Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
26 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Minicipal Commissioner - West Zone
Storm Water Line Maintanence work and catchpir repairing & Making New Catchpit with Ex. Storm Water Line Network at Nirnaynagar,Chandlodiya,Ranip Area & diff roads,Housing area in nava vadaj ward(wz)(SHEDULE OF MEINTANANCE TYPE WORK)
367571
3/26-27 (T.N. 15)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹10,000
23 Nov 2026
23 Nov 2026
23 Nov 2026
26 Nov 2026
23 Nov 2026
120 days
Name of Work :- Storm Water Line Maintanence work and catchpir repairing & Making New
Catchpit with Ex. Storm Water Line Network at Nirnaynagar,Chandlodiya,Ranip Area & diff
roads,Housing area in nava vadaj ward(wz)(SHEDULE OF MEINTANANCE TYPE WORK)
AHMEDABAD MUNICIPAL CORPORATION
MAHANAGAR SEVA SADAN-WEST ZONE
Name of Work:- Storm Water Line Maintanence work and catchpir repairing & Making New Catchpit
with Ex. Storm Water Line Network at Nirnaynagar,Chandlodiya,Ranip Area & diff roads,Housing area
in nava vadaj ward(wz)(SHEDULE OF MEINTANANCE TYPE WORK)
Sr. Item Description Qty Rate in Rs. Per Amount in
Excavation for pipe line trenches for water supply,
sewerage line, manhole etc. all with shoring and
struting if required as per required gradient and line
including safety provisions using site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and
strata as specified. (Based on GWSSB SOR 2023-24,
a) In all sorts of soil and soft murrum
b) In hard murrum, boulders incl. macadam road.
c) In soft rock and/or masonry in CM or L M or Lime
In hard rock and / or in C. C. 1:2:4 or RCC with
blasting, breaking, chiseling, or by
chiseling/breaking only.
1.A.1 Upto 1.50 mt depth
1.A.2 1.50 mt to 3.00 mt depth
1.A.3 3.00 mt to 4.5o mt depth
Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including demolishing
the asphalt carpet,metal,soiling/cutting
Reinforcement etc.comp. with stacking the
material as directed. ( Based on Previously
approved rate by C E sir
a up to 0.20 meter thickness (By Manual)
Up to 0.30 meter (By any type of Breaker
b Machine or R.C.C.Cutter machine including cost of 176.00 Smt
operator, fuel, & transportation etc complete.
0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including cost of
c operator, fuel, & 308.00 Smt
transportation etc complete.
Excavation in bituminous road as per required
gradient and line including safety provisions using
site rails and stacking excavated stuff including up to
all required lead cleaning the site etc. complete for
all lifts as specified. (Based on GWSSB SOR 2023-24,
Refilling of pipeline trenches (Based on GWSSB SOR
Refilling the pipeline trenches incl. ramming,
watering, consolidating desposal of surplus stuff as
directed within a radius of 3 km.
1 Refilling as directed 10.00 22.00 cum
2 --do-- with selected soil brought from outside 10.00 175.00 Cu. M.
including '' lead
Conveyance charge of earth, lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock, fly
ash, aggregates of any kind executed outside the
4 road site. Rate also includes spreading & levelling etc
complete. Internal conveyance above 50 mt done
within the work site is not payable. (Road work
tender approved rate)
a) Lead up to 1 Km. 23.38 Cu. M.
b) Lead From 1Km to 2 Km. 20.00 30.94 Cu. M.
c) Lead From 2 Km to 3 Km. 20.00 38.37 Cu. M.
d) Lead From 3 Km to 4 Km. 30.00 45.52 Cu. M.
e) Lead From 4 Km to 5 Km. 40.00 52.42 Cu. M.
f) Lead From 5 Km to 10 Km. 50.00 78.54 Cu. M.
g) Lead From 10 Km to 15 Km. 100.00 104.65 Cu. M.
5 Stoneware Pipe
Providing and supplying ISI marked only Standard
length Stoneware pipes in standard lengths of
following class and diameter including all taxes,
insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance
to departmental stores, stacking etc. (IS - 651 /
1989) (Based on GWSSB SOR 2022-23, P-17)
6 L,L& J of Stone Ware Pipes
Lowering, laying and jointing Stone Ware pipes of
following diameters with cement joints in C. M. 1:1
proportion in proper position, grade and alignment
at all level as directed by Engineer-in-charge
including conveyance from stores to site of work,
Jointing material etc. comp.(Based on GWSSB SOR
7 R. C. C. PIPE (Horizontal Cast)
R. C. C. PIPE (Horizontal Cast) Providing and
supplying ISI Standard R.C.C. pipes(of Sulphate
Resisting Cement) in standard lengths of following
class and diameter suitable for either collar joints or
rubber ring joints including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc Note : One collar
should be supplied with each full length plain ended
RCC pipe, cost included in rates below. One rubber
ring should be supplied with each full length
socketed pipe, cost included in rates below. (Based
on GWSSB SOR 2022-23, P-13 to 15)
7.1.D Class NP3 Test Pressure 0.7 Kg/sq.cm
8 R. C. C. PIPE (vertically cast)
Providing and supplying ISI Standard R.C.C. pipes(of
Sulphate Resisting Cement) in standard lengths of
class and diameter suitable for either collar joints or
rubber ring joints including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS -
458/ 1989) (Based on GWSSB SOR 2022-23, P-
8.2.A Class NP3 Test Pressure 0.7 Kg/sq.cm
9 L,L& J of R.C.C. Pipes
Lowering, laying and jointing R. C. C. pipes in C. M.
1.1 1/2 of following diameters in proper position,
grade and alignment at all level as directed by
Engineer-in-charge including conveyance from
stores to site of work, labour, giving hydraulic
testing as per ISI code. (Based on GWSSB SOR 2022-
9.b Class NP2,NP3,NP4
Pipe dia. in mm
10 Repairing damaged M.H. and rasing M.H. up to
road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster in
C.M. 1:3 and fixing C.I. steps and existing MH sheet
cover, removing the debris from MH and carting the
same as directed. (AMC APPROVED RATE)
(A) up to 0.15 mt. (@ Two Coarse) 10.00 728.82 Nos
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
(D) up to 0.90 mt. (@ Ten Coarse )
Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation, Refilling,
Brick Bats Cement Concrete (1:5:10) of thickness
15 C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside &
outside (Only for shaft) In Cm 1:3, Finishing With
Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe
11 Coated Steps 35 Cm C/C At 35 Cm Staggered
Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of
thickness 15 C.M.,Including Cantering &
Reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.)But Excluding The Cost Of
Manhole Seat Cover Etc..Completed Of Size
X 1.00 Meter (Inside Clear, M.H. length should be
parallel to the flow) (AMC Approved Rate)
M.H.Chamber (P.H.E.) Small
a 1.00 to 2.00 meter depth, (Slab at Ground level)
(for pipe 5570.00 No.
b 2.00 to 3.00 meter depth, (Slab at below 0.60 mt.
From G.L.) 11231.00 No.
(for pipe dia <=300 mm)
Constructing Slab type M.H. Chamber of the
following size including excavation, refilling, brick
bats cement concrete (1:5:10) of thickness
C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside &
outside (Only for shaft) in CM 1:3, finishing with
cement slurry, P/F 4 mm dia M.S.Steel HDPE coated
steps 35 cm c/c at 35 cm staggered in masonary
CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M.,
including Cantering & reinforcement (double jalli
at 15 C.M. c/c bothway 12 mm dia.) but
excluding the cost of Manhole seat cover
etc..completed. of Size 1.00 X 1.40 meter (Inside
M.H. length should be parallel to the flow, for pipe
dia <= 800 mm) (AMC Approved Rate)
a 1.00 to 2.00 meter depth, (Slab at Ground level) 1.00 10031.00 No.
b 2.00 to 3.00 meter depth, (Slab at below 0.6 mt.
c 3.00 to 4.00 meter depth, (Slab at below 1.00 mt.
d 5.00 to 6.00 meter depth, (Slab at below 1.00 mt.
e 7.00 to 8.00 meter depth, (Slab at below 1.00 mt.
From G.L.) 65673.00 No.
Extra rate over item of Constructing Slab
Type M.H. Chamber of following size for
constructing M.H. Chamber, per 1.00 Decimetre of
13 additional depth or part thereof. etc. complete. Of
size 1.00 x 1.40 mt. (inside clear) and Depth from
(AMC Approved Rate)
a 4.00 to 5.00 meter depth,
b 6.00 to 7.00 meter depth,
c 8.00 to 9.00 meter depth,
d 9.00 to 10.00 meter depth, 1.00 556.00 DM
Dismantling of existing Arch type manhole up to
Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and &
finished 15 mm thick cement plaster inside in
CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated
14 steps 35 cm c/c at 35 cm staggered in masonry CM
1:5, incl. cost of RCC Slab in CC 1:1.5:3,
including Cantering & reinforcement as directed
by engineer in charge. Rate includes carting of
debris and excavated soil
.(AMC Approved Rate)
1.00 x 0.75 mt (inside clear) RCC Slab of
thickness 15 C.M& reinforcement (Single jalli at
C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth
a (Slab at Ground level) 5808.00 No
1.00 x 0.75 mt (inside clear) RCC Slab of
thickness 15 C.M& reinforcement (Single jalli at
C.M. c/c bothway 10 mm dia.) From 2 to 3 mt
b depth (Slab at below 1.00 mt. 8756.00 No
1.40 x 1.00 mt (inside clear) RCC Slab of thickness
23 CM & reinforcement (double jalli at 15 C.M. c/c
c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at 7664.00 No
1.40 x 1.00 mt (inside clear) RCC Slab of thickness
23 CM & reinforcement (double jalli at 15 C.M. c/c
d bothway 10 mm dia.) From 2 to 3 mt depth (Slab 16764.00 No
at below 1.00 mt. From
1.40 x 1.00 mt (inside clear) RCC Slab of thickness
23 CM & reinforcement (double jalli at 15 C.M. c/c
e bothway 10 mm dia.) From 3 to 4 mt depth (Slab 24420.00 No
at below 1.00 mt. From
Making connection to the ex.M.H.in running
sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any
convenient time. All damaged work shall be well
repaired as per instructions. etc..complete. (AMC
a a. 150 mm to 300 mm dia. 1.00 1320.00 No.
b b. 400 mm to 600 mm dia. 1.00 2200.00 No.
c c. 700 mm to 900 mm dia. 1.00 3080.00 No.
Cutting the pipes of following dia coming in the new
M.H.in running sewer including cutting bars,
including removing debris /silt from the M.H. and
16 carting at a suitable distance etc..complete as
directed. No payment for M.H. work will be made
until pipe is not cut completely in all respect. (Based
on Drainage SOR 2009-10)
a 150 mm to 300 mm dia. 2.00 1118.00 No.
b 400 mm to 600 mm dia. 2.00 1663.00 No.
c 700 mm to 900 mm dia. 2.00 1980.00 No.
Providing F.R.C. MH seat cover incl. carting to
17 the work site etc. comp. Directed. (Based on rate of
Providing F.R.C. MH seat cover including carting to
the work site etc. comp. Directed. (Based on rate of
central store) F.R.C. Extra Heavy Duty (EHD-35)
Manhole Covers & Frames Cover : 728mm ø &
mm thick circular cover, 35.00 MT load design,
100x2mm MS flat allround, 16mm ø plain round bar
for lifting the cover & should be fitted with plastic
cups. Frame : 560 mm ø clear opening, outer size-
888x888x175 mm. On the upper periphery of frame
25 x 3 mm wide MS flat should be well embed in
concrete to protect the edges of frame. FRC E.H.D.-35
manhole cover & frame described as above
Providing and fixing cast iron manhole frame of
weight 80 to 85 kg suitable for existing EHD-35 FRC
MH cover, rate also incl. loading, unloading and
fixing the frame in line and level to match
18 exisisting road level in C.C. 1:2:4 and finishing 71.10 per Kg
smooth, watering and protecting for 7 days etc.
complete as per instruction by engg. in charge.
19 Temporary/ permanent plugging and blocking of
sewer line, branch connections and diversion of
flows anremoval of all plugs, etc.(Based onGwssb
a 300mm dia. & below sewer line 1.00 1210.00 No.
b 400 to 500mm dia. Sewer line 1.00 1452.00 No.
Providing Dead Cantering using good quality
Country Wood Planks, wall Plate of required
thickness and size including placing the nece.
supports of reqd. size, nailing, fixing with
mortar, levelling. All specification for dead
centring as per standard engg. practice etc.
directed.(AMC Approved Rate)
21 Supplying Unskilled Labour( R & B SOR-24-25,PAGE 10.00 No
N0-43,I.CODE-L036 )
22 Labour charges - Supervision for Machinery ( R & B 2.00 711.00 No
SOR-24-25,PAGE N0-39,I.CODE-L029 )
Barricading the entire break down or excavated
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre, C.G.I.
Sheet, reflective paint / Board out side to avoid
accident & for smooth traffic diversion &
movement including cautionary board etc. Item also
includes for making temporary sufficient nos of
lighting arrangement through out the work with
necessary required arrangement.
..The same shall be removed after completion of
work. (Only for break down work from start to
complete) (AMC Approved Rate))
Dewatring by pumping set of required capacity
including temporary platform carting pumping at
site and fixing the same in position including all
accessories and fuel and labour etc.complete.
GWSSB 2023-24,PAGE NO-104,ITEM NO-1)
Providing & Supplying JCB Machine on rental basis
in case of emergency situation and break down type
work & also during unavoidable condition as per
instruction of engg.incharge, rate includes all nece.
25 shifting, fuel and operating charges and stacking of 535.71 Hour
useful & non-useful materials separately up to store.
(No payment should be allowed for non working
condition of machinery and for pipe line excavation
and laying work) (Road work tender approved rate)
Providing & Supplying Hitachi Machine-110
capacity on rental basis in case of emergency
situation and break down type work & also
during unavoidable condition as per instruction
of engg.incharge , rate includes all nece. shifting, fuel
and operating charges . (No payment should be
allowed for non working condition of machinery )
(AMC Approved Rate)
Providing & Supplying Hitachi Machine-200
capacity on rental basis in case of emergency
situation and break down type work & also
during unavoidable condition as per instruction
of engg.incharge , rate includes all nece. shifting, fuel
and operating charges . (No payment should be
allowed for non working condition of machinery )
(AMC Approved Rate)
Hiring Hydra/Crane with Driver (8 working hours in
28 day)(GWSSB SOR 2023-24,PAGE NO-105,ITEM NO-
12 tones 2.00 Per
16 tones 2.00 Per
20 tones 2.00 Per
Hiring of Tractor with trolley considering 8 hrs.
29 as working day hours incl. Driver.(GWSSB SOR 2022- 2104.09 Shift
23,PAGE NO-105,ITEM NO-7)
Supplying Electric Breaker Machine for RCC Slab
or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
Directed. (No payment should be allowed for
30 1056.00 Shift
non working condition of machinery and for
pipe line excavation and M.H. work. Allowed only
for break down work) ( Based on
Previously approved rate by C E sir )
Supplying Pneumatic Breaker Machine for RCC Slab
or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
31 Directed. (No payment should be allowed for non 535.71 HR.
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break
down work) (Road work tender approved rate)
Constructing Bombay Pattern Type Catch Pit of size
0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in
the prop. of CM (1:6) with 40 mm thick IPS
32 flooring in the Prop M15 at bottom and 15 mm thick 3110.80 No.
cement plaster inside the catch pit in the
proporation of CM (1:3) with out jali etc. comp. as
directed(AMC Approved RATE)
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit
33 jali with frame 600mm x 600mm clear opening etc. 1377.64 No.
comp.. As directed by engineer in charge.
34 Water Tanker 6 kl capacity 5.00 169.49 Hours
Providing, laying, spreading and compacting graded
stone aggregate to wemix macadam specification
including premixing the Material with water aOMC
in mechanical mix plant carriage of mixed Material
35 by tipper to sitelaying in uniform layers in sub- base
/ base course on well prepared surfacand
compacting with vibratory roller to achieve the
desired density as per
Codal Provision.(AMC Approved RATE)
Production & Supply of WMM 10.00
Laying of WMM 10.00 35.00 Cmt
Box cutting the road surface to proper slope and
camber for making a base
36 for road work including removing the excavated 127.13 Cmt
stuff and depositing on the road side slope as
directed upto 200 Mt.lead.
Providing and Laying of Rubber Moulded Paver 5.00
Block Grey/Coloured 60 mm thick, M-35 Grade of
any size ; shape (Usually Uni-Paver Blocks) using
black trap good quality aggragate of 20 mm nominal
size for footpath, parking areas, service lanes
and other areas as mentioned in the
drawing/instruction of engineer in charge. Cost
includes formworks using rubber mould, Rate
providing and laying paver blocks as per required
grading and specification. The paver block shall be
mechanically compacted. The work of paving
blocks shall be executed in line and level by skill
mason of flooring work only. It should be laid in such
a way that the no cutting of the paver block to be
necessary. if cutting of paver block necessary then it
should be cut by machine only and carting. The
finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall be
compacted and shall be relaid if necessary. Gravel or
such type of materials shall not be allowed for
production. Laying on 5cms thick sand beddding.
(AMC APPROVED RATE)
Providing and laying of interlocking grey Paver 5.00
Blocks of high density 80mm thick made from M-40
grade concrete using 6 mm to 20 mm machine
crushed well graded stone aggregate, sand of
approved quality, OPC 53 grade cement with
contractor's own concrete mix design as approved
by AMC, for parking, road. Cost Includes formwork,
using rubber/FRP mould, laying paver block as per
required grading and specification laid paver block
shall be mechanically compacted. The work of the
paving blocks shall be executed in line and level by
skilled mason of flooring work only. It should be laid
in such a way that the no cutting of the paver block
to be necessary. Cutting of paver block by machine
cut only and carting to be done. The Finished surface
of the Paver Block shall have reasonably good plain
finish. Paver blocks shall be compacted and shall be
re-laid if necessary. Gravel or such type of materials
shall not be allowed for production. Laying on 5 Cms
thick sand bedding. (AMC APPROVED RATE)
Supplying and fixing of 300 mm-L x 150 mm-B x 380 5.00
mm-H Kerb Block for Footpath in M-20 grade using
20 mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-cast
blocks, reasonably exposed finish/ formwork
mould with well equipped with vibratory system for
kerb stones of approved design including curing, etc.
complete, including the cost of formwork etc.
complete. The rate shall also include necessary
cutting of asphalt, fixing the Kerb stones in line and
level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of
the kerbstones. Filling of zari alone the sides of the
kerb stone fixed with Bituminous concrete mixed in
proper position as directed by Engineer in change to
form a portable mixture. In any case Gravel or such
type of materials shall not be allowed for production.
a) Laying on 5 cm thick Sand Bedding.(AMC
Labour work for fixing Interlocking Blocks / any 100.00
kind of pavement on up to 50 mm th sand bedding,
40 levelling, watering and fixing in line & level as well Smt
cleaning the site etc.comp. as directed.
Structural steel work ( Confirming to IS 4923- 1997) 200.00
riveted, bolted or
welded in builtup for all type sections, in framed
work, including cutting,hoisting, fixing in position
and applying a priming coat of approved steelprimer
all complete as per the structural designs an
directions of Engineer incharge. For Catchpit Frame
Providing and laying in position Ready Mixed M200
grade concrete for reinforced cement conctere
work , using cement content as per approved
Design Mix manufactured in fully automatic
batching plant and transported to site of work in
transit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced
cement concrete work including pumping of
R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering finishing
and reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to
accelerate/ retard setting of concrete, improve
workability without impairing strength and
durability as per direction of the Engineer - in -
charge. Without Fly Ash (R & B SOR-24-25,PAGE N0-
67,I.CODE-5055)
AHMEDABADMUNICIPALCORPORATIONENGINEERDEPARTMENT
NAVA VADAJ WARD
TECHNICALSPECIFICATION
NameofWork :- Storm Water Line Maintanence work and catchpir repairing &
Making New Catchpit with Ex. Storm Water Line Network at
Nirnaynagar,Chandlodiya,Ranip Area & diff roads,Housing area in nava vadaj
ward(wz)(SHEDULE OF MEINTANANCE TYPE WORK)
GeneralTechnicalSpecificationSection
temNo. Excavation for pipe line trenches for water supply, sewerage line, manhole etc. all with
1 shoring and struting if required as per required gradient and line including safety
provisions using site rails and stacking excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts and strata as specified. (Based on GWSSB SOR
MeasurementshallbegivenonCmt.basis.
ItemNo.2 Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC
of thickness up to 0.20 meter including demolishing the asphalt
carpet,metal,soiling/cutting Reinforcement etc.comp. with stacking the material
as directed. ( Based on Previously approved rate by C E sir
(a) up to 0.20 meter thickness (By Manual)
(b) 0.20meterto0.30meter(ByBreakerMachineincludingcostofoperator,fuel,&transp
ortaion etccomplete.
(c) 0.30meter&above(ByBreakerMachineincludingcostofoperator,fuel,&transp
ortaion etccomplete.
Theratepersq.mt.inthisitemshallbepaidextraadditiontotherateforexcavationMode
ofmeasurement:Therate shallbefora unitofSmtBasis.
ItemNo. Excavation in bituminous road as per required gradient and line including safety
3 provisions using site rails and stacking excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts as specified. (Based on GWSSB SOR 2023-24,
Refilling of pipeline trenches (Based on GWSSB SOR 2022-23, P-40).
--do--withselectedsoilbroughtfromoutsideincludingalllead
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
ItemNo. Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge,
4 excavated rock, fly ash, aggregates of any kind executed outside the road site. Rate also
includes spreading & levelling etc complete. Internal conveyance above 50 mt done within
the work site is not payable. (Road work tender approved rate)
a) Lead up to 1 Km.
b) Lead From 1Km to 2 Km.
c) Lead From 2 Km to 3 Km.
d) Lead From 3 Km to 4 Km.
e) Lead From 4 Km to 5 Km.
f) Lead From 5 Km to 10 Km.
g) Lead From 10 Km to 15 Km.
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
5-6 Providing and supplyingISImarkedonlyStandardlengthStoneware pipes in standard
lengths of followingclass and diameter including all taxes,insurance, transportation,
freight charges, octroi, inspectioncharges, loading, unloading, conveyance to
departmental stores,stacking etc. (IS - 651 / 1989) (Based on GWSSBSOR 2022-23, P-17)
L,L& J of Stone Ware Pipes
Lowering, laying and jointing Stone Ware pipes of following diameters with cement joints in C. M. 1:1
proportion in proper position, grade and alignment at all level as directed by Engineer-in-charge including
conveyance from stores to site of work, Jointing material etc. comp.(Based on GWSSB SOR 2022-23, P-40)
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved qualitymake
and shall be brought on site after approval. (The pipes shall be laid in grade as
perinstruction.)Contractorshall havetoprocurebillsforstandardpipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarndipped in
hot asphalt and caulking tools. The hydraulic pressure test shall be given to thecontractor for testing pipes
and jointing. No trenches shall be filled without the approval of theengineerincharge.
Therateofthepipeworkareincludingofexcavationandrefilling.Theexcavationetc.
shallbedoneasfollows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on theplan and
section. In all sorts of soil including old masonary, asphalt roads and wet excavation.The sewer
excavation shall be commenced at the down stream end of the sewer and
becontinueduptothegradientasdirected.Thetrenchshallnotopenmorethan60mts.inadvanceof the completed
sewer only when directed by the engineer in charge looking to the progress ofthe work in obtaining the
formation of the bottom of the trenches the usual methods of using signrails and boning roads shall be
adopted during the whole of the process. The centre line ofuniform height shall be carried clearly on each
rail. The depth of the excavation and invert of thesewer shall be checked by means of boning road of
approved length and also by straight edge.The bed of the trench shall be well rammed before starting
laying of sewer lines and cementconcreteandmasonarywork.
Where trenches are deep in bad grounds the sides shall be supported by suitabletimbering of
shorting work looking to the nature of the soil near big or important structure, thesides of the trenches
shall be closely and securely timbered, if any settlement of the buildings inanticipated the timbering shall
be left in the ground. The various materials excavated shall beseparately stacked so that in refilling that
may be relayed on the same order as before and leastpossible damage shall be done carpet on the public
roads and private properties. Surfacecovering consisting of asphalt carpet shall be kept on side and
preserved for reinstatement. Theexcavated earth shall not be heaped near the trenches so as to caused
unnecessary obstructionalong the trenches during inspection trenches etc. shall be tunneled under only as
necessary.The side of the trenches shall be nearly vertical and plumb and red light shall be placed at
eachend at intervals and instructions and further protected by rope fence. Necessary caution
boardsshallalsobe createdandasdirectedbytheengineerincharge.
Wherever possible material excavated from the trenches of whatever kind shall not
beplacednearerthanthreemetersfromtheouteredgeoftheexcavatedtrenches.Theutmostshallhave to be taken
in refilling the trenches so that no damage may be done no sewer, no lumpshall be allowed to be put
around the sewer. The ramming of the filling shall be done and wellwatered.
The surplus earth shall be removed directed within 30 meters lead. The measurementsof the work
shall be exact length and width of the trenches as specified or as per City Engineerinstruction and depth
shall be measured vertical as per section up to invert or the pipeline. TheCity Engineer reserves the right
of extra excavation on either side if considers necessary for thesafetyofthework.
The bottom and sides of the trench shall be dressed in level and plumb in all directedbefore any
concrete is in dia. In case the excavation is done deeper than required no filling shallbe allowed to bring
the formation to proper level but contractor shall have to lay cement or
limeconcreteoffilingorotheracceptablematerialsasdirectedbytheCityEngineeratcontractorowncost so as to
come to proper formation. In case bad formations are met with the work shall haveto be done as per
instruction of City Engineer. Necessary arrangements for watering trenchesmust be provided by
contractor and without proper watering trenches will not be allowed to befiled to further Contractor shall
have to make arrangement for access to invert of the sewer andfor inspection of the work as ordered by
the engineer. If it is required to shift or after thealignment section of diameter of the pipe the contractor
shall carry out the altered work at therates quoted by him for the original work for items and contractor
shall not claim any expensesduetothe changesmade.
In no case work shall be done at night or no Sundays & other holidays and during
therecesstimeexceptinandotherholidaythecaseofbadgroundssuchasrunningsandwherethework must be
executed vigorous day night without interruption when so ordered by the engineer.All existing water pipe
storm drains sewer line railway track, electric cables etc. which do not inthe opinion of engineer required
to be changed in location shall be supported and protected frominjury by the contractor. The contractor
shall be liable to pay all damages to water-pipe, drainselectric and telephone cable and to private property
during the execution of this contract and thesame will be recovered from the running bills or the deposit of
work change location of anyexisting sewers drains etc. not otherwise from in these specification the
contractor shall do thework of making such change and the work shall be paid for as extra work. All
places utility etc.shallbekept accessibleforuse.
No extra payment shall be made for land sides and side stops done without prior approval of
theengineerincharge.
The excavation of trenches shall be done foot wider on each side of the pipe than theinside
diameter of the sewer in case of depth excavation exceeding 3 meters above invert,
onefeetwiderexcavatedoneithersidefortheupperdepthabove3metersshallbeallowedandpaidfor. Wherever
natural soil demands winder excavation the mentioned above the same shall begiven after approval of
City Engineer. The rate for excavation for easy jointing and caulkingnothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of
lineandhydraulictestpracticableofthelinesarecheckedandapprovedofandordergivenbythe
Engineerincharge.Therefillingshallbeaccompaniedbythroughwateringforlayersof0.50
mtrs. Further refilling shall be done thereafter and process should be repeated till trenches arecompletely
refilled. Temping and ramming with rammers shall have to be done at all place ofimportant work where
ordered by Engineer in charge. After order to refill the trench is give
thetrenchesshallhavetoberefilledwithin4dayswithcompletewatering.Ifthecontractorfailstodo watering
satisfactory corporation shall get it done at the risk and cost of the contractor with orwithout giving any
notice and the expenses incurred in doing so recovered from the contractoreitherincost
orfromhispaymentthroughbills.
Modeofmeasurement:-
The rate shall be for unit of Rmt basis
ItemNo. R. C. C. PIPE (Horizontal Cast)
7-8 Providing and supplying ISI Standard R.C.C. pipes(of Sulphate Resisting Cement) in
standard lengths of following class and diameter suitable for either collar joints or rubber
ring joints including all taxes, insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to departmental stores, stacking etc
Note : One collar should be supplied with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below.
Providing and supplying ISI Standard R.C.C. pipes(of Sulphate Resistin
g Cement) in standard lengths of following
class and diameter suitable for either collar joints or rubber ring joints including all taxes,
insurance, transportation, freight charges, octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc. complete.
TheRCCpipesshallbeprocuredasperISSforBClasstypespecificationsusingbestmaterials,first class
workmanship as per IS 458/1971 of NP2 / NP3 class as per specified in the tenderitem. The proportion of
concrete shall be one part of cement to 2 parts sand and 4 parts of blacktrap agg. mix. of suitable size to as
to produce uniform concrete through out thicknessof thepipes.
Reinforcement in form of bars straight and class wise shall be provided as per IS458 classspecifications.
RCCspunpipecollarsforthepipesshallbemadeinthesamemanner.Theinternaldiameterofthe collar shall be
sufficiently large to allow a perfect joint around the outside of the pipes withcement
mortarandotherplasticmaterials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially preparedformation
or on concrete bed and for the purpose to extra rate shall be given making extraexcavation
forbedandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in thelength. For
each joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned
andmoisturedandthecollarshallbekeptinpositionbymeansofwedges.Semidrycementmortarofprop. 1:1 shall
be forced into joints and chaucked completely by means of special cutting toolsuntil the whole space is
full. The mortar shall be sprayed around the collar joints so as tocompletelyencasethejoint.
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and ifhe has any
doubt as to their soundness be may required the contractors to cut open and clearaway the cement of any
joint that he may select and to make good the same at their expensesprovided that, unless some defect be
found, they shall be required to open more than one jointsin 18mt (60’) of pipe, though if defect be found
the Engineer direct them to open as many jointsas he may deem necessary, the joints made one day will
not as a rule, be inspected until thefollowingdayandthe
cementmayhassufficienttimetosetwellbeforebeingcoveredup.
Trenches shall not be filled until alignment and levels are examined by the Engineer or
hissubordinatesandthepermissionforrefillingisgranted.
The RCC pipes shall be manufacturers as per IS for B class pipes specifications using bestmaterials first
class workmanship as per IS 458/1971.and latest IS code for R.C.C. pipe line ofNP3class.
Theproportionofconcreteshallbeonepartofcementto2partsofsandand2partsofblacktrapagg.Mixofsuitablesiz
e soastoproducingfirmconcretethoughtthicknessofthepipes.
Reinforcement on form of bars straight & cross wise shall be provided as per IS 458/ classspecifications.
RCC spun pipes collars for the pipes shall be made in same manner the internal diameter of thecollar shall
be sufficiently large to allow a perfect joint around the outside of the pipes withcement
mortarandotherplasticmaterials.
Any damaged or cracked carefully into trenches and shall be made to rest evenly on speciallyprepared
formation and for the purpose no extra rate shall be given for claming such hollows
inbendsandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in
thelengthforeachjointdipedisnotasphaltafterthejointhasbeenproperlycleaned&moistureand
collarkeptinpositionbymeansofwedges,semi-drycementmortarprop.1;1shallbefacedinto
it and caulked completely by means of specials caulking tools until the whole space in full.
Themortarshallbesprayedoff intheformof filleraroundthepipes.
The R.C.C. NP3 pipe line shall run in perfect straight lines from manhole and shall be exactly togradient.
M/SshallbeinRMT.
Trenches shall not be filled in until the line has been tested and alignment and levels
areexaminedbytheEngineerorhissubordinatesandthepermissionforrefillingisgranted.
Contractor shall be held responsible for any damage or defect to the pipe line in satisfactoryworking of the
same for 12months after it is put into commission, contractor must satisfy
IS458/1971andIS783/1959withreferencetoRCCpipe.
Modeofmeasurement:-
The rate shall be for unit of Rmt basis
ItemNo. L,L& J of R.C.C. Pipes
09 Lowering, laying and jointing R. C. C. pipes in C. M. 1.1 1/2 of following diameters in proper position,
grade and alignment at all level as directed by Engineer-in-charge including conveyance from stores to
site of work, labour, giving hydraulic testing as per ISI code. (Based on GWSSB SOR 2022-23, P-39)
Class NP2,NP3,NP4
Pipe dia. in mm
Modeofmeasurement:-
The rate shall be for unit of Rmt basis
ItemNo. Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work and
10 repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and carting the same as directed. (AMC APPROVED RATE)
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
(D) up to 0.90 mt. (@ Ten Coarse )
Modeofmeasurement:-
The rate shall be for unit of Nos basis
Item Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation,
No.11 Refilling, Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4)
of thickness 10 C.M., finished 15 mm thick cement plaster inside & outside (Only for
shaft) In Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe
Coated Steps 35 Cm C/C At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In
Cc1:1.5:3 of thickness 15 C.M.,Including Cantering & Reinforcement (Single jalli at
15 C.M. c/c bothway 10 mm dia.)But Excluding The Cost Of Manhole Seat Cover
Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear, M.H. length should be
parallel to the flow) (AMC Approved Rate)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)(forpipedia<=230mm)
2) 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) (for pipe dia
Cementusedshallbegotapprovedbytheenginreinchargebeforestartingtheworkthisshallcomplywithsp
ecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbatstobeusedforconcretemustbethoroughlywellburntandfreefromanyimpuritiesandsizefr
Thepreparationofconcreteshallbeonepartofcement5partofsand&10partbroken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like
manner with joints plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face
work should be neatly finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general instructions.The rate
includes all necessary materuals mixing laying and remain and watering the exposedfaces tobe finished
with neat cement as per instruction the channel shall be half round and asper drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300mmabove
thebenching. Themanhole/inspectionchamberframeand covershallbeofcast
iron of specified weight and shall conform to the requirements given in IS:1726. The covers andframes
shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.They shall be
neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyenginee
rinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit of one number basis.
Item Constructing Slab type M.H. Chamber of the following size including excavation,
No.12 refilling, brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel
(1:2:4) of thickness 10 C.M., finished 15 mm thick cement plaster inside & outside
(Only for shaft) in CM 1:3, finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE
coated steps 35 cm c/c at 35 cm staggered in masonary CM 1:5, RCC Slab in CC
1:1.5:3 of thickness 23 C.M., including Cantering & reinforcement (double jalli at
C.M. c/c bothway 12 mm dia.) but excluding the cost of Manhole seat cover
etc..completed. of Size 1.00 X 1.40 meter (Inside Clear,
M.H. length should be parallel to the flow, for pipe dia <= 800 mm) (AMC Approved Rate),
M.H.lengthshouldbeparalleltotheflow,forpipedia<=800mm)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)
2) 2.00to3.00meterdepth,(Slabatbelow0.6mt.FromG.L.)
3) 3.00to4.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
4) 5.00to6.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
5) 7.00to8.00meterdepth,(Slabatbelow1.00mt.FromG.L.)(a)Ex
cavation:ThisbedoneasspecificationinItem No.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as
requiredusingmeasursboxesforsandandcementbagof1.25cft.or1cft.asmeasuredthecasemay
be all materials shall be stacked on the site as not to obstruct tra fic in any way the masonaryshould be
constructed in proper workmanship like manner with joints plunb etc. to conform withgeneral
specification No.45 P.W.D hand book. The face work should be neatly finished.
Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general instructions.The rate
includes all necessary materuals mixing laying and remain and watering the exposedfaces tobe finished
with neat cement as per instruction the channel shall be half round and asper drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300 mm above the
benching. The manhole/inspection chamber frame and cover shall be of castiron of specified weight and
shall conform to the requirements given in IS:1726. The covers andframes shall be cleanly cast and they
shall be free from air and sand holes and from clod shuts.They shall be neatly dressed and carefully
trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyengineer
inchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item Extra rate over item of Constructing Slab Type M.H. Chamber of following
No.13 size for constructing M.H. Chamber, per 1.00 Decimetre of additional depth or part
thereof. etc. complete. Of size 1.00 x 1.40 mt. (inside clear) and Depth from (AMC
Modeofmeasurement:
Therateshallbeforaunit ofDMbasis.
Modeofmeasurement:
Therateshallbeforaunit ofDMbasis.
Item Dismantling of existing Arch type manhole up to Arch and then Const. Slab type
No.14 manhole of following size incl. excavation, refilling and & finished 15 mm thick
cement plaster inside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm
c/c at 35 cm staggered in masonry CM 1:5, incl. cost of RCC Slab in CC 1:1.5:3,
including Cantering & reinforcement as directed by engineer in charge. Rate
includes carting of debris and excavated soil
1) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement
(Singlejalliat15C.M. c/cbothway10mmdia.)From0to2mtdepth(SlabatGroundlevel)
2) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement
(Singlejalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slabatbelow
1.00mt.FromG.L.)
3) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth(Slab atGround level)
4) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab atbelow1.00mt.
5) 1.40x 1.00 mt(insideclear) RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab atbelow1.00mt.
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like
manner with joints plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face
work should be neatly finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
TheworkshallbeasperP.W.DhandbookspecificationNo.20aspergeneralinstructions.
The rate includes all necessary materuals mixing laying and remain and watering the exposedfaces tobe
finished with neat cement as per instruction the channel shall be half round and asper drawing &
instruction of Engineer in charge. proper bunching shall be provided at both of thechannel.
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300 mm above the
benching. The manhole/inspection chamber frame and cover shall be of castiron of specified weight and
shall conform to the requirements given in IS:1726. The covers andframes shall be cleanly cast and they
shall be free from air and sand holes and from clod shuts.They shall be neatly dressed and carefully
trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkor
asdirectedbyengineerinchargeorAdditionalCityEngineer(southzone)Modeofmeas
Therateshallbeforaunit ofonenumberbasis.
ItemNo. Making connection to the ex.M.H.in running sewer incl. Dewatering and other
15 required machinery etc. of following dia pipes at any convenient time. All damaged
work shall be well repaired as per instructions. etc..complete
. a. 150 mm to 300 mm dia.
b. 400 mm to 600 mm dia.
c. 700 mm to 900 mm dia.
Rateincludesconnectioninthesewerlineatanyconvenienttimewhentheloadonthedrainageline in less. All
damaged work shall be well repaired as per instruction of officer in charge.Proposed R.C. C. line should
be connected with the existing M.H. as directed. Holes made inthe well of existing M.H. should be
finished smooth and in circular shape as directed. Rate alsoincludes making new channel or repairing
existing damaged channel if instructed. Rate isinclusiveofwateringetc.as directed.
Modeofmeasurement:
Therateshallbefor aunitofNosBasis
ItemNo. Cutting the pipes of following dia coming in the new M.H.in running sewer including
16 cutting bars, including removing debris /silt from the M.H. and carting at a suitable
distance etc..complete as directed. No payment for M.H. work will be made until pipe is
not cut completely in all respect..
a. 150 mm to 300 mm dia.
b. 400 mm to 600 mm dia.
c. 700 mm to 900 mm dia.
ng in the new M.H. in running sewer of any dia pipes at any convenient time when M.H. is
foundemptyalldamageworkshall bewellrepairinstruetionsetc.comp.
material shallbe cut as pes requirement to Cutting thepipe in existing manhole reinforcementbars shall also
have to be cut in existing manhole as per requirement and making good thesame. the dis mental materials
shall be carried ti placesat all lead as directed by engineer
inchargeIfdirectedtheworkshallhavetobedoneatnightthemeasurementshallbeaspernos
Modeofmeasurement:
herateshall beforaunitofNosBasis
ItemNo. Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
17 (Based on rate of central store)
Providing F.R.C. MH seat cover including carting to the work site etc. comp. Directed.
(Based on rate of central store) F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers &
Frames Cover : 728mm ø & 100 mm thick circular cover, 35.00 MT load design, 100x2mm
MS flat allround, 16mm ø plain round bar for lifting the cover & should be fitted with
plastic cups. Frame : 560 mm ø clear opening, outer size-888x888x175 mm. On the upper
periphery of frame 25 x 3 mm wide MS flat should be well embed in concrete to protect
the edges of frame. FRC E.H.D.-35 manhole cover & frame described as above.
Modeofmeasurement:
herateshall beforaunitofNosBasis
ItemNo. Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for existing
18 EHD-35 FRC MH cover, rate also incl. loading, unloading and fixing the frame in line
and level to match exisisting road level in C.C. 1:2:4 and finishing smooth,
watering and protecting for 7 days etc. complete as per instruction by engg. in
charge. (Approved
Modeofmeasurement:-
Therateshallbeforaunitofonen PER KGS BASIS
ItemNo. Temporary/ permanent plugging and blocking of sewer line, branch connections
19 and diversion of flows anremoval of all plugs, etc.(Based onGwssb SOR 2022-23, P-102)
300mm dia. & below sewer line
400 to 500mm dia. Sewer line
Providing kachcha or pakka dummy in the following dia pipes and removing the sameafter the
connecting of the work as per instruction of engineer in charge. If kachcha or pakkadummy is not
removed by the contractor then the penalty shall be laid as per municipal rules orderived
bythemunicipalcorporationofficer'sin-charge.
Measurementsshallbegivenonno.basis.
ItemNo. Providing Dead Cantering using good quality Country Wood Planks, wall
20 Plate of required thickness and size including placing the nece. supports of reqd.
size, nailing, fixing with mortar, levelling. All specification for dead centring as
per standard engg. practice etc. comp. as
directed.(AMC Approved Rate)
Measurementsshallbegivenon smt.basis.
ItemNo. Supplying Unskilled Labour( R & B SOR-24-25,PAGE N0-43,I.CODE-L036 )
21 Measurementsshallbegivenon NOS basis.
ItemNo. Labour charges - Supervision for Machinery ( R & B SOR-24-25,PAGE N0-39,I.CODE-L029
Measurementsshallbegivenon NOS basis
ItemNo. Barricading the entire break down or excavated area on rental basis using wooden
23 ballies / M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board
out side to avoid accident & for smooth traffic diversion & movement including
cautionary board etc. Item also includes for making temporary sufficient nos of lighting
arrangement through out the work with necessary required arrangement.
..The same shall be removed after completion of work. (Only for break down work
from start to complete) (Based on Drainage SOR 2009-10)
Measurementsshallbegivenon HP/hrs basis.
ItemNo. Providing & Supplying JCB Machine on rental basis in case of emergency situation and
24 break down type work & also during unavoidable condition as per instruction of
engg.incharge, rate includes all nece. shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store. (No payment should be allowed for
non working condition of machinery and for pipe line excavation and laying work) (Road
work tender approved rate)
)Measurementsshallbegivenon HOURS basis.
ItemNo. Providing & Supplying Hitachi Machine-110 capacity on rental basis in case of
26 emergency situation and break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate includes all nece. shifting, fuel and
operating charges . (No payment should be allowed for non working condition of
machinery ) (Based on central work shop rate)
)Measurementsshallbegivenon HOURS basis.
ItemNo. Providing & Supplying Hitachi Machine-200 capacity on rental basis in case of
27 emergency situation and break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate includes all nece. shifting, fuel and
operating charges . (No payment should be allowed for non working condition of
machinery ) (Based on central work shop rate)
)Measurementsshallbegivenon HOURS basis.
ItemNo. Hiring Hydra/Crane with Driver (8 working hours in day)(GWSSB SOR 2023-24,PAGE NO-
28 105,ITEM NO-7)
)Measurementsshallbegivenon PER DAYS basis.
ItemNo. Hiring of Tractor with trolley considering 8 hrs.
29 as working day hours incl. Driver.(GWSSB SOR 2022-23,PAGE NO-105,ITEM NO-7)
)Measurementsshallbegivenon PER SHIFT basis.
ItemNo. Supplying Electric Breaker Machine for RCC Slab or Asphalt Demolishing Work on
30 site by using Operator, fuel, power Supply etc. Complete as Directed. (No payment
should be allowed for non working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break down work) ( Based on
Previously approved rate by C E sir )
)Measurementsshallbegivenon PER SHIFT basis.
ItemNo. Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work
31 on site by using Operator, fuel, power Supply etc. Complete as Directed. (No
payment should be allowed for non working condition of machinery and for pipe
line excavation and M.H. work. Allowed only for break down work) ( Based on
Previously approved rate by C E sir ))
)Measurementsshallbegivenon PER HOURS basis.
ItemNo. Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including
32 excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6)
with 40 mm thick IPS flooring in the Prop M15 at bottom and 15 mm thick cement plaster
inside the catch pit in the proporation of CM (1:3) with out jali etc. comp. as directed(AMC
Approved RATE))
)Measurementsshallbegivenon PER NOS basis.
ItemNo. CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear
33 opening etc. comp.. As directed by engineer in charge.
)Measurementsshallbegivenon PER NOS basis.
ItemNo. Water Tanker 6 kl capacity
)Measurementsshallbegivenon PER HOURS basis.
ItemNo. Providing, laying, spreading and compacting graded stone aggregate to wemix macadam
35 specification including premixing the Material with water aOMC in mechanical mix plant
carriage of mixed Material by tipper to sitelaying in uniform layers in sub- base / base
course on well prepared surfacand compacting with vibratory roller to achieve the desired
Codal Provision.
Production & Supply of WMM
)Measurementsshallbegivenon PER CMT basis.
ItemNo. Box cutting the road surface to proper slope and camber for making a base
36 for road work including removing the excavated stuff and depositing on the road side
slope as directed upto 200 Mt.lead.
)Measurementsshallbegivenon PER CMT basis.
ItemNo. Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35
37 Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap good quality
aggragate of 20 mm nominal size for footpath, parking areas, service lanes and other
areas as mentioned in the drawing/instruction of engineer in charge. Cost includes
formworks using rubber mould, Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be mechanically compacted. The work
of paving blocks shall be executed in line and level by skill mason of flooring work only.
It should be laid in such a way that the no cutting of the paver block to be necessary. if
cutting of paver block necessary then it should be cut by machine only and carting. The
finished surface of the paver block shall have resonably good, plain finished. Paver blocks
shall be compacted and shall be relaid if necessary. Gravel or such type of materials shall
not be allowed for production. Laying on 5cms thick sand beddding.
)Measurementsshallbegivenon PER SMT basis.
ItemNo. Providing and laying of interlocking grey Paver Blocks of high density 80mm thick made
38 from M-40 grade concrete using 6 mm to 20 mm machine crushed well graded stone
aggregate, sand of approved quality, OPC 53 grade cement with contractor's own concrete
mix design as approved by AMC, for parking, road. Cost Includes formwork, using
rubber/FRP mould, laying paver block as per required grading and specification laid paver
block shall be mechanically compacted. The work of the paving blocks shall be executed
in line and level by skilled mason of flooring work only. It should be laid in such a way that
the no cutting of the paver block to be necessary. Cutting of paver block by machine cut
only and carting to be done. The Finished surface of the Paver Block shall have
reasonably good plain finish. Paver blocks shall be compacted and shall be re-laid if
necessary. Gravel or such type of materials shall not be allowed for production. Laying on
5 Cms thick sand bedding..
)Measurementsshallbegivenon PER SMT basis.
ItemNo. Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb Block for Footpath in M-
39 20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba or equivalent
quality for pre-cast blocks, reasonably exposed finish/ formwork , mould with well
equipped with vibratory system for kerb stones of approved design including curing, etc.
complete, including the cost of formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick sand
bedding with necessary equipments and materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the
kerb stone fixed with Bituminous concrete mixed in proper position as directed by
Engineer in change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production. a) Laying on 5 cm thick Sand Bedding.
)Measurementsshallbegivenon PER SMT basis.
ItemNo. Labour work for fixing Interlocking Blocks / any kind of pavement on up to 50 mm th sand
40 bedding, levelling, watering and fixing in line & level as well cleaning the site etc.comp. as
)Measurementsshallbegivenon PER SMT basis.
ItemNo. Structural steel work ( Confirming to IS 4923- 1997) riveted, bolted or
41 welded in builtup for all type sections, in framed work, including cutting,hoisting, fixing in
position and applying a priming coat of approved steelprimer all complete as per the
structural designs an directions of Engineer incharge. For Catchpit Frame & Cover
)Measurementsshallbegivenon PER KGS basis.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
SealandSignatureoftheBidder Add.CityEngineer(WestZone)
AmdavadMunicipalCorporation
ybœtJtœ BGþrlrmvj ftuvotuhuNl
vr©b Ítul - Esluh Ftðþ
1. Ft<t îtht «t&b LOI (juxh ytuV RLxebuNl) RMgw fhJtbtk ytJNu. LOI (juxh ytuV RLxebuNl) bégt ctœ
rœl-10 btk 5 % (vtka xft) juFu auf&e / rzbtLz z[tVTx / vu ytuzoh / luNljtEÍz cukf duhkxe&e zevtuÍex Che
fhthvºt fhJtltu hnuNu. <u ctœ Jfo ytuzoh RMgw fhJtbtkk ytJNu ylu Jfoytuzohle <theF&e mbg bgtoœt NÁ &guj
dKJtbt ytJNu <ub A<tk vK ftb NY fhJtbtk lrn ytJu <tu rlgbtlwmth ftgoJtne fhJtbt ytJNu.
2. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
3. xuLzh Jujezexe 120 rœJm hnuNu.
4. xuLzh MJefthÔþk, h> fhÔþk, ftulu ytvÔþk ylu fgt CtJ&e ytvÔþk, <u ykdu zu. BGþrl. frb.©e ltu rlKog ytFhe hnuNu.
5. xuLzh Chuj ftuLx[t¾xh vife ftuEvK ftuLx[t¾xhlu vK yt CtJu ftb ytvJtbtk ytJu <tu ceò btLg ftuLx[t¾xh Jtk^tu
6. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftb NY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhÔþk vzNu. yuf
ftb ÃþÁ &tg vAe cesw ftb NY fheyu yuÔþk atjNu lrn.
7. atÕþ ftbu ftuE vK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEllu LþfNtl &Nu <tu
<ule mkÃËKo sJtc>the (òlbtjle) ftuLx[t¾xhle vtu<tle hnuNu. mtEx vh ftb œhBgtl bswh fu sl<tlt ftuE
btKmlt òl btj fu LþfNtl &tg <ule sJtc>the ftuLx[t¾xhle hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the
vK ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <ule sJtc>the vK vtujem Vhegt>btk ftuLx[t¾xhle hnuNu. CuFz ^me l
vzu <u btxu mjtb<elt vdjtk (suJt fu œtuuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t
Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[t¾xh s vtujem Vhegtœbtk sJtc>th hnuNu ylu BGþrl. ftuvtuohuNlltu ftuEvK
MxtV ytlt btxu sJtc>th hnuNu lrn.ytxÕþk mbSlu s xuLzh ChÔþk.
8. yt xuLzh su <u Jdolt btLg gt>elt ftuLx[t¾xhtu Che NfNu. dJbuoLxlt btLg ftuLx[t¾xhu y.BGþ.ftuvtuo. btk btLg
ftuLx[t¾xhle gtœebtk hSMx[uNl ðþhk< fhtJÔþk vzNu.
9. yt Wvhtk< y.BGþ.ftuvtuo.lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu. Vtubo ce-1le Nh<tu ck^lf<to
hnuNu. ftb htuz ylu rcÕz´d Ftðþk - øþsht< htßglt MvuNeVefuNl «btKu fhJtLþk hnuNu <&t MxtVle Mþalt vK
mtEx Wvh atÕþ ftbu ægtlbtk juJtle hnuNu. ce-1 Vtubo <&t MvuNeVefuNl øþsht< çþf Mxtuh, mu¾xh-21,
dtk^eldh Ft<u&e ftuLx[t¾xhu ò<u bu¤Je juJtltu hnuNu. <u Jtkaelu vAe s xuLzh ChÔþk.
10. ftuLx[t¾xhlu vubuLx BGþrl. ftuvtuo. Ltt rl<erlgb Bþsc fhJtbtk ytJNu.
11. ftuEvK ftg>tfeg jexeduNl yb>tJt> Nnuhle ftuxobtk hnuNu.
12. bxehegj fu ceò xuMx´d hevtuxo ftuLx[t¾xhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu
mkÃËKo Fao <&t BGþrl. MxtVlu juctuhuxhe Mþ^e <&t buLGþVu¾ah´d søgt Mþ^e jtJJt jE sJtltu Fao vK ftuLx[tfhu
CtudJJtltu hnuNu.
13. juch yu¾x «btKu hSMx[uNl ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu. juch
yu¾x «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[t¾xh mkÃËKovKu sJtc>th hnuNu.
14. btj su <u Mxtumo Wvh y&Jt mtEx Wvh Mþalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
15. muÕm xuût, ytu¾x[tug, mhatso, yLg xuût fu yLg ftuEvK fhJuht ChJtle sJtc>the ftuLx[t¾xhle hnuNu.
16. atEÕz juch yuBvjtug fhe NftNu lrn.
17. ftuLx[t¾xh îtht yuze.mexe.Rsluh©e / zu. mexe. Rsluh©ele mwalt bwsclt bxehegjltk muBvj hsw fhJtlt
18. ftuLx[t¾xhu atÕþ ftbu mtEx Wvh zeSxj fubuht&e ftb atÕþ > vnujtk, åttÕþ ftbu <&t ftb ÃËKo >lt Vtuxtud{tV
BGþrl. yturVmbtk ytvJtlt hnuNu.
19. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[t¾xh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle btkdKe fhe
NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
20. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu.
ßgtk ftuE atuFJx l &E ntug ðgtk ytE.yum. ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu.
21. htßg / fuL÷ mhfth©elt JF<tu JF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtlt nwfb mhfth©eyu fhuj ntuE <u
Bþsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
22. juch JuÕVuh Vkz btxu ntjbtk htßg mhfth©eyu fhujt nwfb Bþscle hfb cejbtk&e ftve juJtbtk ytJNu.
23. mœh ftb rNzgwj ytuV buRLxulLm «fthlwk Au subtk ytJuj ytuljtRl me.me.yt.yum Vhegtœlt SLA(
Service Level Agreement) rvhegzbtk rlftj VhSgt< fhJtltu &tg Au.stu ytJuj
ytuljtRl me.me.yt.yum Vhegtœltu <ult SLA ( Service Level Agreement) rvhegzbtk rlftj fhJtbtk
lne ytJu <tu leau bwscle vulÕxe fhJtbtk ytJNu.
Sr Deparmntent Category Problem SLA Penalty
no Period per one
1. Engineering Storm Water Road-Catch Pit Repairing 96 Hours
2. Engineering Storm Water Choking Of Line 48 Hours
3. Engineering Storm Water Manhole Cover Missing 24 Hours
4. Engineering Storm Water Water Logging Due to 24 Hours
Wvhtu¾< Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkae Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mrn <&t me¬tu yuze.mexe Rsluh (v.Ítul)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 15.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .