| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC NULL | L1 | Accepted-AOC Lowest rate and hence the work is awarded to the contractor | |
| 2 | L2₹8.1 L+₹66,011 (8.92%)Rejected-AOC | L2 | Rejected-AOC Highest rate | |
| 3 | L3₹8.5 L+₹1.1 L (14.6%)Rejected-AOC KANNUR | KERALA | 670001 | L3 | Rejected-AOC Highest rate | |
| 4 | L4₹10.0 L+₹2.6 L (35.6%)Rejected-AOC | L4 | Rejected-AOC Highest rate |
Tender Value
₹10.3 L
EMD Value
₹25,851
Closing Date
25 May 2023, 5:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, Irrigation Sub Division, Thalassery
GENERAL Investigation Work Parapram Preliminary Investigation for construction of side Protection wall on either bank of Anjarakandy river near Parapram regulator in Kannur District. Investigation Work 1
2023_Irrig_576899_1
IRR/IA/TR/8597/2022_3_1_1/1
Open Tender
Civil Works - Others
Item Rate
90 days
Near Parapram Regulator
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹25,851
Yes
27 Jun 2023
17 May 2023
27 May 2023
17 May 2023
25 May 2023
17 May 2023
Amount
Investigation -Parapram
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.11.1:FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high "TBM" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.
56.14.a:Cross sectional details - River.
56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
60.11.8:SHIFTING OF PLANT- from bore holes to bore holes by head load including labour etc. complete.
OD33030/2022-2023:core box of size 150*27*5.3 cm(4 slots for each box) including packing of samples with proper cushioning to avoid further damage during transportation, loading, unloading cost etc. complete
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
Greeshma Nizy Eujine
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
KS JOSEPH
Bidder Name
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
KS JOSEPH
G S Infrastructure
Greeshma Nizy Eujine
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_851934.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .