Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹3.4 L
EMD Value
₹8,458
Closing Date
27 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
O/o Assistant Executive Engineer Electrical Irrigation Sub Division Aluva
GENERAL-AMC 2025-26-Fully Comprehensive Annual Maintenance Contract of Pallikkadavu and Mooriyamangalam LIS under Electrical irrigation section Kalady Electrical -General Electrical Work
2025_Irrig_811435_5
PWD/BLDG/10715/KLDY/2025-2026
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
10 documents required · 10 mandatory
₹750
₹8,458
17 Oct 2025
17 Oct 2025
29 Oct 2025
17 Oct 2025
27 Oct 2025
17 Oct 2025
Work Name:GENERAL-AMC 2025-26-Fully Comprehensive Annual Maintenance Contract of Pallikkadavu and Mooriyamangalam LIS under Electrical irrigation section Kalady -Electrical -General Electrical Work
3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 185 or equivalent suitable for 100 HP motor's fully automatic star delta starterYOD57310/2025-2026:Supply of electronic timer for FASD(L&T ST 80329000 ) or equivalentOD59394/2025-2026: Dismantling the existing damaged 200 dia Non Return Valvue, Supply, installation, testing and commissioning cast Iron double flange as per IS/5312 PN 1.6 rating complete with Bronze body & wedge Stainless Steel spindle, Gland packing, Rubber gasket 200mm dia Non Return Valve and returned the dismantled material into store as per the direction from the department staff.noô14.10:Providing and laying in position reinforced cement concrete 1 :2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in foundation of pump, DG set etc. including form work etc. as required (excluding reinforcement).cum Motor AMCqOD57320/2025-2026:Fully Comprehensive Annual Maintenance of up to 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor through o
the AMC period whenever necessary (excluding rewinding) repairs of vacuum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pump set, base plate all time during the period of contract and the faults should be rectified with in the time allowed.DayÅOD57322/2025-2026: Fully Comprehensive Annual Maintenance of 80 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . ÁOD57321/2025-2026: Fully Comprehensive Annual Maintenance of 100 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch gears as required, replacing the burnout fuse links, repair the damaged hinges replacing worn out beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . "OD57323/2025-2026:Fully Comprehensive Annual Maintenance of 100 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .(total two motors, 12 months for each motor)Motor Lifting WorksOD57304/2025-2026: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. ÿOD57302/2025-2026:Lifting the 80 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. ÓOD57303/2025-2026:Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. Rewinding±OD59469/2025-2026:Disconnect all electric connections from the motor , decoupling the motor from pump and remove the base bolts from motor and base plate and kept the motor at safe place , checking and testing the stator and rotor winding. power greater than 60 HP and up to 120 HP ,leading the motor to the nearest roadside using manpower, rope , chain, reaper etc. as required without getting damages to the motor, including loading into the vehicle and unloading at workshop for repairs and to and fro Conveyance., resetting the rewound motor, refitting the motor on the base plate, coupling with pump in correct alignment, giving wire connection , taking trial run on full load.ÕOD59491/2025-2026:Charges for rewinding the burnt rotor/stator - separate stater and rotor/stator, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new rotor/stator lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running(Less scrap copper)kg
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.36 MB
SBD.pdf
Tender Documents • 1.63 MB
NIT.pdf
Tender Documents • 0.03 MB
MAKE.pdf
Tender Documents • 0.29 MB
BOQ_1355091.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .