| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-Finance | L1 | Accepted-Finance 1st | |
| 2 | L2₹1.0 L+₹135.93 (0.13%)Accepted-Finance PUTHEN PARAMBIL HOUSE PATHIRICKAL P O PATHANAPURAM KOLLAM | KOLLAM | KERALA | 689694 | L2 | Accepted-Finance L2 | |
| 3 | L3₹1.2 L+₹11,256.47 (10.8%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.3 L+₹26,902.18 (25.8%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | MALANAD LABOUR CONTRACT CO OPERATIVE SOCIETY L3 | Baby Thomaskutty L2 | SREERAJ S L1 | Y GEORGE KUTTY L4 |
|---|---|---|---|---|---|---|---|
| 1.00Appendix-1: Construction of EPT (200 m) | |||||||
| 1.00 | OD115512/2026-2027:Earthwork in excavation of trench in ordinary soil by mechanical means/manual means, including setting out, removal of stumps and other deleterious matter, dressing of sides and bottom of the trench to the required shape and profile, including getting out and disposal of excavated earth lead up to 10 m from the edge of the trench, levelling and dressing of the disposed excavated soil, ensuring that no excavated material is heaped or stored along either side of the trench, so as to prevent obstruction to drainage or excavated material from falling back into the trench, complete as per the drawings and technical specifications, and as directed by the Departmental Officer-in-Charge. Lift upto 1.50 m(Data Reference: 2.6.1). Ordinary Soil | 750 | cum | 116.62 ₹87,465 | 105.38 ₹79,035 | 105.24 ₹78,930 Lowest | 130 ₹97,500 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 240 | cum | 108.75 ₹26,100 | 98.25 ₹23,580 | 98.13 ₹23,551.2 Lowest | 131 ₹31,440 |
| 1.00 | OD111509/2026-2027:Engaging labour for manually breaking hard rock where blasting is prohibited, including wedging, chiselling, dressing, collection and stacking of broken rock at site, complete as directed by the Engineer-in-Charge. The rate includes all labour, hand tools, chisels, crowbars, hammers, tool sharpening charges and all incidental charges necessary for completion of the work. (Reference: Spec. code-2.7.3) | 1.7 | cum | 1,040.76 ₹1,769.29 | 940.44 ₹1,598.75 | 939.19 ₹1,596.62 Lowest | 1,200 ₹2,040 |
Tender Value
₹1.4 L
EMD Value
₹3,474
Closing Date
31 Aug 2026, 5:00 pmClosed
DFO, Punalur
O/o DFO,Punalur
Constructing 200 m Elephant Proof Trench at Uppukuzhi area of Ambanar Forest Station under Pathanapurm Range during 2026-27-DPR PreparationWork
2026_FD_865859_1
63/2026-27
Open Tender
Civil Works - Others
Item Rate
15 days
Uppukuzhy area
Details attached
3 documents required · 3 mandatory
₹555
₹3,474
Yes
15 Oct 2026
18 Aug 2026
2 Sept 2026
18 Aug 2026
31 Aug 2026
18 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix-1: Construction of EPT (200 m) | |||||
| 1.001 | OD115512/2026-2027:Earthwork in excavation of trench in ordinary soil by mechanical means/manual means, including setting out, removal of stumps and other deleterious matter, dressing of sides and bottom of the trench to the required shape and profile, including getting out and disposal of excavated earth lead up to 10 m from the edge of the trench, levelling and dressing of the disposed excavated soil, ensuring that no excavated material is heaped or stored along either side of the trench, so as to prevent obstruction to drainage or excavated material from falling back into the trench, complete as per the drawings and technical specifications, and as directed by the Departmental Officer-in-Charge. Lift upto 1.50 m(Data Reference: 2.6.1). Ordinary Soil | - | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | - | cum | - | - |
| 1.003 | OD111509/2026-2027:Engaging labour for manually breaking hard rock where blasting is prohibited, including wedging, chiselling, dressing, collection and stacking of broken rock at site, complete as directed by the Engineer-in-Charge. The rate includes all labour, hand tools, chisels, crowbars, hammers, tool sharpening charges and all incidental charges necessary for completion of the work. (Reference: Spec. code-2.7.3) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1465336.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 7.21 MB
Pre26org.pdf
Tender Documents • 0.06 MB
epay.pdf
Tender Documents • 0.14 MB
BOQ_1465336.xls
BOQ • 0.23 MB
sb1.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .