cost as
decided by EIC.
1. Bowl & bowl hub.
2. Labyrinths seals.
3. Mill bottom plates.
4. Bowl hub skirt assembly with scrapper and guard assembly.
5. Oil cooler tube assembly including inlet and outlet valves and piping.
6. – Do- packing.
7. Seal air line all piping.
8. Classifier assembly, vanes etc.
9. Oil level indicator/return oil gauge glass with piping.
10. Dust guard and air seal housing.
11. Dust guard seal, Viton oil seal.
12. Upper/lower skirt assembly. /air seal housing.
13. All parts of labyrinth seal assembly.
14. Center pipe (bunker to RC feeder and RC feeder to mill).
15. Journal assembly.
16. Journal bearings.
17. Jacking bolts & bushing.
18. Spring assembly bearings.
19. Pressure spring inner & outer.
20. Grinding rolls.
21. Bull ring segments.
22. Air Port Assy.
23. Separator hood/liner.
24. Inner cone.
25. Classifier blades.
26. Ventury outlet & mill top cover plate.
27. Separator mill top.
28. Mill discharge valve assembly multi port assembly, coal mill distance piece & orifices.
29. Victaulic rubber coupling gasket of size 26”
30. Mill outlet elbow & deflector blocks.
31. Straight pipes.
32. Gravimetric feeder spares.
33. Center feed pipe coupling gasket.
34. All gates seals & spares.
35. Cold air chain gate spares.
36. Hot air/cold air control dampers shaft, gland bush, gland packing etc.
37. Mill motor coupling/decoupling & replacement of coupling, refitting & alignment
including removal/refitting of motor foundation bolts.
38. Seal air fans, filter and its dampers.
39. Fabrication of all air vanes & erection thereof.
40. Modification of extension ring segments.
41. Clamping ring for bullring segments.
42. Bowl mill center cover plate.
43. All type of PF bends.
44. RC feeder endless belts, bearings etc.
c) Whenever involved/required, oil shall be drained from PGB, cleaned and
refilled after re- assembly, oil shall be supplied by GSECL free of cost.
d) In case, where required, as instructed by the Engineer-in-charge, all clearance
shall be reset to keep the mill efficiently running/performing.
1. Roller clearance setting.
2. Air port assembly clearance.
3. Eccentric adjustments.
4. Journal spring tension.
5. Setting of classifier vanes.
6. Spring assembly gap setting.
7. Scrapper guard assembly fitting & setting its clearance.
8. Liner clearance setting.
9. RC feeder belt tension setting.
e) Lubrication of equipments recommended/directed by Engineer-in-charge.
1. Making up oil level in mill gear box ,RC feeder gear box & Greasing wherever
2. Journal jacking bolts greasing.
3. Journal assembly.
4. Mill & RC feeder coupling greasing.
f) PREVENTIVE & BRAEKDOWN MAINTENANACE OF GRAVIMETRIC
1. Greasing of following points of gravimetric feeder – Monthly
a) Belt-take up pulley
b) Belt take up screws
d) Tension roll shaft
e) Tension roll pivot
f) Weigh roller
g) Weigh span rollers
h) COC drive shaft
i) Conveyor take up pulley
j) Idle roller –Conveyor
k) Drive shaft –Conveyor
2. Greasing of following points of gravimetric feeder – 03 Months
a) Head pulley shaft
b) Conveyor takes up screws
3. Oil lubrication of 6 Months or every 2500 Hrs. of operation whichever is
a) Belt drives reducer housing primary casing. - 01 Ltr.
b) Belt drive reducer housing Main case - 2.8 Ltr
c) Clean out conveyor reducer housing - 4.5 Ltr.
4. Feeder Adjustment
To maintain maximum weighing accuracy, the following factors are essential:
Proper belt tension
Proper belt tracking
Proper alignment of weigh span and weigh rollers
Adjustment of seal air to a minimum positive air pressure in the feeder
5 Cleaning of conveyor belt.
6 Clearance should be maintain inlet side skirt & the top of belt.
7. Adjustment of Chain tension.
8. Replacement of conveyor chain.
9. Replacement/changing of endless belt, Alligator belt care should be taken while
Changing/replacing of belt,
10. Adjustment/setting of purge valve.
g) Wherever required, contractor shall submit bar chart for the job to be carried out
during shutdown well in advance for breakdown maintenance.
h) RC feeder maintenance including its gates, rollers chain & replacement of belts etc.
i) Seal air fan maintenance, including duct leakages.
j) Any worn out spares if not available same is to be fitted after minor repair, party
cannot insist for new spares only if possible.
k) In case of electrical motor failure, alignment of the same after repair and put in its
original places by other agencies should be carried out; coupling/decoupling of the
motors should also be carried out.
l) Continuous coal flow to mill should be ensured, if pipes are chocked, the same
should be removed by pocking/hammering or by any other means to have continuous
coal flow to mills.
m) Emptying of mill by removal of left over coal and cleaning of the same prior to
attending the internals of mills.
n) The party has to dismantle eroded orifices and refit new orifices as per instruction of
Engineer-in-charge.
o) During light load period, preferably at night, the contractor shall have to arrange to
carry out preventive and scheduled maintenance as well as puncture work so that
during day time (peak hours) all mills are made available for operation.
p) Date of commencement of the work is _________________________
q) Over and above what are given in this contract and in the connected documents, the
general terms & conditions given in the contract booklet, attached herewith shall also
be applicable to the extent that are applicable to this contract.
r) All PM Schedule given by EIC and according to schedule, Contractor have to carry
out the PM, failing to which penalty is levied.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Other Terms & condition of contract:
01 During any strike if contractor fails to make alternative arrangement for carrying out the
work, then the amount for generation loss and/or cost of the work carried out by the
department will be recovered from the contractor as per Corp.’s rules.
02 Contractor’s has to report to EE (C/R) as well as Engineer-in-charge of maintenance in the
beginning of every shift to take instruction from him if any for smooth running of the plant.
The contractor’s has to work in synchrony with the EE (C/R) as well as the in-charge
Engineer of the maintenance Department. The technical decision for maintenance works
are to be taken in consultation with the concern E.E. The supervisor of the contractor shall
remain present at mill area so that he can be contacted immediately. The supervisor of
the contractor shall not leave place of work under contract perform the administrative &
managerial control over his staff. The supervisor must be qualified and able to exercise
control over the staff.
03 Essence of this work order is that all mills should be always kept available by carrying out
preventive and breakdown maintenance in consultation with EE (C/R) and/or Engineer-in-
charge. Mills should be maintained in healthy-intact condition. If defect is found/booked
in running mill, it should be attended immediately. Generation loss shall be deducted from
party’s bill for not attending defects timely.
04 (i) The party should maintain minimum staff (Category - wise) round the clock for this Work
to come up emergency work without loss of generation.
(ii) The party has to submit daily progress report at 8:15 AM of next day, if fail Rs.200/-,
per day will be deducted from bill. Moreover presence & O.T. details shift wise also
submitted to the concern S.E or section head.
(iii) The persons engaged for the one work MUST NOT are utilized elsewhere for other
work if entrusted to same party /contractor at the same time. If the simultaneous utilization
of same staff is noticed then proportionate amount with penalty deemed fit will be deducted
from party’s bill.
05 Contractor’s supervisor must make himself available at all area so as to enable operation
staff to contact immediately. Supervisor will not leave working place without informing EE
(C/R)/Engineer-in-charge.
06 Contractor has to repair/attend any punctures as well as coupling joint leakage of mills of
Unit Nos. 6 i.e. leakage from mill body. Multipart outlet with coupling joint, MDV assembly
straight pipe piece with coupling joints, mill outlet elbow and mill discharge pipe up to
burner immediately round the clock as per instruction of E.I.C. as part of this contract. The
scope of leak sealing work shall be up to burner first bend.
07 During AOH / COH of Units or in short shutdown of units contractor have to replace worn
out / punctured coal discharge pipe, coal mill suction pipes & PF bends as per the
instruction of GSECL Engineer-In-Charge in the quoted rate only.
08 During AOH / COH contractor will have to replaced worn out pipes – bends, MDV, MPO,
Ventury etc. as above if no such work is undertaken / involved payment against this i.e.
item 02 of schedule-B will not be given such list of replacements shall be given to party
with time limit.
09 During short shutdown of unit for attending hot/cold air duct leakage, expansion bellow air
leakage, contractor has to remove duct/bellows insulation for attending duct leakage &
refitting of same after completion of work. Necessary insulation will be provided by GSECL
free of cost. Binding wire, screws etc. to be arrange by the party.
10 Contractor has to repair/replace damaged instrument air line/service air line, isolating
valves at mill area & RC feeder area.
11 Contractor has to provide “ELCB” switch on his every welding machine for safety point of
12 Crane/forklift facility for heavy material shifting shall be provided by GSECL (if available
13 Workshop facility for machining, repairing – feasible in Ukai TPS workshop shall be
provided free of cost.
14 If any immovable articles / tools / equipment will be found stolen from the working place,
the contractor would be held responsible and cost will be recovered from his bill.
15 The contractor has to carry out the complete leak sealing of coal pipes right up to boiler.
burner, over & above the work specified in condition as per the technical/General terms &
conditions attached in Annexure as part of this contract without any extra cost.
16 During AOH/COH of unit’s contractor have to dismantle the mill outlet elbows of respective
unit as per the instruction of GSECL E.I.C. If any minor repairing is required by special
welding electrodes then GSECL will supply the same free of cost & the work involved will
be carried out by the contractor without any extra cost. Minor repairing of mill discharge
valve assembly and multiport assembly shall be carried out by the contractor in the quoted
rates. Necessary repairing special type welding rods shall be supplied by GSECL free of
17 Any dispute arise regarding any problem towards contract labours work engaged by the
contractor, the decision of the CHIEF ENGINEER, Ukai TPS will be solely bound and will
have to obey the instructions and decision taken by CHIEF ENGINEER (GEN.) as the
18 Contractor has to submit the binding of their labours that nobody will approach to any Court
of Law for any dispute raised by any labour union/Association for their payment such as
Gratuity, Bonus, C.P.F. Pension insurance, items for safety payment of wages and labour
escalation under any labour laws applicable to them & contractor has to issue appointment
letter to their workers engaged for the work with a copy to C.E. (Gen.) Ukai TPS and with
the agreement on valid stamp papers with himself and condition that he has appointed the
workers with the specific period for engagement on work. Contractor has to carry out the
work on terms and conditions for exigency of work and as and when asked for to work at
19 The party shall have to issue identity card with photographs to their personal engaged for
which will be the jobs endorsed by GSECL authority for temporary entry in TPS site with a
prior permission of the concern E.I.C.
20 The party shall have to maintain ‘PAKKA’ record for the attendance/overtime and pay bill
of their staff engaged for every work separately and to be got checked through
LWO/Section as & when it is ask for.
21 SPECIAL CLAUSE: You have to engage the separate required personnel for this contract
as and when required during shutdown period with the approval of competent authority &
record to be maintained regarding their presence and actual payment made. Further, on
completion of this contract the labour engaged for this job shall be retrenched and shall
not be engaged on other running contract.
22 Payment shall be made through monthly R.A. bills after recording & submit the certificate
duly certified by LWO/IRO/DGM, that contractor has complied with the provision of all labor
laws applicable time to time.
23 Necessary electronic media for communication should provide to Supervisor/Site Incharge
for communication and he should be in contact with GSECL representatives round the
24 Party must provide PPE to contractor such as Safety Shoes, Helmet, Rain coat, Gumboot,
Uniforms etc required to work at site.
25 The amount of security Deposit will be refunded after the satisfactory completion of the
contract after certification by the concerned Superintending Engineer and after deducting
any dues of the GSECL.
26 To sublet of to transfer the contract without prior approval of the GSECL shall be treated,
as breach of contract and it shall be forfeiting the SD as well as termination of contract.
27 The GSECL reserve the right to forfeit the SD in case of any breach of contract and in
dispute. The decision of Chief Engineer, Ukai TPS shall be final, binding acceptable to the
contractor. If the contractor fails to start the work as stipulated, the EMD and the SD shall
28 Submission of the bill by the contractor:
Bills shall be submitted by the contractor for each month on or before the date fixed by the
site –in-charge, for all works, executed in the previous month and the site-in-charge shall
take or cause to be taken the requisite measurement for the purpose or having the same
verified and the claim so far as it is admissible, shall be adjusted, if possible, within ten
days from the presentation of the bills. If the contractor does not submit the bill, within the
time fixed, as aforesaid, the site-in-charge may depute a subordinate to measure up the
said work in the measurement list shall be sufficient warrant and the site-in-charge may
prepare a bill from such list which shall be binding on the contractor in all respect.
Along with the R.A. Bill, the contractor should submit material Account wherever
applicable, proof of payment of provident fund and other statutory dues, certificate issued
by IRO/Labour Welfare Officer certifying average number of labours deployed during the
month and total amount of wages and salaries paid to labours .The R.A. Bills along with
month and total amount of wages and salaries paid to labours .The R.A. Bills along with
the supporting documents will be paid within 30 Days.
29. Income Tax: Income tax will be deducted at source from each bill as per statutory
30. The GSECL will be entitled to deduct directly from the bills to be paid to the contractor
any sum or sums payable the contractor and which sum / sums the GSECL is required to
pay as a principal employer on account of contractor’s default in respect of all liabilities
referred to in above clauses.
31 (a) No Sales tax, Professional tax or any other taxes, cess or levy, excise duty, Octroi,
royalty or other duties will be payable by the GSECL against this contract.
32 The TDS @ 2% as per Sections 57A and 57B of GST Act shall be deducted from the
contractor’s bills.
33 Contractor to Indemnify the GSECL: The contractor shall indemnify and keep indemnified
the Corporation and every member, officer and employees of the Corporation, including
Engineer-in-Charge and his staff, against all actions, proceedings, claims, demands, costs
and expenses whatsoever arising out for in connection with the matters referred in above
clauses and elsewhere and against all actions, claims, demands, costs and expenses
which may be made against the Corporation, by any workman/employee of the contractor
or sub-contractor or any other person under any laws, rules or regulations having the force
of law, including, but not limited to, claims against the owner under Workmen’s
Compensation Act, 1970. The Corporation shall not be liable for or in respect of or in
consequence of any accident or injury to any workman or other person in the employment
of the contractor. The contractor shall indemnify and keep indemnified the Corporation
against all such damages and compensation and against all claims, demands, proceeding
costs, charges and expenses whatsoever in respect thereof or in relation thereto. The
contractor shall also indemnify Corporation in all respect against any liability due to breach
of legal provisions contained in any of the Labour Laws.
The Contractor shall also indemnify Corporation for injury or damage to third party other
than employees of the Corporation, contractor or sub-contractor.
34. In case of breakdown maintenance or in case of extra ordinary emergency situation,
contractor shall arrange to mobilize requisite additional labour force at short notice to meet
with such emergency situation over and above their normal routine staff without any extra
payment by GSECL. If contractor fails to carry out required emergency work in time
stipulated by EIC or if it is felt that adequate labour/skilled technicians are not employed
by contractor, then GSECL will recover the appropriate amount proportionate to nature of
work & cost involved.
The party shall have to submit daily progress report, presence and OT details shift wise
to the concern section.
35. Because of this contract, the GSECL shall not accept any additional labour liabilities than
36. The contractor will make arrangements at his own cost to insure all men, materials and
equipment employed for this work. The GSECL will not be responsible for any loss or
damage either to the contractor’s personnel or his equipment.
37. Dispute, if any, taking place between the contractor and labour must be intimated to
Labour Welfare Officer, Ukai TPS, immediately.
38. The contractor must insure all the labour before starting the works.
39. Compensation for the Delay:
The time allowed for carrying out the work as entered in the tender shall be strictly
observed by the contractor and shall be reckoned from the date on which the order to
commence work is given to the contractor. The work shall throughout the stipulated period
of contract be proceeded with all due diligence (time being deemed to be the essence of
contract) and the contractor shall pay, as compensation, an amount equal to one percent
or such smaller amounts, as the Competent Authority (whose decision in writing shall be
final) may decide of the amount of the contracted cost of whole work as shown by the
tender for every day that the work remains uncommented or unfinished after the proper
Provided always that the total amount of compensation, to be paid under the provisions of
Provided always that the total amount of compensation, to be paid under the provisions of
the clause, shall not exceed 10 percent of the contracted cost (cost with GST) of the work
as shown in tender.
40. Any casualty will also have to be borne by the contractor for the period the contract
41. The contractor shall not engage any sub contractor without written price permission of the
chief Engineer of the authorized office of the GSECL. In no case the GSECL will be liable
in any manner regarding any liability in respect of any contract Labour engage by the sub
contractor ant the liability of such contract Labour will solely rest with the principle
42. The contractor shall deploy with the adequate number of experienced staff at site for daily
supervision and for maintenance of various registers and records required under the law
and contract. No payment by the GSECL for supervision shall be admissible.
43. Staff Discipline: - It is the responsibility of the contractor to ensure that his employees
maintain strict discipline as regards security, methods of safe working etc. and not to cause
any hindrance to smooth running of power station or in execution of duties by GSECL staff.
Any lapse in this regard will be viewed seriously and contract is liable to terminated. If any
of his staff is found unsuitable or not behaving properly, the contractor shall have to remove
him the worksite on demanded by GSECL. The contractor shall have to strictly observe
the rules and conditions specified in the enclosed works contract booklet of the GSECL,
which are not modified hereunder. To keep harmonious Industrial Relations amongst
contract Labour is the sole responsibility of the contractor. Any breach of the same will be
viewed seriously.
44. The GSECL reserve the right to terminate this contract at any time during its currency
without giving notice of termination or any reason thereof.
45. In case of default, the work will be got done through other agency/agencies at the risk and
cost of the original contractor, and the GSECL shall be entitled to recover such expenses
from defaulting contractor by such methods as deemed fit. The contractor shall not,
however, be entitled to terminate the contract or stop works undertaken by him before
expiry of the contract period/extended period due to any reason whatsoever.
46. Under the contract, the contractor should either himself be present at the site or should
nominate person I writing, who must be available at the site and who should be authorized
to take decision about the works and receive the instructions from Engineer-in-Charge of
the work at any time. In absence of any responsible man of contractor at the time of any
emergency, adhoc decision of Site-In-Charge will be binding on the contractor.
47. The contractor is bound to execute the work for any item as per the instruction of the Site-
In-Charge. On refusal to do so, the work will be carried out at the risk and cost of contractor
by using the contractor’s tools and tackles, for which no compensation whatsoever shall
be payable to the contractor.
48. If any immovable articles/tools/equipment will be found stolen from the working place, the
contractor would be held responsible and cost will be recovered for his bill.
49. For any contract and ambiguity, the decision of the Chief Engineer shall be final and
binding on the contractor.
50. The contractor, if desired, can see the plant and site on any working day and during
working hours with permission of the Chief Engineer.
51. Conditional tender is liable to be rejected withdrawal or insertion of conditions unilaterally
after opening of tenders will not be permitted unless it is so desired by the GSECL.
52. Chief Engineer, UKAI TPS reserve the right to reject any of all tenders without assigning
any reasons thereof.
53. Before staring the work, the contractor should contract Industrial Relation Officer/Labour
Welfare Officer for all formalities and obtaining the gate passes of his Labours and for
other formalities.
54. Office correspondence will be carried out in English language, and if at any time to facilitate
the contractor , Gujarati translation may be furnished, if deemed fit. The English version
will be the correct one and the same only will held good for legal matters.
55. The contractor should intimate to the office the name and address of authorized
representative, so that our field officer can contact them when required in connection with
the execution of the said works.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
SCHEDULE – B (PRICE BID)
Do not submit this Schedule - B in hard copy
Name of Work: The work of online, preventive and breakdown maintenance of coal mills XRP-1003
and its associated auxiliaries of 500 MW unit No.6 of GSECL Ukai TPS. (BMD-6)
Tender No. : WT-5286
Sr. RATE AMOUNT
DESCRIPTION UNIT QTY
Work for online preventive and breakdown maintenance
work coal mill feeder Seal air Fan and associated auxiliaries
Months 3 1148786
1 system and other related coal mill work at 1x500 MW Unit-6
Service Charges for online preventive and breakdown
2 maintenance work coal mill feeder Seal air Fan and
associated auxiliaries system and other related coal mill Months 3 79390
work at 1x500 MW Unit-6 of UTPS.
Providing consumables for work of on line, preventive and
breakdown maintenance work of coal mills, gravimetric
feeder, seal air fan and associated auxiliaries / system and 3
other related coal mill work at 1 x 500 MW unit nos. 6 of
Providing tractor as and when required basis for material
shifting for work of on line, preventive and breakdown
4 maintenance work of coal mills, gravimetric feeder, seal air 21
fan and associated auxiliaries / system and other related
coal mill work at 1 x 500 MW unit nos. 6 of Ukai TPS.
Providing Hydra as and when required basis for material
shifting for work of on line, preventive and breakdown
5 maintenance work of coal mills, gravimetric feeder, seal air Per Hrs. 45
fan and associated auxiliaries / system and other related
coal mill work at 1 x 500 MW unit nos. 6 of Ukai TPS.
Total Estimate Rs.
(Thirty Eight Lakhs Seventy Eight Thousand Three Hundred Thirty Four only) plus applicable taxes
1. Party will have to make the payment of all statutory liabilities to their workers including benefit
of retrenchment (if applicable) on completion of contract and to submit duly authenticated copies
of documentary evidence to HR Dept. as a part of statutory compliance thereof.
2. The payment shall be made for actual work carried out to suit the site condition only.
3. (a) For item Sr.no.3 the bidder has to submit documentary evidence of purchase of
consumables items for execution of above subjected works to claim the amount actually
received and utilized per month R.A. Bill (i.e. Entry pass / challan / PAKKA Invoice) duly sign
and stamped at security Main gate of Ukai TPS. The daily report submitted should be clearly
mentioned for utilization of the received consumables area wise. The welding rods must be Bob
shell/Diffusion/D&H/Advani/L&T/ESAB make only. Party has to give evidence of used material
before issue new material to storekeeper of Dept. The daily report submitted should be Cleary
mentioned for utilization of the received consumables area wise. The same should be
summarized and submitted along with R.A.Bill claim. For the consumable items amount will be
reimbursed as per prevailing/justified rates.No extra payment will be made against amount
exceeding the tender amount as per item sr.no 3 of schedule B.
4. For item Sr.No.04 & 05 the evidences for hiring of Tractor/Hydra by providing challan dully
signed and stamped should be submitted along with the invoice. Using of own Tractor/Hydra
will be as per the actual Hrs work required only as per the EIC. Payment for item sr. no. 4 &
will be paid on actual basis after verification and joint measurement.
5. The rates are exclusive of GST; however the same shall be paid extra in accordance with
applicable GST rules “GST applicable towards forfeiting of EMD, Security deposited and PBG
and charging of penalty including liquidated damages in accordance with the T&C of the contract
shall be in the scope of contractor / supplier.
6. The rates are exclusive of GST (For item Sr. Nos. 1, 2, 4 ,5) at prevailing rate, if applicable will
be paid by GSECL, extra on production of paid evidence/Challan. Further for item sr.no.3 the
rates are inclusive of GST & all taxes and duties as mentioned in Invoice submitted during Bill.
GST and other taxes will not be applicable on item sr. no.
7. The Bidder should have to quote against for item sr.no. 2 only of Schedule “B” considering
all aspects of contracts while Schedule- B Item sr.no.1, 3, 4, 5 , rates and amount are fixed
hence bidders have not to be quote. The higher-Lower rate is applicable on schedule-B item
sr.no.2 only. Evaluation will be carried out on offered total field of Schedule B (i.e. TOTAL end
cost of items from Sr. No. 1 to 5).
8. Payment of hardship cum attendance bonus and labour payment (item no.1) and its
service charges (item no.2) will be made as per actual work done, bio metric payment
submitted by GSECL TK office only i.e. on pro rate basis of actual items of schedule B.
9. HSN code and GST Number is must in every invoice.
10. In case of any dispute the decision of the undersigned will be final & binding to the contractor.
11. The quantities shown are approximate and for 3 months, it may vary widely. No claim shall be
entertained on account of partly operating of above items. Payment will be given on the base of
actual execution of work.
12. Contractor has to maintain sufficient manpower on daily basis as per the requirement of
the work. Contractor have to employ and monitor total 41 Numbers of labor per day (
Skilled -9, Semiskilled-9, Unskilled -23).
13. The time limit for completion of this contract works awarded is 3 months from commencement
of work. The G.S.E.C.L can extend contract for further period of 3 months after expiry of time
limit without consent of party, if desired by the G.S.E.C.L., at the same rate, terms & conditions
of awarded order of this tender and quantity will be enhanced accordingly proportionately if
14. GST at prevailing rate will be paid by GSECL if the same will be claimed in invoice/Bill only.
15. TDS and TCS will be applicable as per income tax and GST act.
16. GST No. & SAC Code must be required in Bill/Invoice.
17. For registration in GSECL's VENDOR MANAGEMENT SYSYTEM (VMS)
https://vms.guvnl.com, vendor is required to submit details of PAN, GST, official email ID for
receiving OTP, bank details, and any other information as required.
a. After successful registration, the vendor will receive a VMS link, along with a login ID and
password, to process invoices.
b. Vendor must upload invoice of subjected work in VMS portal to process payment.
c. The SOPs for New Vendor Registration and Invoice Submission are available at the link above.
My/Our offer is ______________ % Higher or________________ % Lower than the
Estimate Cost. (Percentage should be written in figure as well as in words).
Remark: L1 is considered on over all lowest quoted party for all items i.e. Sr. No. 1 to
(Inclusive of all taxes & duties).
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
GENERAL TERMS & CONDITION OF CONTRACT
Name of work: The work of online, preventive and breakdown maintenance of coal mills
XRP-1003 and its associated auxiliaries of 500 MW unit No.6 of GSECL
Ukai TPS. (BMD-6)
1. The ‘contract’ means the documents forming tender and the subsequent agreement that
may be entered into.
2. The general rules & regulations of the GSECL for tender and contract for works will apply
to the extent the same are not modified herein any other rules & regulations, conditions
etc. are in force at present and that, any be framed by the GSECL from time to time in
connection with contracts will be binding & acceptable to the contractor.
3. The whole contract shall not be assigned to any other agency or any individual in any
circumstances. Violation of this leads to cancellation of contract by GSECL.
4. The contractor shall hold the GSECL indemnified and in respect of any claims arising out
of injury to any persons, loss of life, workman’s compensation or any other claims
whatsoever. The contractor shall be responsible for any damages to any property of the
GSECL due to negligence of the contractor or his employees. The GSECL will be entitled
to recover from the contractor and it shall be final and binding to the contactor.
5. GOODS AND SERVICE TAX (GST) :
The prices are excluding GST and Cess as applicable which will be paid extra on a given
taxable goods and/or services within the original contractual delivery period. The amount
of GST and Cess as applicable should clearly be indicated separately. (GST/Cess means
all applicable Tax/Cess under GST Laws. GST Laws means IGST Act,
GST(Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act and
SGSCT Act, 2017and all related ancillary legislations).
You shall have to submit a C.A Certificate& duly authorized Signatory of successful
bidder, certifying that you have not claimed Refund of any applicable GST and Cess,
charged to GSECL or shall not claim any such Refund, on a future date, from the
concerned Authorities and if, any Refund, in respect of such GST and Cess, is claimed
by you, it will be immediately passed on to the GSECL, without GSECL making any
specific Claim, for the same, either from the Department or from you.
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate
of GST and Cess is not mentioned clearly unless the bidder has opted for Composition
Scheme under GST Act, which should be clearly indicated in the price bid. GSECL may
at its discretion consider such offer with presumption of highest applicable rate of
GST/Cess prevailing when the price quoted is inclusive of GST and Cess.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must
be clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate mentioned in the price bid shall be final and any additional GST will
have to be borne by the tenderer. In no case additional amount towards tax or otherwise
will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause will not
be applicable in case of Supplier / Contractor has opted for Composition Scheme under
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned
in acceptance of tender only and any deviation in the same shall not be accepted.
Further, any additional liability of GST (later on due to wrong mentioning of GST rate,
misinterpretation of HSN/SAC Code, etc.) over and above as charged in the invoice shall
be borne by the Supplier/Contractor. However, any refund received by the supplier /
contractor on account of GST charged from the GSECL; such refund shall have to be
passed on to the GSECL, along with interest if any. Such refund along with interest needs
to be passed on suo-moto by the supplier / contractor.
Further, the GSECL has a right to recover the amount of GST along with penal interest
at the rate of 15% per annum if GST charged is not paid / short paid to the government
or fail to upload the details or uploads inaccurate particulars on GSTIN portal by the
Supplier / Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the
provision of GUVNL’s statutory variation clause shall apply.
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to
inclusion of any other additional item of their inputs / input services under the ambit of
the Input Tax Credit provisions under the GST Act, subsequent to the date of submission
of the offer, the same should be passed on to GSECL and you should inform such
changes to GSECL from time to time.
6. Please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned then GSECL will
have the option to take the prices as exclusive of taxes and duties at maximum higher
slab rates for the evaluation of the tenders.
7. STATUTORY VARIATION:
Any statutory increase or decrease in the taxes and duties including GST and Cess as
applicable or in the event of introduction of new tax/cess or cessation of existing tax/Cess
subsequent to suppliers offer if it takes place within the original contractual delivery date
will be to GSECL’s account subject to the claim being supported by documentary
evidence. However, if any decrease takes place after the contractual delivery date, the
advantage will have to be passed on to GSECL.
Statutory Variation clause shall not be applicable in case of Supplier / Contractor has
opted for Composition Scheme under GST.
8. Time Limit : The time limit for completion of this contract works, if awarded,
is 3 months . The GSECL can extend contract for further period of 3 month
after expiry of time limit without consent of the party with same rate terms &
conditions. if desired by the GSECL, and quantity will be enhanced
proportionately.
9. AGREEMENT: As per Corporation’s rules, the successful contractor will have to enter in
to an agreement with the Corporation on stamp paper of appropriate value Rs. 300/- in
the prescribed form within one month of receipt of this A.T. or before starting the work.
The cost of the stamp fee shall be borne by you. The tender with the specification, price
schedule, drawing and the contract booklet are to be signed by you. This letter and
subsequent correspondence shall be deemed to be part of the Contract.
10. Dispute Resolution Mechanism :
(1). Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or
relating to this contract with reference to the construction, interpretation, breach,
termination or validity thereof (hereinafter referred as "the Dispute") shall, upon the
written request of either Party be referred to the authorized representatives of the
Disputing Parties for resolution. The authorized representatives shall promptly meet
and attempt to negotiate in good faith a resolution of the Dispute within thirty days of
the service of the request.
(2). Arbitration
If the Parties fail to amicably resolve the disputes or differences or contrary claims as
indicated herewith in sub clause (1) of Clause 10, arising under or in connection with
the present works contracts, whether pertaining to works contracts alone or works and
procurement both, the same shall be referred to arbitration under the Gujarat Public
Works Contracts Disputes Arbitration Tribunal Act,
11. You will have to strictly observe all the Labour Laws and Factory Acts in existence &
amendments made from time to time.
12. You shall have to strictly observe all Safety rules as per the Factories Act, 1948 and
whatever amendments made from time to time to avoid any chances of accident.
Contractor shall have to strictly follow the instructions of Safety Officer.
13. The contractor will observe all safety measures for his working persons. The Contractor
will be responsible for his working personnel for any injuries or mishap caused/occurred
to them during the execution of above work. GSECL will not pay any compensation in
such case to Contractor’s persons. However in the event of any accident or emergency,
GSECL will provide First Aid /Regular Medical Treatment on chargeable basis.
14. The contractor will also be responsible for any damages caused to the GSECL property
by his Personnel during the execution of above work. In such cases, the contractor will
arrange to repair/rectify or will pay such amount to GSECL as may be decided by the
competent authority of GSECL.
15. Standard safety practices and standard engineering methods shall be adopted for the
works. All the safety tools and personal protection equipments shall be provided to
personnel by the contractor.
16. GSECL Ukai TPS is situated in Gujarat, all the rules and regulation regarding labour
laws, safety laws etc. of Gujarat Government if amended shall be applicable for the said
17. In case of any incidence occurred in the plant premises i.e. fatal/ non-fatal accident, the
contractor has full liability for accident.
18. The contractor has to produce copy of labour license before starting of work if applicable.
He should produce/ comply with all labour laws of Gujarat government in force and he
should have to submit the PF code.
19. Canteen facility will be available at prevailing rate available to GSECL’s employees.
20. Workshop facility will be provided at free of cost if required.
21. First aid facility will be provided as per GSECL prevailing rules.
22. Quantity shown in work order is approximate, liable to change. Payment will be made
according to actual work done only.
23. The contractor shall have to submit the bill in triplicate along with all necessary
documents in the prescribed Performa as directed by EIC and payment will be made as
per rules within 30 days after receipt of a RA bill.
24. Contract price are fixed for entire contract period and no any price escalation admissible.
However taxes will be paid at actual on submission of paid evidence.
25. No idle charges shall be entertained by GSECL for any site conditions or any
26. All the activities records are to be maintained by the contractor as per documentation
formats issued by GSECL maintaining records in standard formats are necessary for
27. Party shall submit daily progress report for the work carried out by them.
28. The contractor, if desires, can see the plant and site of work with permission of
undersigned on any working day during working hours.
29. Income Tax will be deducted at source at prevailing rates as per I.T. Act.
30. GSECL reserve right to stop the work contract at any time and no payment will be paid
to contractor for the same.
31. If any dispute arises during execution of the work, the decision of Chief Engineer, GSECL
Ukai shall be final & acceptable and binding to contractor.
32. OH & S Management system requirement:
It is to be noted that GSECL, Ukai TPS is establishing and implementing Occupational
Health & Safety Management System complying with OHSAS 18001:2007.
You as a part of the GSECL Ukai team and as defined by the scope of mentioned
standard, all contractors are required to comply with and participate to prevent the
occupational health and safety hazards and risks including observation of safety rules.
Further you are also to comply with all applicable legal requirements while executing the
work, in case the job is assigned to you.”
33. All payment to contract Labourers shall be disbursed through Bank only.
34. Bonus Payment shall be made to contract Labourers as per Bonus Act.
Note: Engineer in Charge of the subjected work is Mr. Parimal S. Kayasth (Executive
Engineer, BMD-6) - Mobile no:
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
TERMS AND CONDITIONS REGARDING LABOUR LAWS
During the entire period of the contract, the Contractor and his Sub- Contractors shall at all times
comply with all applicable labour laws, rules, regulations, notifications, and bye-laws issued by the
Central Government, State Government, or Local Authorities. This includes all existing laws as well
as any amendments or new notifications that may come into force during the contract period.
The Contractor and his Sub-Contractors shall, at all times abide by the following Acts/Statutes related
to Human Resources:
1. Factories Act, 1948;
2. Contract Labour (Regulation & Abolition) Act, 1970;
3. EPF & MP Act, 1952;
4. Building & Other Construction Workers (Regulation of Employment & Conditions of Service)
5. ESI Act, 1948;
6. Minimum Wages Act, 1948;
7. Payment of Wages Act, 1936;
8. Payment of Bonus Act, 1965;
9. Payment of Gratuity Act, 1972;
10. Workmen's Compensation Act, 1923;
12. Maternity Benefit Act, 1961;
13. Inter-State Migrant Workmen (Regulation of Employment & Conditions of Service) Act, 1979;
14. The Building And Other Construction Workers' Welfare Cess Act,
15. The Carriage by Road Act,
The above list is only indicative and not exhaustive. The Contractor shall remain fully responsible for
ensuring compliance with all other applicable labour and welfare legislations, rules, and regulations in
force during the contract.
The following are some of the major responsibilities of the contractor, in addition to other obligations
prescribed under various labour laws, rules, and regulations issued by statutory authorities such as the
State Government or Government of India from time to time, which the contractor shall strictly comply
with during the execution of the contract.
1. The Factories Act,
The contractor should not deploy worker below the age of 18 years and above 60 years for the
Earn Leave shall be paid to their bonafide contract workers as per the provisions of the Factories
Payment of Earned Leave should be made monthly together with wages for better compliance of
law. The contractor shall maintain Earn Leave Register in Form No. 19 as per the provisions of
the said Act and submit the same on demand.
All the written registers, Performa etc. shall be maintained up to date and kept ready for inspection
at any time or submitted on-time to the concerned authorities as per applicability of the Acts by
2. The Contract Labour (Regulation and Abolition) Act,
The Contractor / Agency shall have to obtain the Labour License under Contract Labour
(Regulation & Abolition) Act from the appropriate authorities before commencement of work. The
contractor shall maintain a valid labour license under the Contract Labour
(Regulation and Abolition) Act for employing necessary man power to be required by contractor.
The contractor should not be allowed to engage fifty (50) or more contract labourers without
initiating to obtain the labour license under the Contract Labour Act. (The said number i.e., fifty
(50) or more includes Supervisor and other staff).
3. Minimum Wages Act,
Contractor shall have to make the payment of wages to the Contract Labours engaged by them, on
or before 7th of every month through nearest Nationalized Bank compulsory, preferably situated
in the premises of TPS area in case of all works contract. The Contractor shall supply copy of Bank
Statement duly stamped by the Concerned Bank as well as debited entry of amount displayed in
the contractors' own bank account as token of proof towards payment of Wages through
CLIM/prevailing system at relevant time.
Apart from Payment of wages through Bank, Contractors shall have to make all other payments
like Advances, Bonus, Leave Encashment etc. to their labours through bank only and cash
payment/entry will not be allowed.
Wages rates for contract labourers are applicable as per the terms and conditions of the license.
The contractor shall have to pay wages to workers as notified by the Government of Gujarat from
Any default to pay the minimum wages to the engaged workers and deprived of their right to
minimum wages payment on or before 7th of each month shall be dealt as per the provision of
labour laws. Recurrence of the same may lead to cancellation of awarded contract.
4. The Provident Fund and Miscellaneous Provisions Act,
The contractor must possess separate P.F. code on the name of the Firm /Agency /Company itself
for the subject work.
It should be ensured that all the contract labours engaged by contractor are covered under the
provident fund scheme and employee's pension scheme and their contribution must be remitted
regularly to the concerned RPFC. The photocopies of challan along with ECR in this regards
should be submitted regularly to the User Department to enable their onward billing clearance.
The contractor shall submit along with his bill (month wise) statement regarding deductions against
employees' provident fund and family pension scheme in respect of each concerned employee.
Provident fund and family pension scheme at the rate of 12 % of wages (or at the rates made
applicable by the Government time to time). The contractor's contribution and his workers
contribution towards provident fund and family pension scheme shall deposited by the contractor
with concerned PF Authorities.
5. Workmen's Compensation & Employer's Liability Insurance.
The contractors shall have to obtain Employee Compensation Policy under the Employees
Compensation Act before starting the work. Employee Compensation Insurance shall be obtained
for all the workers engaged for the execution of awarded contract. If any of the work is sub-letted,
the contractor shall ensure that the sub- contractor take and provide workmen's compensation and
Employer's liability insurance for the labours engaged. Contractor is liable to pay compensation in
case of accidental injury arising out of and in the course of employment as per the said Act and
shall bear medical expenses due to on duty accident.
6. The Payment of Gratuity Act,
For better compliance, contractor shall pay amount of gratuity on a monthly basis along with the
payment of wages, calculated on a pro-rata basis per month, which is equivalent to 15 days' wages
for each completed year of service for every worker. (* applicable to ARC / BRC works contract
7. The Payment of Bonus Act,
Every worker shall be entitled to be paid by the contractor in an accounting year, bonus, in
accordance with the provisions of this Act, For better compliance, the contractor should pay bonus
amount on a monthly basis along with wages calculated on a pro-rata basis per month. Contractor
has to submit the paid bonus details of its worker in Form No. C as per the provisions of the said
Act as and when required by the Govt. Authority as well as by GSECL.
8. The Maternity Benefit Act,
Contractor shall ensure provide Maternity Leave and other benefits as per the provision of the said
9. The Building and other Construction Workers' Act,
For any construction work, fall under the definition of Section 2(1)(d), happening outside / inside
the Factory premises the said act will be applicable and the contractor or its sub-contractor shall
be liable to comply with the provisions framed there under.
10. The contractor shall give preference to existing or local contract workers for engagement in the
awarded contract and shall issue appointment orders to each and every workers individually at the
time of their engagement during the period of contract and terminate the same at the end of the
Follow the mentioned procedure at each milestone for the execution of works contract.
11. On Commencement of Contractual Work
1. Before starting the work, the contractor may contact Labour Welfare Officer / Industrial
Relations Officer for all formalities related to labour law compliance before commencement
of the contract and onward Labour Law compliance thereof, so that later no dispute will arise
in respect of compliance of labour laws.
2. It is the responsibility of the contractor to ensure that contractor's employees maintain strict
discipline as regards security, methods of safe working etc, and not to cause any hindrance to
smooth running of power station or in execution of duties by GSECL staff. Any lapse in this
regard will be viewed seriously and if lapse found, contract is liable to be terminated. If any
of contractor's staff is found unsuitable or not behaving properly, the contractor shall have to
remove such worker from the work-site on demand by EIC. To maintain harmonious industrial
relations amongst contract labours is solely the responsibility of contractor. Any breach of the
same will be viewed seriously.
3. A digital system developed at the request of the agencies working at the premises of GSECL,
is to facilitate them for easy, efficient, effective management of data, gate passes, attendances,
medical records, Police Verification documents etc related to their employees / workers
deployed for various works and services against work order of GSECL.
4. On receipt of LOA and before commencement of work, authorized representatives of the
agency shall login in the CLIMS online portal / prevailing system at relevant time and apply
for registration of their employees / workers uploading all information with required
documents in digital form. Upon completion of due verifications, clearance by EIC and HR
departments, contracting agency will obtain gate passes. GSECL will only consider
documents like wage sheet duly accepted and signed by individual workers, as per the
engagement/deployment duration/hours of individual worker duly certified by the agency,
being the employer, for the purpose of payment of bills and HR clearances. Agency shall be
solely responsible for maintaining accurate and up- to-date data of their workers in the portal/
prevailing system at relevant time. All statutory compliances under prevailing laws shall
remain the responsibility of the contracting agency. The agency shall indemnify GSECL
against any liabilities arising from non- compliance of legal provisions or inaccuracies in the
data maintained by them in the digital portal of CLIMS/prevailing system at relevant time.
5. The Contractor who intends to engage labours more than the specified limit under law, then
necessary - Form No. V under the Contract Labour (R& A) Act, 1970 or Form No. VI under
the Interstate Migrant worker (employment regulation) Act 1979 as applicable is to be
obtained for the purpose of obtaining Labour License from the Licensing Authority.
6. It shall be the duty of the Contractor or his Supervisor to ensure Bio-Metric punching and
reporting at the location of work.
7. The contractor shall employ adequate number of experienced staff at site for daily supervision
and for maintaining of various registers and records required under the Labour laws and
contracts. No payment for such supervision shall be admissible.
8. The gate passes obtained for any specific work order will be valid for that specific work order
only and contractor should not divert the man power for any other work order. If any work or
part thereof is desired/required to sublet, the contractor shall obtain the necessary permission
of EIC in black and white well in advance which is mandatory for considering the statutory
documents of agency other than the agency who awarded work order.
12. During Contractual Work under the progress:
1. All Contractors shall have to make the payment of wages to the Contract Labours engaged by
them, on or before 7th of every Bank preferably situated in the premises of power station area.
The Contractor shall supply copy of Bank Statement duly stamped by the Concerned Bank as
a token of proof towards payment of Wages through CLIMS / prevailing system at relevant
2. All Contractors has to comply & maintain statutory documents registers under the provision
of labour laws & EPF Act.
3. In case the contractor having more than one contract in the same TPS, the contractor shall
have to obtain work order wise separate Gate Passes and submit the same with the documents
of statutory compliance that too work order wise every month to the User Department to
enable their onward billing clearance.
13. CONTRACTOR TO INDEMNIFY THE GSECL REGARDING LABOUR LAWS
The contractor shall indemnify and keep indemnified the GSECL, and every member, officer and
employees of the GSECL, also Engineer-in-charge and his staff against all actions, proceedings,
claims, demands, costs and expenses whatsoever arising out of or in connection with the matter
referred in above clauses and elsewhere and against all actions, claims demands, cost and expenses
which may be made against the GSECL by any workman/ employees of contractor or any sub-
contractor and or from any liability any wise to any workman/employees of the contractor or sub-
contractor under any laws, rules or regulation having in force of law including but not limited to
claims against the owner under employee compensation Act, 1923. The Employee's Provident
Fund Act.1952, and/or the contract labour (Abolition and Regulation) Act,
The GSECL shall not be liable for or in respect of or in consequence of any accident or injury to
any workmen or other person in the employment of the contractor or his sub-contractor, and the
contractor shall indemnify and keep indemnified the GSECL against all such damage and
compensation and against all claims, demands proceedings costs, charges and expenses
whatsoever in respect of or in relation thereto.
The contractor shall at his own expense / risk and cost to comply with all the labour laws as above-
mentioned and keep the G.S.E.C.L. indemnified in respect thereof.
GSECL : shall be entitled / empowered to deduct directly from the bills, the amount to be paid to
engaged bonafide contract workers or the contract workers engaged by Sub-contractor; any sum
or sums payable by main contractor / sub-contractor and which sum/sums the Corporation is
required to pay in capacity of Principal Employer on account of the default of contractor in respect
of all liabilities incurred out of non- compliance regarding any provisions of Labour Laws and
same amount shall be recovered from the pending dues of the contractor with 15% administrative
Any other rules and regulation, conditions, circulars etc., that are in force at present and that may
be framed by the GSECL from time to time in connection with contracts will be binding and
acceptable to contractor.
The above are some of the major liabilities of the contractor in addition to other liabilities
prescribed under the various labour laws in force from time to time from Statutory Authorities like
State Government, Government of India, which the contractor shall have to comply with.
The contractor shall provide the name of authorized representative, as provided to other statutory
Government authorities and will be notified to Engineer In-Charge time to time.
14. Submission of Statutory documents to ensure the compliances:
The contractor shall upload statutory documents, work order-wise, under Labour Laws and EPF
in CLIMS / prevailing system at relevant time.
Required documents shall be uploaded by the contractor in existing portal /prevailing system at
relevant time invariably each month to Engineer In-Charge for onward process and smooth
clearance by HR Department.
List of documents required for gate passes of contract workers through clims /prevailing system
Sr. No. Description of documents attached
1 Copy of Work Order
2 Copy of P. F. Code No.
3 insurance Policy as per subject of work order under the
Workmen Compensation Act,l923
4 Contract agreements/ subletting work contract documents with
5 Copy of Id proof of Aadhar card or Election voting card or
driving license or Passport only
6 Copy of Police Verification in respect of each contract workers
15. The contractor whose work order value is above Rs. 5 lacs shall have to submit "Declaration cum
Indemnity Bond" on Rs. 300/- Non-Judicial stamp paper in prescribed Performa (Annexure- "B")
with Agreement and Indemnity Bond before the commencement of the contract.
Terms & condition for Reimbursement against Health check up of Labour :
1. For procedure for Health cheak-up accordingly Bill shall be reimbursed once during total
contract period (for as & when and AOH/COH contract) maximum up to Rs. 1000 or actual cost
per worker/labour/person, whichever is minimum after verification & recommendation by
concern doctor. In case any worker left the work in between than for replacement Worker
Company will not provide any reimbursement, however it is compulsory to submit new reports
of replacement worker for Fitness certificate at contractor's own expenses.
a) X-ray Chest (PA) view in 14x17 inch plate with reporting by qualified Radiologist.
(Maximum up to Rs.300/- Per Worker once during contract period).
b) Pulmonary function Test (Maximum up to Rs.200/- per worker once during contract
c) Eudiometry in Sound proof cabin with reporting by qualified audiologist. (Maximum Up to
Rs. 200/- Per Worker once during contract period).
d) Random blood sugar report, Complete Blood Count & Urine R/M (Maximum Upto Rs.
200/- Per Worker once during contract period).
e) Clinical examination & consultation charge for qualified doctor having minimum MBBS
with CIH/AFIH degree for issuing fitness certificate (Maximum Up to Rs. 100/- Per Worker
once during contract period).
2. For Periodic Medial examination, No reimbursement for periodic medical examination to be
given to contract employee for whom GSECL are conducting Periodic Medial examination at
company's cost at TPS level. If contractor fails to undergo periodic medical examination, they
have to undergo prescribed investigation as per hazard analysis from outside. No reimbursement
to be given for these investigations.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
DECLARATION CUM INDEMNITY BOND
(On Rs.300/- Non Judicial Stamp Paper duly notarised)
THIS DECLARATION CUM INDEMNITY BOND made at……………………. (mention location)
by M/S………………………………….having its reg. office at
…………………………(hereinafter)………referred to as "Contractor" which expression shall unless
it be repugnant to the context or meaning thereof, be deemed to mean and include their respective
assigns, successors, executors, subcontractors and / or administrators) of the ONE PART in favour of
M/S. Gujarat State Electricity Corporation Limited having its power Station at……………. Thermal
Power Station…(hereinafter………….…………..referred to as the "Company" ), which expression
shall unless it be repugnant to the context or meaning thereof be deemed to mean and include its assigns,
successors) of the OTHER PART.
WHEREAS the COMPANY has entered into a contract with the Contractor for the work of' "
………………………………………under order No:…………………..dtd:…………. here in after
called the "Contract")
AND WHEREAS it is one of the essential conditions of the Contract that the Contractor shall comply
with all the provisions of the Labour & Industrial Laws, as may be applicable from time to time for the
discharge and completion of the works and completion of the Works and Services covered under said
Contract Labour (R & A) Act 1970,Child Labour (Prohibition and Regulation) Act 1986,The
Employees Provident Funds & Miscellaneous Provisions Act, 1952,Employees State Insurance Act
1948 Minimum Wages Act,1948,Payment Act,1965,Payment of Wages Act,1936, Employees
Compensation Act.1923, Factories Act,1948 and other Labour Laws, Rules, Notifications and Codes
which are at present applicable to the contractor and which may be applicable during the tenure of the
contract (hereinafter referred as the 'Laws').
AND WHEREAS the Contractor has agreed to execute this Declaration cum Indemnity Bond to this
effect and has agreed to indemnify and Company, its Directors, Officers and employees and
representatives indemnified and hold harmless against all third party claims, charges, penalties, fines,
expenses, losses, damages costs, suits or any other levy against the Company and/or the management
due to the failure of the Contractor to observe or follow all applicable laws.
NOW THIS DEED WITNESSETH AS UNDER
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct and lapse, delays,
misdeeds, faults, breaches, inactions etc. done by his assigns, successors, executors,
subcontractor and / or administrators shall be construed to be have been done by the contractor
and he alone shall be liable for such acts, inactions etc.
2. In consideration of the Company awarding the Contract to the Contractor subject to the condition
of execution of this Declaration cum Indemnity bond, the Contractor declares and represents to
the Company that the Contractor has obtained all Statutory registrations, Certificates, licenses
and approvals required under the Laws enabling the Contractor to execute the Contract in a legal
and lawful manner.
3. That in the event of any liability arising out of non-compliance of any 'Laws' of the land by the
Contractor in connection with the Performance of the contract, the Contractor shall bear all the
resultant liability (ies) whatsoever, if any and that the company, its Directors, Officers and
employees, representatives, shall not be liable for any such liability(ies). The Contractor
undertakes to indemnify and keep the Company and its Directors, Officers and employees,
representatives indemnifies, defend and hold harmless, against all losses, costs, damages, claims,
penalties, interest, expenses, demands, fines, legal liability, causes of action, injury to persons,
suits etc., which may be suffered, incurred, undergone and / sustained by the Company including
the Costs and expenses that may be incurred in defending any such liability(ies) claim(S),
Proceeding (S) etc. that maybe made or taken or taken or arise on the same by any Person, body,
authority, government, judicial / quasi - judicial authority due to the failure or non-compliance
of any such laws and rules there under (including any amendments in acts, laws, statutes & rules
there under) of whatsoever kind and nature arising out of or in any way connected with, whether
or not such acts or omissions are actual or alleged, active or passive with regard to the discharge
of the said Contract.
4. The Contractor further declares that in case of any suit / claim / right / damages / compensation /
fine / levy / charges / expenses / losses / penalties / costs raised by the third party, including
contract labours engaged by the contractor, he shall join such proceedings in such
Suit/Court/Tribunal/Authority and effectively defend the same.
5. The Contractor hereby agree and undertakes to make good any loss, damage, claims, suits,
demands, decrees, expenses that the Company may suffer to the fullest satisfaction of the
Company and if the Contractor fails to make good the same then the Company shall have the
right to recover the same from and or any other loss sustained, without any restriction or
limitation, together with any other incidental expenses, costs, and all incidental logistic expenses
etc that may be suffered by the Company from the Contractor and the Contractor hereby further
confirms and declares that this Declaration cum Indemnity Bond is irrevocable and shall be final
and binding on him, his heirs, executors, administrators, legal representatives, successors,
subcontractors and assigns, wherever the context applies. any claims, demands, shall be adjusted
against any amount due and payable to the Contractor and the Company shall have the right to
withhold any amounts due and payable to the Contractor, till the settlement of such claims,
disputes to the Contractor towards discharge of such claims, obligations etc.
6. This Declaration cum indemnity bond shall be in accordance with the laws of India and any
dispute between the parties with regard to this Declaration cum Indemnity Bond shall be resolved
through the dispute resolution process mentioned in the General Conditions of the Contract
IN WITNESS WHEREOF, the said Contractor has hereunto set their hand the day and year first
hereinabove written.
SIGNED SEALED AND DELIVERED By the within named
(Authorised Signatory)
Rubber Stamp of Firm/Company
In presence of Witness,
Name & Address of Witness Signature
Residential Address :
Residential Address :
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
“GENERAL SAFETY RULES / NORMS”
TO BE OBSERVED BY THE CONTRACTOR
All the contractors working in Gujarat State Electricity Corporation Limited Factory like
Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the following Safety Rules.
Concern principal contractors are responsible for informing & observance of these rules by their
supervisors/contract workers as well as the owner/supervisors/ workers of sub-Contractors engaged,
if any, by them for the work contract awarded to them. Prior to commencement of the work,
Contractor shall have to submit a written assurance on their letterhead to the concerned Sectional
Head / Engineer-in-charge that they have thoroughly gone through these Rules, have educated their
employees / workers of their subcontractor and will strictly observe the said Rules while execution of
work under work contract awarded to them. They will have to indemnify the company for any loss or
damage / accident / injury to the company’s property / employee or employee of their own in default
of non - observing these rules.
(01) Contractor should issue photo gate pass for their workers from GSECL Factory Manager as per
Gujarat Factories rules, 1963 & details shall be filled up in GSECL gate pass format as per
Aadhar card /Election card id proof & to follow the gate pass issue procedure through concern
department EE & SE, Security Officer, LWO/IRO/DGM, Factory Medical Officer, Safety
Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer only for
three days with prior permission of Factory Manager only. More than three days, Permanent
photo gate pass procedure shall be completed by contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33 of Gujarat
Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for all contractor
workers before commencement of work & examination responsibility shall be taken by
contractor as well as concerned Head of Department. Pre-employment & Periodical medical
examination of contractor workers shall be carried out in form no.32 from GSECL Factory
Medical Officer after every six (06) months of contractor with their contractor workers.
Contractor shall be fulfilled all health requirements before commencement of work. After
completion of medical examination in form no.32/33, GSECL Factory Medical Officer shall be
signed in contract worker gate pass procedure format.
(04) Contract worker gate pass will issue after completion of safety induction 3D animation movie
& Training record is to be maintained in IMS/OHSAS training format by TK Office/LWO.
(05) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked the issue
PPE to contract workers as per nature of job, Form no.10 of lifting tools and tackles, Driving
license, Electrical contractor license, Electrical trade qualifications, Safety induction training,
SOP, supervisor qualifications etc. After fulfillment of all Safety compliances, Safety
Officer/Dy. Safety Officer shall be signed in Contract worker Gate pass procedure format.
(06) Work Contract shall be completed by principal contractor/agency/person who is awarded the
work order. Subletting of contract shall be allowed only if prior approval of Power station chief
before execution of work. Contractor/agency shall be submitted the entire subletting contract
documents with gate pass application through concern department EE & SE, LWO/DGM,
Safety Officer/ Dy. Safety Officer & Factory Manager.
(07) Under the Conditions framed under Rule-45 of the Indian Electricity Rules, 1956, Valid
Electrical contractor License shall be submitted to concern electrical department
EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the time of apply gate pass
by agency/party with latest renewal from Chief Electrical Inspector, Gandhinagar- Gujarat.
Electrical License photocopy shall be checked by Concerned HOD of Electrical
Department/Electrical Safety Officer/Dy. Safety Officer/ Safety Officer/Factory Manager.
(08) As per nature of job/work, qualified supervisor (Diploma (Electrical/ Mechanical/Civil
/C&I) + 3 years experiences or ITI + 10 years) shall be engaged by contract agency &
qualification certificate with experience certificate shall be submitted to concern
EE/SE/LWO/IRO/DGM/ Dy. Safety Officer /Safety Officer/Factory Manager at the time of
apply gate pass.
(09) As per rule 3 of CEA regulation, 2010: Designating person(s) to operate and carry out the
work on electrical lines and Apparatus, Contract person/worker possesses a certificate of
competency or electrical work permit, issued by the Appropriate Government. That means,
Electrical trade Qualification of contract worker/person like ITI-wireman/ Electrician, Diploma
(Elect), BE/B. TECH (Elect), ME/ M. TECH (Elect) shall be submitted to concern
EE/SE/LWO/IRO/DGM, Dy. Safety Officer/ Safety Officer/Factory Manager at the time of
apply for photo gate pass procedure.
(10) As per nature of job/work & during capital overhauling work /Annual overhauling work /24X7
round the clock work/major shut down work, Qualified Safety Officer/Manager/Supervisor
(BE/Diploma (Elect/Mech./Civil) + PDIS-Post Diploma in Industrial Safety) shall be engaged
by contractor during dangerous operations/dangerous works as well as day to day dangerous
activities, safety supervision, tool box talk, Safety awareness programs, SOP preparation with
hazards & its control measures with each step , checking of lifting tools & tackles, hydra mobile
crane, Safety precautions, coordination with Safety Department etc.
(11) License of driver shall be submitted with gate pass issue application as per nature of vehicles &
to follow the Motor vehicle Act, 1988, the Central Motor Vehicles (Amendment) Rules, 2016 as
well as Gujarat Motor Vehicles rules, 1989 & driver license shall be checked every day by
security shift in charge before entry in the Factory premises.
(12) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent person
as per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with 05 years experiences. SOP
will review & approve by concern JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety
Officer/Factory Manager before execution of work.
(13) It is compulsory to use standard make Personal Protective Equipment (P.P.Es.) as per the job
requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide
standard make (ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE issue
format by concern JE/DE/EE/SE/Safety Officer/Factory Manager. Personal Protective
Equipment / Safety Gadgets suitable to give sufficient protection against hazards involved in
their work / job to their staff, as per the job requirement and insist / enforce their workers to put
on the same while at works.
Party has to submit PPE under taking in attached annexure. During technical scrutiny of work
tender, undertaking for PPEs shall be checked by Safety officer and if PPEs mention in tender
are not as per standard Safety Officer & Factory Manager shall disqualify bidder technically.
The ongoing work is liable to be stopped at any time if your contract workers/staffs found
working without P.P.Es. Following is the list of various P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI
approved only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety Shoes, Safety
Helmet, Safety goggles, Mask & Reusable Ear plug to their workers/supervisor compulsory & it
will check by concern section HOD & Dy. Safety Officer /Safety Officer at the time of gate pass
List of safety equipment :
Industrial Safety Helmet For protection of head against falling objects or during fall of person
from height. Yellow Colour helmet is used for contract worker
with agency logo.
Safety Goggles/ welding goggles/ For protection of eyes against flying particles / dust, chemical
chemical splash goggles splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust, chemical splash,
spark, arc, flashover etc.
Reusable Earplug / Ear muffs. For ear / hearing system protection while working in high noise level
Chemical suit/Gas tight suit /Fire For body protection against chemicals, oils, sharp edged objects,
proximity suit/FR Boiler Suit heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils, sharp edged objects,
heat, hot metals/objects, electricity etc.
Safety shoes/ Gum Boots with For protection of leg/feet against falling objects, sharp edged
Oil/Chemical/water/heat/Electrical objects, heat, hot metals/objects, electricity etc.
resistance etc.
Safety Belt (full body hardness For fall prevention while working at heights or in depth, working in
with double lanyard & shock vessel or in confined space.
absorber) / Rope / Life line / Fall
Dust Mask/Respirator with valve Protection of respiratory system against dust.
Chemical Cartridge Respirator Protection against toxic chemical fumes / gases/vapors/dust etc.
with full face mask type
Trolley mounted Airline respirators Working in oxygen deficient zone or confine space area
with full face mask
Portable Single gas detector like Working in hazardous storage/process area
Chlorine, Ammonia, Hydrogen,
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of confine space &
(LEL, O2, CO, H2S, SO2 etc.) Major fire
Automatic voltage detector To check the present voltage or induction voltage of electrical
equipment/ bus/switch gears from 01 (one) feet distance before
starting the any electrical work.
Auto darkening welding helmet The new auto darkening welding helmet combines legendary Speed
(EN 379 & EN 175 Level-B) with glass quality and auto darkening technology with an innovative
PAPR as per EN 12941:1998, class wide-view grinding visor to give welders an all-in-one solution for
TH2 and AS/NZS 1716 more flexibility, precision, and efficiency.
Respiratory System is a combined face and breathing protection
device, for increased comfort and safety in welding. The unit is
equipped with a particle filter which removes particles from the air.
The unit provides a constant airflow independent of filter
combinations and clogging. The unit can also be equipped with a gas
filter (for example A1B1E1). The unit supplies air to the head top
via the connecting breathing tube. The airflow creates a slight
positive pressure which together with the sealing to the face prevents
particles and other contaminants from entering the head top.
(14) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) should be issued by party/agency
/contractor to their contractor workers as per nature of job and allotment of PPE list shall be
submitted to Safety Officer on his letter head as per below mentioned format by Contractor
before commencement of work through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Name of Agency:
Date of Commencement:
Time limit for work order:
Name of IS : Recei
Sr. Design Section Code ving
of Name of PPE e of Qty. Unit of
no. ation under work no. of signat
workers PPE issue
execution PPE ure
01 Safety Helmet Nos.
Safety goggles Nos.
Reusable Ear Plug Pair
Safety Shoes Pair
(15) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet of all
contractor workers at entry gate of Factory Premises & shall entered contractor workers with
Safety Shoes & Safety Helmet with photo ID Gate Pass.
(16) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all contractor
workers on daily basis.
(17) During the work execution, one trained & competent supervisor of agency should always remain
present at work site. Concern JE/DE of GSECL shall be supervised the contract work as per
(18) Approved NABL laboratory calibration certificates of electrical/mechanical/Civil
/C&I/Environment survey/Chemical etc. measuring /testing equipment/instruments which are
used during contract work shall be submitted before starting the work & shall be checked by
concern JE/DE/EE before starting work & it’s record shall be maintained in concern section.
(19) The contractor shall take all the required safety measures prior to commencement of work on
dangerous substances, machineries or area at which cautionary notice is displayed and obtain
“Line Clear” or “Work Permit” through the concern Department / Section JE/DE and shall be
informed to concern section JE/DE for closed/ returned after completion of work.
(20) Safety talk/Safety work instructions shall be given to contractor workers by concern JE/DE
regarding hazards of specific work, risk & its control measure (mentioned in HIRA) before
starting the job work and records shall be maintained for each & every job works.
(21) Display Safety instructions shall be strictly followed by all workers who are working in factory
(22) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief
Chemist/Control room & work related Chemical information shall be taken by contractor &
contractor workers from Concern EE/Chief Chemist before starting of chemical handling work.
(23) The contractor shall be checked & securely covered or securely fenced any opened fixed vessel,
sump, tank, pit or opening in ground or in floor which, by reason of its depth, situation,
construction or contents, is or may be a source of danger before starting the work each & every
days or after interval/recess. Contractor supervisor shall be informed to concerned HOD
regarding any unsafe conditions.
(24) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses, mobile
phone etc. are to be strictly followed by all workers who are working in factory premises.
(25) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, remove all
the inflammable material lying at or nearby worksite or cover it properly by suitable protective
covering. Also, special care shall be taken before carrying out such job & see that all possible
contributing factors to set fire shall be removed / vanished prior to commencement of the work.
Advance intimation shall be given to concerned section / fire section to commence the work in
fire prone areas. They should also keep ready all the First Aid Fire Extinguishers / equipment &
fire extinguishing media / material like sand / water buckets or other appropriate equipment at
(26) While carrying out work in confined space or inside vessel, obtain necessary “Confined Space
/ Vessel Entry Permit” from concerned department prior to commencement of the work. For
lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be used.
For taking care of the persons working inside the confined space / vessel, a supervisor / person
capable to keep continuous watch on person(s) working inside, assist them in case of emergency
or arrange to get immediate outside help, shall remain present at entry point. Use full body safety
belt without failed. While working inside sewage, trench or in-depth, a person to warn outsiders
/ entrants / passers etc shall remain available near entry point or the entry point shall be cordoned
by a barricaded tape with a cautionary notice. After completion of the works, all the lids / covers
/ grills / grits opened, shall be re-fixed / re-placed in the original position as it were prior to
commencement of the work and leave the work place in safe condition in all respect, so as to
prevent accident to fellow workers.
(27) The contractor shall see that he / his persons do not work on or block (by stacking material, spare
parts, tools-tackles, equipment etc.), any passages / walkways / gangways / aisles / staircases /
ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on which there
is traffic movements or possible traffic movements in case of emergency. Such passages are
meant for safe escape in the event of emergency. If it is utmost necessary to carry out work in
such area with blocking of passage, prior permission of Competent Authority or the Engineer-
In-Charge shall be obtained. To demarcate / declare the area as “UNSAFE”, cordon it using
barricading tape & display suitable caution notice or keep a person to restrict / divert the traffic
on this route through other safe passage.
(28) Prior to use power / electrically operated hand tools / equipment / machines / gadgets like welding
machine, hand grinder, hand drill etc. ensure for its safe operation & use it only if it is found safe
to use. Do not use defective, unsafe or improperly maintained equipment.
The electrical power supply required to run such equipment shall not be taken directly at their
own but shall be obtained through concerned Electrical Maintenance Departments or their
authorized persons or under their observations / guidance only. The Electrical Section shall
provide temporary electrical connection up to contractor’s Mains Board on which it is
compulsory to install mains switch, ELCB & fuses of adequate capacity. All such equipment
shall invariably be earthed adequately to prevent electrical shock, sparking, short circuit etc.
Power cord to be used shall be of adequate capacity, without any joint & shall consist of earth
wire also. Hence, it is necessary to use adequate capacity 3-wire power cord for single & 5-wire
power cord for three phase power connections. The plugs, receptacles, pins, holders etc. shall be
of adequate capacity & safe to use.
All electrical & mechanical equipment / tools-tackles viz. welding machine, cutting machine,
Grinder, Drill, Chain Pulley Blocks, Hook chooks etc. required to be used during work execution
shall be of standard make & bear ISI certification mark on it.
The consumables like welding electrodes, grinding wheels / discs etc. which has specific
prescribed life span shall not be used in any case if its expiry date is over.
(29) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by Electrical
contractor for safe use in areas where hazardous, flammable, or combustible vapors, liquids,
dusts, or residues may be present in Gas Based power plant and list of tools and tackles shall be
submitted with technical bid. Non-Sparking Non-Magnetic electrical hand tools and tool kits
shall be checked by JE/DE before commencement of Electrical work.
(30) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane,
EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures),
it shall be checked and used only if found safe to use. Also, ensure that these are tested, examined
& certified in form no.10 by Competent Person as per the Factory act-1948 & Gujarat Factories
Rules and its validity do not expire. Further, it shall be fixed properly and firmly prior to lifting
the weight. Valid Test certificate of all Lifting machines used by Contractor to be submitted
to Dy. Safety Officer/ Safety Officer before commencement of work through concerned
(31) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain
the work permit when working at height. While climbing on such scaffolding or working on any
structure at height, use of full body safety belt /full body hardness with double lanyard & fall
arrestor & Helmet is compulsory. It is also necessary to fasten chinstraps of the helmet.
(32) Contractor or their employee shall not interfere in day-to-day routine plant activities / works
except the work assigned to them, shall not loiter in the areas other than their work jurisdiction,
as well as shall not temper / operate / touch the machineries/equipment/auxiliaries with which
they are not concerned. Also, the contractor shall strictly instruct their staff for not to sit or take
rest at/near/below running plants, auxiliaries, systems or any place which is risky, hazardous &
prone to accident.
(33) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen,
Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled safely taking due care.
To handle / shift such cylinders a special trolley /cage meant for it must be used but in no case,
it should be rolled.
(34) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour generated area,
Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall be provided on each
vehicle by party/agency and it will check by shift security in charge before entry of vehicles in
the factory premises.
(35) No women or young person shall be employed or permitted to work in Lead-compound area like
battery room etc. as per schedule VI of GFR
(36) No women or young person shall be allowed to clean, lubricate or adjust any part of a prime
mover or of any transmission machinery while the prime mover or transmission machinery is in
motion. Examination or operation of motion machinery shall be made or carried out only by a
specially trained adult male worker wearing tight fitting clothing as per section 22 of factories
(37) In all risky job, before start the work, contractor should obtain General Safety Work Permit
through concerned section from Shift –in-charge well in advance.
(38) In case of noticing smoke or fire during their work execution, they shall make immediate efforts
to extinguish / control it and simultaneously inform the Fire Station Mobile No as well as Station
Fire Officer or Emergency Control room no which is displayed at prominent place of factory like
Main Security Gate, All unit control room, Canteen area, Safe Assembly points, Fire Station, All
security gates, Occupational Health Centre.
(39) In case of any injury / accident while working, it shall immediately be reported to Safety
Department through concerned Sectional Head / Engineer. The prescribed Form No. 21 &
ANNEXURE may be obtained from concerned section or Dy. Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety Officer
through concern Sectional Head / Engineer. The prescribed Electrical accident form no. A as
per electricity act-2003 & Form No. 21 & ANNEXURE as per Gujarat Factories rules shall
be filled up by concern department JE/DE with written consent of contractor. The Form may be
obtained from concerned Electrical section or Electrical Safety Officer. Electrical accident
investigation shall be carried out by Electrical Safety Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness certificate of injured
person with endorsement of GSECL factory Medical Officer to LWO/Dy. Safety Officer/Safety
Officer/Electrical Safety Officer then after injured person may allow for work.
(40) For any incident occurred but have no injury to any persons should also reported as per GSECL
format and informed to Dy. Safety Officer/Safety Officer as Near Miss Incident.
(41) Safety penalty shall be imposed against Offences by contract workers: If any contract worker
worked in a factory contravenes any provision of Factories act or any rules or orders made there
under, imposing any duty or liability on workers, contractor/agency shall be punishable with fine
which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per
(ii) Work without work Safety permit like working at height, confine space Rs.1000/- per
entry, hot work etc. day
(iii) License of driver as per type of vehicles not registered. Rs.750/- per
(iv) Welding work without flashback arrestor/double gauge regulator set Rs.1000/- per
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature of job like mechanical, Rs.1000/-per
electrical, civil, C&I, chemical etc. day
(vii) Work without SOP & JSA Rs.2000/-per
(viii) Work without test report of lifting machines / tackles (like C.P.Bs., Hook Rs.2000/- per
chooks, winch, forklift, mobile crane, EOT crane etc.) & its attachments equipment
(like D-shackles, slings, U-clamps, Eye bolts or any fixtures) in Form
No.10 of Gujarat Factories Rules,1963
(ix) Work without Double lynyer Safety belt during working at Height work, Rs.3000/-per
work without anchoring in hook/line person
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per
(xi) (a)Grinding machine used without safety guard/machine guard. Rs.500/- per
(b)Unsafe welding machine like open body, knob without insulation, equipment /per
connection without lug. set
(c) Damaged welding cables / gas pipelines.
(d) Welding work doing without welding blanket.
(e) Electrical supply without 3 pin plug/ industrial plug.
(f) Use of damaged electrical wires for lighting /equipment.
(g) Use of lighting lamp without cage.
(h)Use of open halogen tube.
(i)Use of damaged PPEs/ nonstandard PPEs.
(j)Unsafe lifting and handling of gas cylinders.
(k)Cylinder handling without cap.
(l)Temporary connection without ELCB etc.
During plant visit / supervision of concern JE/DE/EE, SE, Dy. Safety Officer/Safety Officer,
Electrical Safety Officer, Factory Manager, If they will observed any safety violations as per CO
circular/statutory requirements then they must impose Safety Penalty through office note directly
against contract workers /contract agency and office note process through proper channel to
concern Sectional Head and Account head for recovery purpose. Photograph/CCTV camera
footage is to be put up with penalty note by imposing officer.
(42) Party will damage any fire equipment or property or machinery in factory during execution of
work, total damage cost will be recovered from party RA bill and recovery Office note put up
by concern HOD.
(43) All the relevant labour and industrial laws shall also be followed compulsorily.
(44) After completion of work, cotton waste, grease, oil, unused material, welding rod pieces, scrap
etc. are to be removed by contractor and scrap shall be deposited to scrap yard of Main Store.
(45) For performance evaluation of contractor, safety factors of work accident, fire incident & near
miss accident will be considered. Steps can be taken to review the job assignment up to
cancellation for negligence.
(46) Over & above these, contractor shall have to follow all the safety requirements /rules &
regulations / norms and legal provisions laid down in various statutes. Particularly the provisions
of The Factories Act-1948 & the Gujarat State Factories Rules-1963 (Amended up to date), The
Electricity Act-2003 & rules, BOCW Act/Rules shall be followed strictly. The contractor shall
also obey the rules / regulations / instructions of the local Competent Authority for safety &
health requirements.
(47) The above rules shall be scrupulously followed and where required, Contractor /contractor
workers may contact to the Dy. Safety Officer/Safety Officer/Electrical Safety Officer in case
of any ambiguity or needs further guidance in this regard.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL: UKAI: TPS
On Firm’s Letter Head
Tender No./RFQ No.:
CERTIFICATE – ‘A’
I/We __________________________________________________authorized signatory of
M/s ___________________________________ is not related with other firm who has
submitted tenders for the same items under this inquiry / Tender.
Seal of the Firm Signature of the tenderer
Place: with Designation.
On Firm’s Letter Head
Tender No. /RFQ No.:
CERTIFICATE – ‘B’
(Declaration regarding Relationship with employee)
I/we hereby declare that information provided in regards to service in GSECL & its associated
company is true as per my best knowledge. My/our relatives by is true as per my information.
Also I/we know that for providing wrong/False information we may be disqualified from the bid
& EMD paid by me may be forfeited.
1) My/Our Firm and its partner is solely independent i.e. My/our nearest relative,
son/father/Mother/ daughter/ wife/ brother in law/sister in law/father in law is not in Service of
GSECL & it’s associated other company.
2) If in service then please furnish the detail. Stating Name, Designation along with service
location & relation with the bidder.
Seal of the Firm Signature of the Tenderer
Place: With Designation
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
INTEGRITY PACT DATE:
To create an environment where Business Confidence is built through Best Business Practice
and is fostered in an atmosphere of trust and respect between providers of goods and services
and their users for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical standards in Not to bring pressure recommendations from
business and professions. outside GSECL to influence its decision.
Ensure maximum transparency to the satisfaction of Not to use intimidation, threat, inducement or
stakeholders. pressure of any kind on GSECL or any of its
employees under any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in fulfilling the
agreement/contract and to consider objectively contract, agreement, legal obligations.
the view point of parties.
To ensure regular and timely release of payment To provide goods and/or services timely as per
on due dates for work done. agreed quality and specifications at minimum
To ensure that no improper demand is made by To abide by the general discipline to be
employees or by anyone on our behalf. maintained in our dealings.
To give maximum possible assistance to all the To be true and honest in furnishing
vendors/Supplier/Service Provider and other to information.
enable them to complete the contract in time.
To provide all information to suppliers/ Not to divulge any information, business
contractors relating to contract/job which details available during the course of business
facilitate him to complete the contract/job relationship to others without the written
successfully in time. consent of GSECL.
To ensure minimum hurdles to Not to enter into carter/ syndicate/
vendors/suppliers/contractors in completion of understanding whether formal/non-
agreement/contract/work order. Formal so as to influence the price.
Seal & Signature Seal & Signature
(GSECL Authorized Signatory) (Party’s Authorized Person)
DEVIATIONS FROM THE TECHNICAL & COMMERCIAL SPECIFICATIONS
(To be furnished with Techno-commercial bid)
Sr. Clause No. of Tender Brief matter Scope acceptable
No. Specification of the clause to tenderer
The undersigned is a duly authorized representative of the Bidder & certifies that all the
furnished data & information pertaining to this offer are correct & are true representation
of the equipment & material offered by our offer no._____________________, dated
The undersigned confirms that the offered plant has been designed to achieve the required
performance as per the desired parameter & guarantee to achieve the same.
SEAL OF THE TENDERER SIGNATURE OF TENDERER'S
AUTHORISED REPRESENTATIVE
BIDDERS EXPERIENCE LIST
(To be furnished with Techno-commercial bid)
Order No. Schedule Actual Whether
Location/Postal Amount
and Date , d Complet performa
Sr. Name of address with of Order,
(photocopy completi ion nce
No. Work Phone No. and Period of
to be on period certificate
Email address Order
attached), period & Year attached
1) Tenderer may also furnish the above details for ongoing projects.
2) Separate details/documents are also to be furnished to establish the Qualification requirements.
SEAL OF THE TENDERER SIGNATURE OF TENDERER'S
AUTHORISED REPRESENTATIVE
SCHEDULE OF GENERAL INFORMATION AND COMPLETION PERIOD
(To be furnished with Techno-commercial bid)
A.01 Name and address of bidder
(a) E-mail address
A.02 Name and address of the person to whom all
references shall be made to expedite technical
(a) E-mail address
A.03 Is the firm proprietary, Private or Limited
Name of the partners
Name of the authorized signatory
A.04 Offer No. and date
A.05 Is tender valid for 180 days from the date of
opening of Technical bid?
A.06 Is the bidder agreeable to undertake this
contract, if deviations stipulated by him are
not acceptable to the purchaser?
A.07 Has the bidder paid EMD as per tender
A.08 Is the bidder agreeable to furnish the security
deposit cum performance guarantee as per
tender requirement?
A.09 (a) Are quoted price firm during execution of
(b) Have prices been quoted firm and FOR
(c) Is price break-up given in price bid as per
format of the tender?
A.10 Is the bidder agreeable to the terms of
payment specified in tender?
If not, has bidder indicted deviated payment
terms in technical bid?
A.11 (a) Does the bidder agree to the completion
period as per the tender?
(b) Are the completion period guaranteed with
penalty as per tender?
(c) Are equipment’s guaranteed as per various
guarantee clauses of tender documents?
A.12 (a) Has the bidder brought out all deviations
with justifications in schedule of deviations?
(b) Are all the schedules filled in?
A.13 Place of manufacture
A.14 Service facilities
A.15 Availability of spare parts
A.16 Has the bidder submitted all the documents
for qualification requirement as per tender?
A.17 Completion period for Delivery and E&C
(a) FOR site delivery period from the date of
issue of LOI / Order
(b) Is FOR site delivery period guaranteed
with specified penalties?
(c) Period of erection, testing and
commissioning of Public Address system
(d) Is period of erection, testing and
commissioning guaranteed with specified
A.18 HSN/SAC Code and GST % of your offer for
Name of the firm:
Signature of bidder:
Seal of Company:
Name of bidder:
COMPULSORY UNDERTAKING OF BIDDER REGARDING QUALITY OF PPEs
(PERSONNEL PROTECTIVE EQUIPMENTS)
Ref: Tender No.___________________
Authorized signatory of M/s
Hereby certify that following mention PPEs must be issued to our all contractor workers as per
nature of hazards before execution of work.
Safety Helmet: MSA, 3M, Karam, Udyogi, Saviour, Venus make only.
Safety Shoes: - Any ISI approved brand.
Dust Mask: - Any ISI approved FFP2/FFP3 dust mask with exhalation valve.
Safety Goggles:-Any ISI/DGMS/CE/EN/ANSI approved “zero power” safety goggles
Reusable Ear Plug: Any ISI/DGMS/CE/EN/ANSI approved Reusable Ear Plug.
Full Body Harness: Any ISI/DGMS/CE/EN/ANSI approved with double lanyard.
Sr. Name of PPE Standard Make of Qty Unit
No. Code of PPE PPE
01 Safety Helmet
02 Safety Shoes
03 Safety Goggles
04 Reusable Ear Plug
06 Full body Harness
If our company will not provide above mentioned PPEs, Safety Officer and Factory Manager
shall be empowered to stop the work without any notice.
Seal of the Firm Signature of Authorized signatory
Note: - During technical scrutiny of work tender, Undertaking for PPEs shall be checked by
Safety officer and if PPEs mention in tender are not as per standard Safety Officer & Factory
Manager shall disqualify bidder technically.
Signature & Seal of Tenderer
On Firm’s Letter Head.
Tender No. /RFQ No.:
UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
All bidders will have to furnish the following undertaking duly filled in, signed and stamped for each
quoted item of the tender along with the Technical Bid.
signatory of M/s _____________________________________________________ here by certify that
M/s ___________________________________________________ and their proprietor / any partner /
any directors of the firm is not stop deal and / or banned for business dealing and / or black listed by
GUVNL and / or their any subsidiary company viz. GSECL / GETCO / DGVCL / MGVCL / UGVCL /
Signature & Seal of the Tenderer
On Firm’s Letter Head.
Tender No. /RFQ No.:
CONSENT FOR OBTAINING CONTRACT LABOUR LICENSE.
I / We ______________________________________________authorized signatory of
that M/s.___________________________________________ will obtain contract
labour license from the appropriate authorities for throughout the work contract and
submit same to GSECL.
Signature of the Tenderer with designation
Seal of the Firm/company
On Firm’s Letter Head.
Tender No. /RFQ No
CONSENT FOR OBTAINING WORKMEN COMPENSATION POLICY.
I / We __________________________________________________authorized signatory of
Compensation Policy of all the contract labours duly engaged throughout the work contract and
submit same to GSECL .
Signature of the Tenderer with designation
Seal of the Firm/company
LIST OF TOOL/TACKLES/EQUIPMENTS/MACHINES ETC.
(To be furnished with technical commercial bid to carry out subject work)
On Firm’s Letter Head.
Tender No. /RFQ No
Sr. No. Name of Tool/tackles/Equipment/Machines etc Qty. Remarks
Signature of the Tenderer with designation
Seal of the Firm/company
On Firm’s Letter Head.
Name of the work:
Tender No/ RFQ No: WT- _______/ _______
DECLARATION IN RESPECT OF CONFLICT OF INTEREST
We hereby certify that our firm M/S. _________________ do not have any conflict of interest
with other bidders for particular quoted items/rates viz.___________________.
We hereby declare and confirm that the above information and particulars are true and correct.
Signature of the Tenderer with designation
Seal of the Firm/company
On Firm’s Letter Head.
Name of the work:
Tender No/ RFQ No: WT- _______/ _______
DECLARATION IN RESPECT OF PRICE PREFERENCE CLAUSE –
(LOCAL CONTENT: VERIFICATION)
We hereby certify that our firm, M/s __________________, has carefully read the price
preference clause and has fulfilled the required details along with the Technical Bid.
We further declare and confirm that the above information and particulars are true and correct.
Signature of the Tenderer with designation
Seal of the Firm/company
On Firm’s Letter Head.
(UNDERTAKING IN REGARD TO QUOTED PRICE)
(All bidders will have to furnish the following undertaking duly filled in, for all the quoted
items/works of the tender along with online Technical Bid)
Ref .: Tender No. . / Gem Bid. No.
We, the undersigned, hereby declare and undertake that we have not accepted or executed any
Letter of Intent (LOI) / Letter of acceptance (LOA) or Work Order (WO) at a unit ex-works
price/any work at rate lower than the rate offered in this tender in any station of GSECL/GUVNL
& Subsidiaries/ CPSU/SPSU/IPP etc. during the period from six (6) months prior to two (2)
months after the bid submission date of this tender.
We also understand that LOI/LOA or Work Order (WO) placed by any station of
GSECL/GUVNL Subsidiaries/ CPSU/SPSU/IPP etc. on the basis of above undertaking shall not
be considered as 'offered' price for the tender items in subsequent tender, if it is not within period
mentioned above.
I / We accept above undertaking.
Seal of the Firm Signature of the Tenderer
With Designation
(To be submitted duly filled and with Seal & Signature of Tenderer on Rs 300/- Stamp paper)
DECLARATION FORM Date:
Tender No/ RFQ No:
1. I/We hereby declare that I/We have carefully studied the entire tender placed on the WEB site and conditions of
contract, specifications and other documents of this work mentioned in the tender and abide by the same. Also, I/We
hereby agree to execute the same accordingly.
2. I/We hereby abide to execute the contract agreement by downloading the copies of the conditions of contract,
specifications and other documents of this work or otherwise I/we will get copy of the same from the office of the
tender inviting authority and the same will be acceptable to me/us.
3. I/We hereby accept and confirm that any dispute on this regard shall not be entertained by the tender inviting
4. I/We hereby declare that I/We have visited the work site and fully acquainted myself/ourselves with the local
situations regarding materials, labour and other factors pertaining to the work before submitting the tender.
5. I/We hereby confirm that our offer is Un-conditional and without any technical & commercial deviations.
6. Should this tender be accepted, I /We hereby agree to abide by to fulfill all the terms-conditions and provision of
the Tender and Contract for Works as applicable and default thereof, to forfeit and to pay to the Gujarat State
Electricity Corporation Limited the sums of money due.
7. The full value of the “Earnest Money Deposit” paid herewith should be absolutely forfeited to the Corporation,
should I/ we do not deposit the specified amount of specified Security Deposit within 15 Days from receipt of the
Letter of Intent.
8. If, I fail to submit all required documents with application or tender copy ( in each tender ) then my tender will
be cancelled, which is binding to me.
9. If, full or part work will be given to me, it will be accepted to me with same terms, rate & conditions.
10. I, ______ proprietor / owner / partner / Authorized Agent of M/s. ______ do hereby also declare and undertake
a) That I have covered all the eligible employee/s under the Employees’ Provident Funds and Miscellaneous
Provisions Act, 1952 and deposited the contributions under my PF Code No. ______, place: ______ for the month/s
of my contractual period and as such no amount towards contribution whatever is payable.
b) I further declare and undertake that in case any liability pertaining to any of my worker, labour, employee/s is/are
to be discharged by the principle employer i.e. Gujarat State Electricity corporation Limited, Ukai Thermal / Hydro
Power Station due to my lapse, I undertake to reimburse the same or the principle employer is authorized to deduct
the same from my dues as payable.
c) I further declare and undertake the legal consequences which may arise in future under the said work order
awarded, and I bond myself to resolve the same at the risk and cost of M/s. _______________________
11. I/We ______________________________________authorized signatory of M/s
_______________________________________here by certify that M/s
_________________________________________________ and their proprietor / any partner / any directors of the
firm is not stop deal and / or banned for business dealing and / or black listed by GUVNL and / or their any subsidiary
company viz. GSECL / GETCO / DGVCL / MGVCL / UGVCL / PGVCL as well as Government and / or Semi
Government company / department.
Signature of the Tenderer with designation
Seal of the Firm/company
(ON STAMP PAPER OF Rs.300/-)
E. M. D. BANK GUARANTEE FORMAT
Electricity Corporation Ltd.)
Whereas M/s. __________________________________________(Name & Address of
the Firm) having their registered office at (Address of the firms Registered office) (Here
in after called the ‘Tenderer’) wish to participate in the tender No.._____________for
Erection/ Supply & Erection Work) (Name of the material/ equipment/ Work) For Gujarat
State Electricity Corporation Ltd (Hereinafter called the “Beneficiary”) and whereas Bank
Guarantee for Rs._____________(Amount of Bank Guarantee towards EMD) valid till
________________(Mention here date of validity of this guarantee which will be 6 (Six)
months from the date of submission of Bid of the tender) which is required to be submitted
by the Tenderer along with the tender.
Bank and address of the Branch giving the Bank Guarantee) having our registered office at
______________________(Address of Bank’s registered office) hereby give this Bank
Guarantee No.________________ dated_________ and hereby agree unequivocally
and Unconditionally to pay within 48hours on demand in writing from the Gujarat State
Electricity Corporation Ltd or any officer authorized by it In this behalf any
amount not exceeding Rs.______________(Amount of E.M.D.),
(Rupees_________________________________(In words) to the said Gujarat State Electricity
Corporation Ltd on behalf of the Tenderer.
We_________________________________(Name of the Bank) also agree that
withdrawal of the tender or part thereof by the tenderer within its validity or Non
submission of performance Guarantee towards execution/ supply period by the Tenderer
within 15 days from the date of issue of letter of acceptance by the Gujarat State Electricity
Corporation Ltd would constitute a default on the part of the Tenderer and that this Bank
Guarantee is liable to be invoked and en cashed within its validity by the Beneficiary in case of
any occurrence of a default on the part of the Tenderer and that the en cashed amount is liable
to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of
____________________ (Mention here the date of validity of Bank) and shall not be
terminable by notice or by Guarantee) change in the constitution of the Bank or the firm of
Tenderer Or by any reason whatsoever and our liability here under shall not be impaired
or discharged by any extension of time or variations or alternations made, given,
conceded with or without our knowledge or consent by or between the tenderer and the
Gujarat State Electricity Corporation Ltd.
Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this bank guarantee shall not be assignable, transferable by the beneficiary (i.e. Gujarat
State Electricity Corporation Ltd.). Notice or invocation by any person such as assignee,
transferee, or agent of beneficiary shall not be entertained by the bank. Any invocation of the
guarantee can be made only by the beneficiary directly.
NOT WITHSTANDING anything contained hereinbefore our liability under this guarantee is
restricted to Rs._____________ (Amt. of EMD) Rupees__________________________ (In
words). Our Guarantees shall remain in force till_____________________ (Date of validity of
the Guarantee). Unless demands or claims under this bank Guarantee are made to us in writing
on or before ________ (date of validity of bank Guarantee), all rights of beneficiary under this
bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities
Please Mention here Complete Postal
Signature of the Bank’s Authorized Signatory
Address of the Bank with Branch Code,
with Official Round Seal.
Telephone and Fax Nos.
(ON STAMP PAPER OF RS.300/-)
FORM OF BANKER’S UNDERTAKING
[Security Deposit cum Performance Guarantee (PBG) towards execution period and
Guarantee/warrantee period as per Contractual Terms and Conditions of Tender]
We, ___ (Name of Bank and address of the branch
giving the bank Guarantee) having our registered office at
registered office) hereby give this Bank Guarantee No. ____________ date: ______________ and
hereby agree unequivocally and unconditionally to pay immediately on demand in writing
from the Gujarat State Electricity Corporation Limited or any Officer authorized by it in this
behalf any amount up to and not exceeding Rs. _____________ (Amount of
Security Deposit (SD) cum Performance Bank Guarantee (PBG) towards Guarantee/Warrantee
period) (Rupees ______________________________in words) to the said Gujarat State
Electricity Corporation Limited on behalf of M/s. __________ __ ___
who have entered into a contract for the supply/works specified below:
L.O.A / L.O.I. No.______ dated___ __.
This agreement shall be valid and binding on this Bank up to and inclusive of
__ (Date of validity of the Bank Guarantee) and shall not be terminable by notice or by
change in the constitution of the Bank or the firm of Contractors / Suppliers or by any
other reasons whatsoever and our liability hereunder shall not be impaired or discharged by
any extension of time or variations or alterations made, given conceded or agreed, with or
without our knowledge or consent, by or between parties to the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e.
GUVNL or Subsidiaries). Notice or invocation by any person such as assignee, transferee
or agent of beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee
can be made only by the beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to Rs. ______________ (Rupees _____________ ___
only). Our guarantee shall remain in force until _ ___ (Date of validity of
the Bank Guarantee). Unless demands or claims under this Bank Guarantee are made to us in
writing on or before ____________ (Date of validity of the Bank Guarantee), all rights of
Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and
discharged from all liabilities there under:
Please Mention here Complete Postal Signature of the Bank’s Authorized Signatory
Address of the Bank with Branch Code, with Official Round Seal.
Telephone and Fax Nos.
NAME OF DESIGNATED BANKS:
A. Guarantees issued by the following banks will be accepted as SD/EMD on a permanent
All Nationalized Banks
B. Guarantees issued by the following Banks will be accepted as SD/EMD for the period
up to March 31, 2027. The validity cut-off date in the GR is with respect to the date of
issue of Bank Guarantee irrespective of the date of termination of Bank Guarantee.
Sr Name of Banks Sr Name of Banks
1 AXIS Bank 23 South Indian Bank
2 AU Small Finance Bank 24 Standard Chartered Bank
3 Bandhan Bank 25 Tamilnad Mercantile Bank
4 City Union Bank 26 Ujjivan Small Finance Bank
5 CSB Bank 27 YES Bank
6 DBS Bank India Limited 28 Ahmedabad Mercantile Co-op. Bank
7 DCB Bank 29 Nutan Nagrik Sahkari Bank Ltd.
8 Dhanlaxmi Bank 30 Rajkot Nagarik Sahakari Bank Ltd.
9 Equitas Small Finance Bank 31 Saraswat Co-Operative Bank Ltd.
10 FEDERAL Bank 32 SBPP Co-operative Bank Ltd.
11 HDFC Bank 33 SVC Co-Operative Bank Ltd.
12 HSBC Bank 34 The Cosmos Co-op Bank Ltd.
13 ICICI Bank 35 The Gujarat State Co-operative Bank
14 IDBI Bank 36 The Surat District Co-op Bank
15 IDFC First Bank 37 The Surat People's Co. Op. Bank Ltd
16 IndusInd Bank 38 The Baroda Central Co-operative Bank
17 Jammu and Kashmir Bank 39 The Panchmahal District Co-operative
18 Jana Small Finance Bank 40 The Kalupur Commercial Co-op. Bank
19 Karnataka Bank 41 The Rajkot Commercial Co-operative Bank
20 Karur Vysya Bank 42 The Banaskantha Mercanttile Co-op. Bank
21 Kotak Mahindra Bank 43 Gujarat Gramin Bank
Undertaking from Third Party Inspection Agency/Statutory Auditor or Practicing CA/CA
(On letter head digitally signed by a person duly authorized to Sign on behalf of the firm)
Thermal Power Station Ukai
Subject: Authentication of veracity of documents submitted by M/s …….. in support of
Meeting the Qualifying Requirements
Ref: Tender no. …………………..
Name of the Package/ Tender: ………………………………………
M/s. ………………. (Hereinafter called Bidder) having Registered office at
…………………… intend to participate in above referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting Documents pertaining
to Qualifying Requirement duly verified and certified by Third-Party Inspection Agency
(TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm as per the list
mentioned in the bidding documents. In this regard, it is hereby confirmed that we have
examined the following documents, which are also attached with this letter. The same has been
verified from the Original Documents and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and authentic.
1. Doc ref. no. ……….. Dated …….. (Name of Documents)
2. Doc ref. no. ……….. Dated …….. (Name of Documents)
All the aforesaid documents have been digitally signed by us as a certificate of authenticity.
We further confirm that we neither have any vested interest in aforesaid tender nor have any
conflict of interest in respect of above tender.
This certificate is issued at the request of M/s ………………. (Bidder) for the purpose of
participating in the subject tender/s.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice.pdf
Tender Document WT-5286.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .