| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.0 LAccepted-AOC | ₹58.0 L Quoted ₹49.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹49.3 LRejected-Finance | ₹49.3 L | L2 | Rejected-Finance WORK AWARDED TO L1 BIDDER |
| 3 | Rejected-Technical AR CONSTRUCTIONS | - | - | Rejected-Technical Technical L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technical L4 |
| Sl No | Description | Qty | Unit | AR CONSTRUCTIONS L3 | A SATHEESH L2 | Ramakrishnan L4 | JASEEL K L1 |
|---|---|---|---|---|---|---|---|
| 1.00Appendix A : Landscaping | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 444 | sqm | 10.12 ₹4,492.69 Lowest | 20 ₹8,880 | 10.17 ₹4,517.68 | 16.17 ₹7,177.53 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 276.8 | sqm | 5.17 ₹1,432.15 Lowest | 10 ₹2,768 | 5.2 ₹1,440.11 | 8.25 ₹2,282.87 |
| 1.00 | OD13949/2024-2025:Engaging machinery for removal of earthen heap from the site including cutting of soil, getting out excavated soil, levelling the soil at site itself etc. complete as per the direction of Engineer in charge. | 16 | hour | 1,637.33 ₹26,197.24 | 1,400 ₹22,400 | 1,646.43 ₹26,342.92 | 1,305.29 ₹20,884.64 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 16.85 | cum | 234.6 ₹3,953.89 Lowest | 320 ₹5,393.28 | 235.9 ₹3,975.87 | 319.84 ₹5,390.53 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.63 | cum | 7,741.59 ₹4,877.2 | 7,060 ₹4,447.8 | 7,784.65 ₹4,904.33 | 7,053.34 ₹4,443.61 Lowest |
| 1.01 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 2.07 | cum | 9,385.44 ₹19,427.86 | 7,250 ₹15,007.5 | 9,437.63 ₹19,535.9 | 7,249.59 ₹15,006.66 Lowest |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 12.72 | cum | 3,897.17 ₹49,571.95 | 3,600 ₹45,792 | 3,918.84 ₹49,847.64 | 3,550.69 ₹45,164.8 Lowest |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 26.28 | cum | 8,142.28 ₹2,13,979.14 | 7,500 ₹1,97,100 | 8,187.56 ₹2,15,169.13 | 7,418.41 ₹1,94,955.9 Lowest |
| 1.01 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 15 | metre | 158.21 ₹2,373.22 | 110 ₹1,650 | 159.09 ₹2,386.42 | 109.25 ₹1,638.73 Lowest |
Tender Value
₹50.8 L
EMD Value
₹50,000
Closing Date
30 May 2026, 5:00 pmClosed
CHIEF ENGINEER, KSCADC
KSCADC Building, Kamalewsaram , Manacaud P.O. Thiruvananthapuram Pin-695009
GENERAL-BIF HDF - Upgradation of Government Regional Fisheries Technical and Vocational Higher Secondary School Beypore at Kozhikode district-Landscaping, Compound wall with gate, Storm water drainage-General Civil and Electrical Work
2026_SCADC_852687_1
ET-15/2026-27
Open Tender
Civil Works - Buildings
Item Rate
240 days
Beypore, Kozhikode District
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹50,000
21 Aug 2026
23 May 2026
1 Jun 2026
23 May 2026
30 May 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A : Landscaping | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.003 | OD13949/2024-2025:Engaging machinery for removal of earthen heap from the site including cutting of soil, getting out excavated soil, levelling the soil at site itself etc. complete as per the direction of Engineer in charge. | - | hour | - | - |
| 1.004 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.006 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 1 | cum | - | - |
| 1.007 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.008 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.009 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1440786.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TD150526.pdf
Tender Documents • 3.59 MB
BOQ_1440786.xls
BOQ • 0.32 MB
Drawing.pdf
Other Document • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].