Tender Value
₹9.9 L
EMD Value
₹10,000
Closing Date
1 Sept 2026, 6:00 pm3d left
Dy.Minicipal Commissioner - West Zone
Providing and fixing New CI Catch Pit jali instante of Old Catch pit and also Other TP road CP in Navarangpura ward West Zone.
338541
2/26-27 (T.N.57)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹10,000
25 Aug 2026
25 Aug 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
2. Tender Estimated Cost Rs.9,92,584.00 (exclusive of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (Rs.10,000/-)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.900.00
6. Time-Limit 12 months
7. Validity Period 120 Days
(i) Last Date of Online Submission
a) In Sealed cover in duplicate copies by Registered
(ii) Mode of Sending Post A.D, or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening Dt. 2.9.2026 , 15:00 hrs.
Submission of EMD. Tender fee and other Documents during office
Place of Submission & Opening of
10. hours: On date. 2.9.2026 & 12:00 hrs West Zone, 2nd Floor, A.M.
Tender Office, Dr. Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
11. Penalty Due to Delay of work Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
Lakhs) but not more then 10% of bill
12. Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
Time permitted to start parts of to start the works within 48 hours of intimation of work.
work Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
as above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
14. ftuLx[t¾xhlu «J<obtl GST yjd&e åþfJJtbtk ytJNu
The staff of the contractor shall wear safety jackets, shoes,
helmets etc. while on duty and any violation will attract a fine of Rs.
5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out the
works without proper precautions/safety measures as required will
attract a fine of Rs. 5,000/- for each incident.
Contractor's Sign Addl.C.E.(west zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl - vrùbÍtul
y.Bgw.ftu. Ítul Ítulj ytuVem,
ztuo.hbKCtE vxuj CJl, WMbtlÃþht ath hM<t vtmu, ybœtJtœ. vrùb Ítul xuLzh ltuxem
lk-02/2026-27 btk ytJhe juJtguj ftbtule ÂJd<
1. Wvhtuf< xuLzhtu su btLg hSMx[uNl ^htJ<t ftuLx[t¾xh©eytuyu ztWljtuz fhe ChJt.
2. yt xuLzhtu zwÃjefux ftuveytu mt&u Chelu Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk
btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, xuLzh ftuve <&t yLg vwhtJt mt&u
yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu. su ftuLx[tfxh©eytuyu
hSMx[uNl heLgw fhtJuj l ntug.
4. ftuLx[tfxhtuyu xuLzhbt cukfl wltb, Ft<t lkch, btEfh lkch ylu mhltBþ MvÐ yûthu jFÔþ.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t
Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<&t btuctRj lkch yJ~g jFJtltu hnuNu.
ftuLx[t¾xhu vtu<&t ze.ze. xuLzh R~gw > <theF ct>lt s ytvJt.
10. Nh<e xuLzh hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bkswhe ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ œhuf
12. xuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrl.rmvj frb§h©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykdu xuLzh Ch<t vnujt AuÕju r>Jmu rlg< JucmtEx y&Jt fauheyu sYhe <vtm
fhelu s xuLzh btufjÔþk.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mw^ele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/
vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. mœh xuLzhbtk " GST rlgb Bþsc jtøþ vzNu. " <u Bþsc dKºte fhe xuLzh ChJtlt hnuNu.
zebtLz z[tVx / auf “Bgwrlrmvj frb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
As per Government of Gujarat G.R.No.- EMD/10/2021/7729/DMO Dt.28/06/2021 & Circular of
Finance Department, AMC No.41, Date: 08/02/2022, approved Banks are...
(A) Guarantee issued by following banks will be accepted as SD/EMD on permanent basis. All
nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to
March- 31, 2022. The validity cut-off date in the GR is with respect to the date of issue of
Bank Guarantee irrespective of the date of termination of Bank Guarantee.
1 Commercial Banks :-
5. Kotak Mahindra Bank
6. IndusInd Bank
8. Tamilnadu Mercantile Bank
9. Ujjivan Small Finance Bank
10. A U Small Finance Bank
11. Federal Bank
12. Equitas Small Finance Bank
13. Bandhan Bank
14. Standard Chartered Bank
15. City Union Bank
2 Co-operative and Rural Banks Of Gujarat :-
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, Bþsc <btb
«fthle fLMx[¾Nlle yu¾xeJexebtk BþÏg ftuLx[t¾xh, mc ftuLx[t¾xhlt su bswhtu ftbdehe fh<t
ntug <u <btb bswhtuLþk øþsht< rcÕz´d yuLz y^h fLMx[¾Nl Jfombtk hSMxuNl fhtJÔþ
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (WEST ZONE)
Work Name :- Providing and fixing New CI Catch Pit jali instante of Old Catch pit and also Other
TP road CP in Navarangpura ward West Zone.
Sr. No. Item Discripation Say Qty. Rate Per Amount
Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including
demolishing the asphalt carpet, metal,s
oiling/cutting Reinforcement etc.comp. with
stacking the material as directed. (Based on
Previously approved rate by C E sir )
up to 0.20 meter thickness (By Manual) 25.00 71.10 Smt
0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc
Box cutting the road surface to proper slope
and camber for making a base for road work
2 including removing the excavated stuff and
depositing on the road side slope as directed
upto 200 Mt.lead.
Conveyance charge of earth, lime, murrum,
building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any
3 kind executed outside the road site. Rate also
includes spreading & levelling etc complete.
Internal conveyance above 50 mt done within
the work site is not payable.
e) Lead From 4 Km to 5 Km. 50.63 52.42 Cmt
f) Lead From 5 Km to 10 Km. 40.00 78.54 Cmt
Providing and laying cement concrete 1:3:6
(1- Cement : 3- Coarse sand : 6- Hand broken
4 stone aggregates 40mm nominal size) and
curing complete.
Brick work using common burnt clay building
bricks having crushing strength not less than
5 35kg./Sq.Cm. In foundation and plinth in
Cement Mortar 1:5.(1-Cement: 5 -fine
sand)(B) Conventional.
Providing15mm thick cement plaster in single
coat on Rough (Similar) side of single or half
6 brickwalls for interior plastering upto floor
two level and finished even and smooth in (i)
Cement mortar 1:3 (1-cement:3-sand) 18.00 101.25 Sqm
Repairing damaged M.H. and rasing M.H. up
to road level incl. removing damaged brick
work and repairing by brick masonry in C.M.
1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and existing MH sheet cover, removing
the debris from MH and carting the same as
up to 0.15 mt. (@ Two Coarse) 820.00 No. 15.00 728.82 No.
up to 0.35mt. (@ Four Coarse) 1300.00 No 15.00 1155.44 No.
Repairing damaged I.C./ Raising removing
damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3
and fixing C.I. steps and existing chamber
sheet cover, removing the debris from
chamber and carting the same as directed.
Providing and laying cement concrete work
1:2:4 (1- Cement : 2- Coarse sand : 4- graded
stone aggregates 20 mm nominal size) and
curing complete excluding cost of formwork
9 and reinforcement for reinforced concrete
work in (A) Foundations, footings, Base or
columns and Mass concrete
Structural steel work ( Confirming to IS 4923-
1997) riveted, bolted or welded in builtup for
all type sections, in framed work, including
cutting, hoisting, fixing in position and
10 applying a priming coat of approved steel
primer all complete as per the structural
designs and directions of Engineer in
charge.Column(122x 61 x 3.6mm )
Hiring of Tractor with trolley considering
11 Hrs. As working Day hours inclu. Driver 30.00 2104.09 day
Supplying, labour for excavation of all types
of soil at any depth including excavation of
asphalt pavement of any thickness,
demolition of brick work in CM of any
proportion including stacking of serviceable
materials and disposal of unserviceable
material etc. comp. as directed.
Mazdoor at day /night (As per min.wages
circular of GOG)
Raising of Existing manhole. Item includes,
cutting of existing road surround by Manhole
by dimond cutter machine, dismantling of
road in confined area by breaker machine
and carting of dismantled material. Item also
included necessary brick work to raise the
manhole at road level in CM 1:3. Item also
included fixing of Manhole frame at exact
road level by using MasterEmaco S
trowelable fibre reinforced thixotropic repair
13 mortar material, Laying of concrete made
from MasterEmaco S 346 flowable micro
concrete material in desired thickness and
laying of hot mix bituminous material in
upper layer and compaction of hot mix
bituminous material by Plate compactor
machine. Rate also included necessary plaster
at inside of manhole in CM 1:3 in 20 mm
thickness on raised brickwork.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Hereinafter called “the Employer”)
invites sealed Tender document from reputed and qualified bidders for the construction of
Works detailed in the Table below:-
Sr.No Name of Works Approximate Bid Security Completio n
value of works (Rs.) Period
1 Providing and fixing New CI 9,92,584.00 10,000/- 12 Month
Catch Pit jali instante of Old
Catch pit and also Other TP
road CP in Navarangpura
ward West Zone.
2. Tender (a complete set of bidding document) fee shall be Rs.900/- in the form of Demand
Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER,
Ahmedabad, payable at Ahmedabad, which shall be non refundable. The fees shall be paid at
the time of submitting the tender.
3. Interested bidders shall download the tender documents from website
http://amc.nprocure.com and http://nprocure.com. tender fee as mentioned in clause 2 above
shall be paid by the bidder at the time of bid submission.
4. All bids must be accompanied by Bid Security of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL
CORPORATION, Ahmedabad. Bid Security will have to be in any one of the forms as
specified in Clause of ITB (Instructions to Bidders).
5. All Bids must be delivered to Assistant Manager " West Zone, Zonal Office", Dr.Ramanbhai
Patel Bhavan Ushmanpura,Ahmedabad. Not later than 12:00 hrs on Dt.21 /09 /2023.
Seal and Signature of the Bidder Addl. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals
shall only apply. Contractor can not stop the work due to on availably of labour force. In case
progress is delayed, contractor shall be penalized 0.1% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate
bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest
to the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer-in-charge in this
regard shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the
material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on site
or materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-
23. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stone at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the
particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion
of the structure.
29. All necessary safety measures and precaution (including those laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men, materials and
machinery on the works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar
days (120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall
furnish to the Corporation Security Deposit of 5% (Five Percent) of the contract price cheque or
Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 month period after the order to start the works. Progress of work
should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall
be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the
rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make
his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if
item is not available in SOR than based on current market rates. In case of extra item decision of
Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will
be fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work
the penalty of Rs.- (As per Form - B1) per day of delay shall be recovered from the immediate bills
payable to the contractor. Contractor has to make his own arrangement for procurement of steel and
Contractors should note the following conditions carefully:-
1. Conditional tender shall not be accepted.
2. All tenders are to be submitted in duplicate without which the tenders are liable to be
3. In case of tender downloaded from website, tender fee & EMD should be submitted in form
of demand draft or in cash.
4. Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept.
- Govt. of Gujarat booklets of Building Works & and Road Works Specifications published
by Gujarat Book Depot, Sector-21. Gandhinagar. CONTRACTOR'S SIGNATURE
ADDL.CITY ENGINEER & STAMP ( West Zone) Mobile No.:-
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child
Labour Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide
lines and as per the guide lines. If child labour is employed on the site work, the contractor
shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour
welfare fund. If the employer refuses to deposit then action will be taken for contempt of
Supreme Court Judgement and also will be prosecuted by concerned authority. Because of
the breach of any provision of child labour prohibition and regulation Act 1986 by the
Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as
per its Reso. No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently
decided that the actual testing charge is taken and the remaining amount is refundable at the
time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register
acordingly,and has to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim
shall be entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be
made by A.M.C. The same shall be placed on A.M.C website which may be downloaded by the
tendrers enclosed along with the tender duly signed. These shall form a part of tender. The tenderer
shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM / CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the
part of the contract documents. The full consideration shall be given to such addendum or
corrigendum or correction before submission tender duly filled in by the contractor. Therefore, the
contractor shall have to watch such addendum or corrigendum or correction published by A.M.C
through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and
enclose the same with the tender documents,failing which the tender shall be liable for rejection and
no any complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNI CIPAL CORPO RATI ON ENGI NEER DEP ARTMENT
NAVRANGPURA WARD
TECHNICAL SPECIFICATION
Name of Work ;- Providing and fixing New CI Catch Pit jali instante of Old Catch pit and also
Other TP road CP in Navarangpura ward West Zone.
General Technical Specification Section
Following technical specifications shall be applicable to the relevant items of BOQ
Extra rate over item of excavation of earth for excavation of asphalt pavement /
RCC of thickness up to 0.20 meter including demolishing the asphalt carpet, metal,
soiling/cutting Reinforcement etc. comp. with stacking the material as directed.
(a) up to 0.20 meter thickness (By Manual)(b) 0.20 to 0.30 meter (By any type of
Breaker Machine or R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete.(c) 0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including cost of operator, fuel, & transportation
The Item shall be carried out as per Item description and as per instruction of Engineer-in-
Charge and/or his authorized representative.
The rate includes the cost of excavation of bituminous macadam i.e. bituminous layers
only like DBM, BC etc including the labours, tools, equipment and all other incidental
expenses. Non Bituminous Sub-layer/Sub base are not considered in this item.
Work shall be carried out manually or by Machinery
as per site requirements. The mode of payment for
this item shall be on Smt. Basis.
Box cutting the road surface to proper slope and camber for making a base for road
work including removing the excavated stuff and depositing on the road side slope
as directed upto 200 Mt.lead.
Any soil which generally yields to the application of pickaxes and shovels, spades,
rakes or any such ordinary excavating implement or organic soil, gravel, silt, sand turf
loam, clay, peat etc. falls under this category. For materials and workmanship for
earthwork and excavation, relevant specification IS: 3764 & IS 1200 (Part I) shall be
To protect persons from injury and to avoid damage to property, adequate
barricades, construction signs, red lanterns and guards as required shall be placed and
maintained during the progress of the construction work and until it is safe for the traffic
to use the roadways. The relevant Indian standards and the rules and regulations of
local authorities in regards to safety provisions shall be observed.
The depth of the excavation shall be as required. The site shall be cleared and all
obstructions, loose stones, materials and rubbish of all kind, bush; wood and all type
trees shall be removed, as directed. The materials so obtained shall be the property of
AMC and shall be conveyed and stacked as directed, within 50-m. lead. The roots of the
trees coming in the sides of the trenches shall be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest
Authority / Municipal Commissioner, before cutting shall be cut after obtaining such
permission from them. The rate of site clearance is deemed to be included in the rate of
The excavation shall be carried out in true line and level and having width and
depth, as shown in the drawings or as directed. The Contractor shall do the necessary
shoring and strutting or shall provide necessary slopes to a safe angle or steps, as
required or directed, at his own cost. No extra payment shall be made for such
precautionary measures, taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely, as directed, by removing excess soil and watering, as
required. No earth filling will be allowed for bringing it to level, if by mistake or any
other reason, excavation is made deeper or wider than shown on the drawings or as
directed. The extra depth or width shall be made up with sand filling, as specified for the
bottom level of the subsequent finishing at the cost of the Contractor or as directed by
Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision
of supporting all utility services, lighting the excavated areas, separating and stacking
serviceable materials nearly, shoring, timbering, strutting, bailing out water either sub-
soil or rainwater, including pumping at any stage of the work. all Excavation work must
executed with manual labour only.
4.2. Precautions :
The blasting operation shall remain in charge of competent and experienced supervisor
and workman who are thoroughly acquainted with the details of handling explosives and
blasting operations. The blasting shall be carried out during fixed hours of the day,
preferably during the mid-day-lunch hours or at the close of the work as ordered in
writing by the Engineer-in-charge. The hours of blasting shall be notified in advance to
the people in the vicinity. All the charges shall be prepared by the man in charge only.
Red danger flags shall be displayed prominently in all directions during the blasting
People except this who actually light the fuse shall be prohibited from entering into this
area. The flag shall be stationed as 200 m. from the firing site in all directions and all
persons including workmen shall be excluded from the flagged area at least 10 minutes
before the firing warning whistle being sounded for this purpose.
During excavation in rock by blasting, the lowest 15 cm. of the stratas shall be blasted
with light charges so as not to shatter or weaken the underlying rock on which the
foundation will be actually laid. If excavation in rock is done to larger width and lengths
than those shown on the drawings or as directed, no payment shall be made for such
over break. If excavation is done to depth grater than shown on the drawings or
directed, excess depth shall be made up with foundation grade concrete as directed at
the contractor’s cost.
The charged hole shall be drilled to the required depth and in suitable places when
blasting Is done with powder, the fuse cut to the required length shall be inserted in the
holes and the powder dropped in. The powder shall be gently tamped with copper rod
with rounded ends. The explosive powder shall then be covered with trapping materials
which shall be tamped lightly but firmly. When blasting is done with dynamite and other
high explosive dynamite cartridges shall be prepared by inserting the square cut ends of
fuse into the detonator, and finished with dippers at the open ends. The detonator
should be gently pushed into the premier leaving one third of the copper exposed
outside. The primer shall be housed into the explosive. Bore holes shall be of such size
that the cartridges can be easily passed down. The primer shall be cleared of all debris
and explosive inserted. The space for about 20 cms. above the charge shall then be
gently filled with dry clay pressed home and rest of the tamping is firmed with any
convenient materials gently packed with a wooden cover.
At a time, not more than 20 such charges shall be prepared and fired. The man in
charge shall blow a whistle in a recognised manner for cautioning the people. All the
people shall then be required to move to safe distances. The charges shall be lighted by
the man in charge only. The man-in-charge shall count the number of explosions. He
shall satisfy himself that the charges have been exploded before allowing the workman
to go to the work site.
The contractor shall be fully responsible to strictly follow the prevailing rules and
procedures regarding blasting procedures.
In case of a misfire the following procedure shall be observed :
Sufficient time shall be allowed to account for the delayed blast. The man in charge shall
inspect all the charges and determine the missed charge.
If it is the blasting powder charge, it shall be completely flooded with water. A new hole
shall be drilled at about 45 cm. from the old and fired. This should blast the old charge.
Should it not blast the old charge. Should it not blast the old charge, the procedure shall
be repeated till the old charge is blasted.
In case of charge of gelatin, dynamite etc. the man in charge shall gently remove the
tamping and the primer with detonator. A fresh detonator and primer shall then be used
to blast the charge. Alternatively the hole may then be drilled 15 cm. away and parallel
to it. This hole shall then be charged fired when the misfired hole should explode at the
same time. The man in charge shall report to the office at once all cases of misfire, the
cause of the same and what steps were taken in connection therewith.
If a misfire has been found to be due to defective detonator or dynamite, the whole
quantity in the box from which defective article was taken must be sent to the authority
as directed for inspection to ascertain whether all the remaining materials in the box are
also defective or not.
4.3. Accidents :
The contractor shall be solely responsible for any accident during the entire procedure of
handling explosive and blasting and shall pay necessary compensation to persons
affected or damage t lands or properly etc., due to the blasting without extra claims on
the department.
A careful and day-to day account of explosives shall be maintained by the contractor in
an approved manner and shall be open to inspection of the Engineer-in-charge at all
times. Surprise visit may also be paid by the Engineer-in-charge to the storage and in
case of any unaccountable shortage or unsatisfactory accounting, the contractor shall be
liable to be penalised by forfeiture of part or whole of his Security Deposit or by
cancellation of tender in which case be shall not be entitled for any compensation.
4.5. Disposal of Excavated materials :
No materials excavated from foundation trenches of whatever kind they may be, are to
be placed even temporarily nearer than1.5m. of distance prescribed by the Engineer
from the outer edges of excavation. All materials excavated shall remain the property of
Government. Rate for excavation includes sorting out of useful materials and stacking
them separately as directed within the specified lead. Materials suitable and useful for
back filling or other use shall be stacked in convenient places but not in such a way as to
obstruct free movement of men, animals and vehicles or encroach upon the area
required for constructional purpose. The site shall be left clean of all debris on
Disposal of excavated materials is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off
within a lead of 50 meters as directed. useful materials obtained from clearing site and
excavation shall be stacked within a lead of 50 M. beyond the building area as directed.
Materials suitable for back filling shall be stacked at convenient places within a lead of
50 M. from the structure for reuse. Useful stones from rock excavation shall be stacked
neatly within a lead of 50 M. and will be allowed to be used by the contractor on
payment at rates laid down in the contract or if not so aid down, at schedule of rates of
the Division or at a mutually agreed rates if there are no such rates in the Schedule of
If surplus materials are required to be conveyed beyond 50 M. conveyance will be paid
for under a separate item.
4.6. Mode of measurement and payment :
The work shall be measured for the work limited to the dimensions shown on drawings
or directed, Excavation to dimensions in excess of the above will not be measured or
paid for and if so ordered by the Engineer the contractor shall have to fill up the excess
depth with cement concrete specified for foundation without extra payment.
Driving of sounding bards, drill holes to explore the nature of substratum upto a total
length of meter distributed in 2 or 3 places in each foundation if necessary, will be
considered incidental work and eill not be paid for separately.
Removal of slips and blows in the foundation trenches will not be measured or paid for.
If it is necessary in the opinion of the Engineer-in-charge to carry foundation below the
levels shown on the plants the excavation for the first 1.5 M. of additional depth will be
included in the quantity for the particular classification and will be paid for as extra work
at rate to be decided under the general conditions of contract unless the contractor
unless the contractor is willing to accept payment as tendered rates.
The rate shall be for a unit of one cubic meter.
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage,
sludge, excavated rock, fly ash, aggregates of any kind Including spreading &
levelling etc. complete.
e) Lead From 4 Km to 5 Km.
f) Lead From 5 Km to 10 Km.
All the surplus earth etc. shall be carried away immediately from the site of work
to a place within 5km.distance or as directed and ordered by the Engineer, so as not
to cause any inconvenience to the public traffic finding which in view of public safety
and traffic convenience. The corporation shall carry out the work byany other
agency at the contractor’s risk and cost. If the instructions are not completed within
days from the date of order to cart the surplus materials and clear the site, the
said work shall be carried out by the Municipal Corporation at the risk and cost of
the contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be
done and the same shall be carried out by the contractor without asking any extra
rate. The contractor shall have to cart the surplus earth after the trenches we will
watered and refilled with the sand. The rate of carting including carting of brickbats,
metal, rubble vegetable and garbage, if necessary to clear the road surface.
The rate shall be for a unit of one cubic meter.
Measurements for Payment
The rate shall be for a unit of one cubic meter.
Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6- Hand
broken stone aggregates 40mm nominal size) and curing complete.
Before starting the concrete the bed of the foundations trenches shall be cleared
of all loose materials and watered and rammed as directed .
The proportion of cement, sand and coarse aggregate shall be one part of
cement, 3 parts of sand, 6 parts of stone aggregates and shall so measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand
mixing may however be allowed for smaller quantity of work if approved by the
Engineer-incharge. When hand mixing is permitted by the Engineer-in-charge incase of
breakdown of machinery’s and in the interest of the work. it shall be carried out on a
water tight platform and care shall be taken to ensure that mixing is continued until the
mass is uniform in colour and consistency. However in such cases 10% more cement
than otherwise required shall have to be used without any extra cost. The mixing in
mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of water shall
be sufficient to produce a dense concrete of required workability for the purpose.
The concrete shall be handled from the place of mixing to the final position in not
more than 15 minutes by the method as directed and shall be placed into its final
position, compacted and finished within 30 minutes of mixing with water i.e. before the
setting commences.
The concrete shall be laid in layers of 15 cms. to 20 cms.
The concrete shall be rammed with heavy iron rammers and rapidly to get the
required compaction and to allow all the interstriees to be filled with mortar.
After the final set, the concrete shall be kept continuously wet, if required by
pounding for a period of not less than 7 days from the date of placement
The concrete shall be measured for its length breadth and depth, limiting
dimensions to those specified on plan or as directed.
The rate shall be for a unit of one cubic meter.
Brick work using common burnt clay building bricks having crushing strength not less than
35kg./Sq.Cm. In foundation and plinth in Cement Mortar 1:5.(1-Cement: 5 -fine sand)(B)
Bricks used in works shall confirm to the relevant Indian Standards. They shall
be sound, hard, homogenous in texture, well bunt in kiln without being vitrified, table
moulded, deep red, cherry or copper coloured, of regulator shape and size and shall
have sharp and square edges and parallel faces. The bricks shall be free from pores,
chips, flaws or humps or any kind. Bricks containing unground particles and / or which
absorb water more than 1/6th of their weight when soaked in water for twenty-four
hours shall be rejected. Over-burnt or under-burnt bricks shall be liable to rejection.
The bricks shall give a clear ringing sound when struck and shall have a minimum
crushing strength of 35 Kg/sq. cm. Unless otherwise noted in drawings. The classes
and quality requirements of bricks shall be as laid down in IS :
The size of the brick shall be 23.0 x 11.5 x 7.5 cm unless otherwise specified; but
tolerance upto (+/-) 3 mm in each direction shall be permitted. However, bricks
conforming in size to IS : 1077 could be used. Bricks shall be provided with frogs. Only
full size bricks shall be used for masonry work. Brick bats shall be used only with the
permission of the Engineer to make up required wall length or for bonding. Sample
bricks shall be submitted to the Engineer for approval and bricks supplied shall conform
to approved samples. If demanded by Engineer, brick sample shall be got tested as per
IS : 3495 by Contractor at no extra cost to Client. Bricks rejected by Engineer shall be
removed from the site of works within 24 hours.
Mortar for brick masonry shall be prepared as per IS : 2250 Mix for cement
mortar shall be specified in the respective items of work. Gauge boxes for sand shall
be of such dimensions that one completed bag of cement containing 50 kg of cement
forms one unit. The sand shall be free from clay, shale, loam, alkali and organic matter
shall be of sound, hard, clean and durable particles. Sand shall be approved by
Engineer, sand shall be thoroughly washed till it is free of any contamination.
For preparing cement mortar, the ingredients shall first be mixed thoroughly in
dry condition. Water shall then be added and mixing continued to give a uniform mix
of required consistency. Cement mortar shall preferably by machine mixed, though
hard mixing in a thorough manner may be allowed. The mortar so mixed shall be used
within 25 minutes of mixing. Mortar left unused in the specified period shall be
The Contractor shall arrange for test on mortar samples if so directed by the
Engineer. Re-tempering of mortar shall not be permitted.
13.2 Workmanship
All bricks shall be thoroughly soaked in clean water for at least one hour
immediately before being laid. The cement mortar for brick masonry work shall be as
specified in the respective item of work. Brick work 230 mm thick and over shall be
laid English Bond unless otherwise specified. 115 mm thick work shall be laid with
stretchers. For laying bricks a layer of mortar shall be spread over the full width of
suitable length of the lower course. Each brick shall be pressed into the mortar and
shoved into final position so as to embed the brick fully in mortar. Bricks shall be laid
with frogs uppermost.
All brickwork shall be plumb, square and true to dimensions sown. Vertical joints
in alternate courses shall come directly one over the other and be in line. Horizontal
courses shall be levelled. The thickness of brick course shall be kept uniform. For walls
of thickness greater than 230 mm both faces shall be kept in vertical planes. All
interconnected brickwork shall be carried out at nearly one level (so that there is
uniform distribution of pressure on the supporting structure) and so portion of the work
shall be left more than one course lower than the adjacent work. Where this is not
possible, the work shall be racked back according to bond (and not saw toothed) at an
angle not exceeding 45 degree. But in no case the level difference between adjoining
walls shall exceed 1.25 m. Workmanship shall conform to IS :
Bricks shall be so laid that all joints are well filled with mortar. The thickness of
joints shall not be less than 6 mm and not more than 10 mm. The face joints shall be
raked to a minimum depth of 10/15 mm by raking tools daily during the progress of
work when the mortar is still green, so as to provide a proper key for the plaster or
pointing to be done. When plastering or pointing is not required to be done, the joints
shall be uniform in thickness and be struck flush and finished at the time of laying. The
face of brick work shall be cleaned daily and all mortar droppings removed. The
surface of each course shall be thoroughly cleaned of all dirt before another course is
laid on top. If the mortar in the lower course has begun to set, the joints shall be
raked out to a depth of 12 mm before another course is laid.
All brick work shall be built tightly against columns, floor slabs or other structural
Where drawings indicate that structural steel columns are to be fireproofed with
brickwork, the brick shall be built closely against all flanges and webs with all spaces
between the steel and brickwork filled with mortar. Steel members partly embedded in
brickwork and not indicated to be fireproofed with concrete, shall be covered with nor
less than 12 mm thick mortar unless directed otherwise by Engineer.
Miscellaneous inserts in masonry e.g. sleeves, wall ties, anchors, conducts,
structural steel, steel inlets etc. shall be installed by the Contractor at no extra cost to
the Owner. Furnishing of any of these inserts by the Contractor, will be paid for
separately. Openings, arches etc. shall be provided as shown on the drawings.
Chases, pockets etc. shall be provided as shown on the drawings to receive windows,
louvers, doors frames etc. Wall ties and flashings shall be built into the brickwork in
accordance with the drawings and specifications. It shall be clearly understood that the
rates quoted by the Contractor include for fixing of inserts, leaving openings, cutting
chases in brickwork for various trades etc.
13.3 Facing Brickwork
Facing bricks of the type specified shall be laid in the positions indicated on the
drawings and all facing brickwork shall be well bonded to the backing bricks. No facing
brickwork shall at any time be more than 600 mm above the backing brickwork.
All facing brickwork shall be pointed as the work proceeds and internal faces of
the brickwork shall be pointed with neat flush joint to give a fair face.
Faced work shall be kept clean and free from damage, discoloration etc. at all
times. The Contractor shall fill carefully all holes with bricks similar to the surrounding
brickwork, point brickwork as required.
For facing brickwork, double scaffolding shall be used no holes in brickwork for
scaffolding shall be permitted.
The green work shall be protected from rain by suitable covering bricks shall be
kept constantly moist on all faces for a minimum period of ten days. Brickwork shall
not be raised more than one metre per day.
The rates quoted by the Contractor are exclusive or transoms and mullions.
Contractor shall provided the same as shown or indicated on the drawings. These shall
be generally provided only in half and full brick walls. Dimensions of the transoms and
mullions shall conform to the thickness of the wall. Concrete work for transoms and
mullions shall conform to the specifications for concrete and shall be of grade M200.
Where shown on the structural drawings, bricks for partitions walls shall be
stacked adjacent to the structural member to pre deflect the structural member before
the wall is built.
13.4 INSERTS, BOLTS ETC.
Inserts, bolts etc. shall be provided in masonry and concrete works as indicated
on the drawings. It is imperative that all inserts, bolts, fixtures and fittings shall be
provided in their position very accurately. If the Engineer directs that such inserts and
bolts be fixed by use of templates, the Contractor shall make arrangements for
providing such templates. If as a consequence of negligence on the part of the
Contractor, the inserts, bolts, fixtures, fittings etc. are out of alignment, the Contractor
shall make arrangement to have the inserts and bolts removed and refixed in their
proper position as directed by the Engineer, at no cost to the Owner.
13.5 CEMENT POINTING
The joints of masonry shall be raked atleast 12 mm deep. 3 or 4 days after the
courses are laid if not done earlier. The dust shall then be brushed out of the joints and
the wall, washing with water.
The mortar shall consist of one part of cement to one part of fine sand. Mortar
shall filled into joints and well pressed with special steel trowels. The joints hall not be
touched again after it has once begun to set.
The joints of the pointed work shall be neat. The lines shall be regular and
uniform in breadth and the joints shall be raised, flat, sunk of ‘V’ as may be directed.
No false joints shall be allowed.
The work shall be kept we for a after the pointing is complete. Whenever
coloured pointing has to be done, the colouring pigment of the colour requirement shall
be added to cement in such proportion as recommended by the manufactures and as
approved by the Engineer.
Mode of measurement shall be on Cmt basis.
Providing15mm thick cement plaster in single coat on Rough (Similar) side of single or half
brickwalls for interior plastering upto floor two level and finished even and smooth in (i)
Cement mortar 1:3 (1-cement:3-sand)
All joints in masonry shall be raked to a depth of 12 mm with a hooked tool made
for the purpose when the mortar is still green and in any case within 48 hours of its
laying. The surface to be rendered shall be washed with fresh clean water free from all
dirt, loose plastering work is commended. Concrete surfaces to be rendered will
however be kept dry. The wall should not too wet but only damp at the time of
plastering. The damping shall be uniform to get uniform bond between the plaster and
the wall. Cement shall be OPC for the whole work above and below ground level.
The proportion if the mortar shall be as specified under the respective items of
work. Cement shall be mixed thoroughly in dry condition and then just enough water
added to obtain a workable consistency. The quality of water, sand and cement shall be
as per IS : Standards. The mortar thus mixed shall be used immediately and in no case
shall the mortar be allowed to stand for more than 25 minutes after mixing with water.
Cement be conformity to IS : 12330 OPC for the whole work above and below ground
Curing of plaster shall be started as soon as the applied plaster has hardened
enough so as not to be damaged. The decision, as to when the plaster has hardened,
will be given by the Engineer. Curing shall be done by continuous applying water in a
spray and shall carried out for atleast 7 days.
Whenever the specifications or the item of work calls for water proofing, the
Contractor shall provided the percentage of water proofing compound as specified in the
Where lath plaster is specified, it shall be paid for at the same rate as for
plasterwork without metal lath except that separate payment for metal lath will be
Ceiling plaster shall be done before wall plaster and wall plaster shall commence
at top and work downwards.
9.1 Interior plaster -
This plaster shall be laid in a two coats of 12 and 8 mm for 20 mm and single
coat for 15 mm & 10 mm thickness. The mortar shall be dashed on the prepared
surface with a trowel and finished smooth by trowelling on the surface with neeru (lime
cream). Neeru shall be properly slaked fat lime. The standard of finish expected is high
and shall conform to IS : 2394. Interior plaster shall be carried out on jambs, lintel and
sill faces, top and undersides etc. as shown in the drawing or as directed by the
Engineer. Rate quoted for plasterwork shall be deemed to include plastering of all those
surfaces. However, if the item of work includes plaster finish, no separate payment
would be made under ‘plastering work’.
9.2 Exterior Plaster –
Exterior plasterwork shall be carried out in 2 layers. The first layer being 12 mm
thick and the second layer being 8 mm thick. The first layer shall be dashed against
the prepared surface with a trowel to obtain as even surface. The second layer shall
then be applied and finished leaving as even and uniform surface, trowel finished unless
otherwise directed by the Engineer.
Exterior Sand Faced Plaster – The plaster shall be applied in 2 coats. The first
coat or the scratch coat should be approximately 12 mm and shall be continuously
carried be without break to the full length of wall or natural breaking points such as
doors, windows etc. The scratch coat shall be dashed on the prepared surface with
heavy pressure, brought to true and even surface and then lightly roughened by cross
scratch lines, to provide bond for the finishing coat. The mortar proportion for this
scratch coat shall be as specified in the respective item of work. The scratch coat shall
be cured for atleast 7 days and then allowed to dry.
The second coat shall be 8 mm thick and it shall not be applied until atleast
days have elapsed after the application of the scratch coat shall be evenly damped.
This coat shall be applied from top to bottom in one operation and without joints, finish
shall be straight, true and even. The mortar proportions of this coat shall be as
specified under the respective item of work. Only approved white sand shall be used
for the second coat and for finishing work. Sand for finish shall be used for the second
coat and for finishing work. Sand for finish shall be even coarse size and shall be
dashed on the surface and sponged.
Wherever 32 mm thick plaster has been specified, this is intended for purpose of
providing beading, bands etc. This work should be carried out in two or three layers
and as directed by the Engineer.
In the case of pebble face finished plaster, pebbles of approved size and quality
shall be dashed against the final surface to obtain as far as possible uniform pattern.
In all cases, workmanship shall conform to IS :
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged
brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing MH sheet cover, removing the debris from MH and
carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
(D) up to 0.905mt. (@ Four Coarse)
This is item pertaining to leveling MH cover. Existing manhole should be remove
property and carefully from its original level also exi. Asphalt should be removed and
stacked the excavated asphalt here by also removed top brick masonary layer as dire.
So as to get proper bonded between old masonary; and new masonary with a good
quality of brick one to there layer masonary in properly 1:5 incl. and plaster in C.M. 1:3
and fixing C.I. steps curing etc. comp. Also provided and fixing old manhole with seat
in c.c. prop 1:2:4. This MH should be properly leveled and with road level etc. comp.
Mode of measurement shall be on No. basis.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by
brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing
chamber sheet cover, removing the debris from chamber and carting the same as
directed. (Based on DrainageSOR 2009-10)
This is item pertaining to leveling I.C./C.P. cover. Existing Catchpit/Chamber
should be remove property and carefully from its original level also exi. Asphalt should
be removed and stacked the excavated asphalt here by also removed top brick
masonary layer as dire. So as to get proper bonded between old masonary; and new
masonary with a good quality of brick one to there layer masonary in properly 1:5 incl.
and plaster in C.M. 1:3 and fixing C.I. steps curing etc. comp. Also provided and fixing
old manhole with seat in c.c. prop 1:2:4. This IC/CP should be properly leveled and with
road level etc. comp.
Mode of measurement shall be on No. basis.
Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4- graded
stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations, footings, Base or columns
and Mass concrete
Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) and curing complete excluding cost of
formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base
or columns and Mass concrete
Mode of measurement shall be on cmt basis.
Structural steel work ( Confirming to IS 4923- 1997) riveted, bolted or welded in builtup for
all type sections, in framed work, including cutting, hoisting, fixing in position and applying
a priming coat of approved steel primer all complete as per the structural designs and
directions of Engineer in charge.Column ( 122 x 61 x 3.6mm )
Structural steel work ( Confirming to IS 4923- 1997) riveted, bolted or welded in builtup
for all type sections, in framed work, including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer all complete as per the structural designs
and directions of Engineer in charge.Column ( 122 x 61 x 3.6mm )
Mode of measurement shall be on kg basis.
Hiring of Tractor with trolley considering 8 Hrs. As working Day hours inclu. Driver
The rate shall be for a unit of one Day.
Supplying, labour for excavation of all types of soil at any depth including excavation
of asphalt pavement of any thickness, demolition of brick work in CM of any
proportion including stacking of serviceable materials and disposal of unserviceable
material etc. comp. as directed.
a) Mazdoor at day /night (As per min.wages circular of GOG)
The rate shall be for a unit of one No.
Raising of Existing manhole. Item includes, cutting of existing road surround by
Manhole by dimond cutter machine, dismantling of road in confined area by breaker
machine and carting of dismantled material. Item also included necessary brick work
to raise the manhole at road level in CM 1:3. Item also included fixing of Manhole
frame at exact road level by using MasterEmaco S 488 trowelable fibre reinforced
thixotropic repair mortar material, Laying of concrete made from MasterEmaco S
flowable micro concrete material in desired thickness and laying of hot mix
bituminous material in upper layer and compaction of hot mix bituminous material by
Plate compactor machine. Rate also included necessary plaster at inside of manhole
in CM 1:3 in 20 mm thickness on raised brickwork.Mazdoor at day /night (As per
min.wages circular of GOG)
Raising of Existing manhole. Item includes, cutting of existing road surround by
Manhole by dimond cutter machine, dismantling of road in confined area by breaker
machine and carting of dismantled material. Item also included necessary brick work to
raise the manhole at road level in CM 1:3. Item also included fixing of Manhole frame at
exact road level by using MasterEmaco S 488 trowelable fibre reinforced thixotropic
repair mortar material, Laying of concrete made from MasterEmaco S 346 flowable
micro concrete material in desired thickness and laying of hot mix bituminous material in
upper layer and compaction of hot mix bituminous material by Plate compactor machine.
Rate also included necessary plaster at inside of manhole in CM 1:3 in 20 mm thickness
on raised brickwork.Mazdoor at day /night (As per min.wages circular of GOG)
Measurements for Payment
The rate shall be for a unit of one No.
Seal and Signature of the Bidder Add.City Engineer(West Zone)
Amdavad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvotuhuNl
vr©b Ítul - Esluh Ftðþ
1. Ft<t îtht «t&b LOI (juxh ytuV RLxebuNl) RMgw fhJtbtk ytJNu. LOI (juxh ytuV RLxebuNl)
bégt ctœ rœl-10 btk 5 % (vtka xft) juFu auf&e / rzbtLz z[tVTx / vu ytuzoh / luNljtEÍz cukf
duhkxe&e zevtuÍex Che fhthvºt fhJtltu hnuNu. <u ctœ Jfo ytuzoh RMgw fhJtbtkk ytJNu ylu
Jfoytuzohle <theF&e mbg bgtoœt NÁ &guj dKJtbt ytJNu <ub A<tk vK ftb NY fhJtbtk lrn
ytJu <tu rlgbtlwmth ftgoJtne fhJtbt ytJNu.
2. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
3. xuLzh Jujezexe 120 rœJm hnuNu.
4. xuLzh MJefthÔþk, hesu¾x fhÔþk, ftulu ytvÔþk ylu fgt CtJ&e ytvÔþk, <u ykdu zu. BGþrl. frb.©e ltu
rlKog ytFhe hnuN.u
5. xuLzh Chuj ftuLx[t¾xh vife ftuEvK ftuLx[t¾xhlu vK yt CtJu ftb ytvJtbtk ytJu <tu ceò btLg
ftuLx[t¾xh Jtk^tu jE NfNu lrn.
6. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftb NY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s c^u NY
fhÔþk vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu yuÔþk atjNu lrn.
7. atÕþ ftbu ftuE vK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEllu
LþfNtl &Nu <tu <ule mkÃËKo sJtc>the (òlbtjle) ftuLx[t¾xhle vtu<tle hnuNu. mtEx vh ftb
>hBgtl bswh fu sl<tlt ftuE btKmlt òl btj fu LþfNtl &tg <ule sJtc>the ftuLx[t¾xhle
hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the vK ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <ule
sJtc>the vK vtujem Vhegt>btk ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk
(suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu
Ftztbtk W<thNu <tu ftuLx[t¾xh s vtujem Vhegtœbtk sJtcœth hnuNu ylu BGþrl. ftuvtuohuNlltu ftuEvK
MxtV ytlt btxu sJtc>th hnuNu lrn.ytxÕþk mbSlu s xuLzh ChÔþk.
8. yt xuLzh su <u Jdolt btLg gtœelt ftuLx[t¾xhtu Che NfNu. dJbuoLxlt btLg ftuLx[t¾xhu y.BGþ.ftuvtuo.
btk btLg ftuLx[t¾xhle gtœebtk hSMx[uNl ðþhk< fhtJÔþk vzNu.
9. yt Wvhtk< y.BGþ.ftuvtuo.lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu. Vtubo ce-1le Nh<tu
ck^lf<to hnuNu. ftb htuz ylu rcÕz´d Ftðþk - øþsht< htßglt MvuNeVefuNl «btKu fhJtLþk hnuNu
<&t MxtVle Mþalt vK mtEx Wvh atÕþ ftbu ægtlbtk juJtle hnuNu. ce-1 Vtubo <&t MvuNeVefuNl
øþsht< çþf Mxtuh, mu¾xh-21, dtk^eldh Ft<u&e ftuLx[t¾xhu ò<u bu¤Je juJtltu hnuNu. <u Jtkaelu vAe
10. ftuLx[t¾xhlu vubuLx BGþrl. ftuvtuo. Ltt rl<erlgb Bþsc fhJtbtk ytJNu.
11. ftuEvK ftgœtfeg jexeduNl yb>tJtœ Nnuhle ftuxobtk hnuNu.
12. bxehegj fu ceò xuMx´d hevtuxo ftuLx[t¾xhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu.
yt ykdultu mkÃËKo Fao <&t BGþrl. MxtVlu juctuhuxhe Mþ^e <&t buLGþVu¾ah´d søgt Mþ^e jtJJt jE
sJtltu Fao vK ftuLx[tfhu CtudJJtltu hnuNu.
13. juch yu¾x «btKu hSMx[uNl ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk
hnuNu. juch yu¾x «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[t¾xh mkÃËKovKu sJtc>th hnuNu.
14. btj su <u Mxtumo Wvh y&Jt mtEx Wvh Mþalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
15. muÕm xuût, ytu¾x[tug, mhatso, yLg xuût fu yLg ftuEvK fhJuht ChJtle sJtc>the ftuLx[t¾xhle
16. atEÕz juch yuBvjtug fhe NftNu lrn.
17. ftuLx[t¾xh îtht yuze.mexe.Rsluh©e / zu. mexe. Rsluh©ele mwalt bwsclt bxehegjltk muBvj hsw
18. ftuLx[t¾xhu atÕþ ftbu mtEx Wvh zeSxj fubuht&e ftb atÕþ > vnujtk, åttÕþ ftbu <&t ftb ÃËKo
>lt Vtuxtud{tV BGþrl. yturVmbtk ytvJtlt hnuNu.
19. ftuEvK fthKmh xuLzh hœ fhJtbtk ytJu <tu ftuLx[t¾xh <u ykdu ftuEvK «fthltu n¬tu fu J¤<hle
btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
20. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult
jtJJtlt hnuNu. ßgtk ftuE atuFJx l &E ntug ðgtk ytE.yum. ftuz «btKu bxehegÕm jtJJtLþk <&t
xuMx´d fhtJJtLþk hnuNu.
21. htßg / fuL÷ mhfth©elt JF<tu JF<lt ftgœt Bþsc su ftuE hfble fvt< fhJtlt nwfb
mhfth©eyu fhuj ntuE <u Bþsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
22. juch JuÕVuh Vkz btxu ntjbtk htßg mhfth©eyu fhujt nwfb Bþscle hfb cejbtk&e ftve juJtbtk
Wvhtu¾< Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkae Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mrn <&t me¬tu yuze.mexe Rsluh (v.Ítul)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition
and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour
is employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the
child labour welfare fund. If the employer refuses to deposit then action will be taken for contempt of Supreme Court
Judgement and also will be prosecuted by concerned authority. Because of the breach of any provision of child labour
prohibition and regulation Act 1986 by the Contractor & Municipal Corporation becomes liable to pay any amount then
the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No.
Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the
remaining amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to
follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain
regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C.
The same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender
duly signed. These shall form a part of tender. The tenderer shall not add or amend the text of any of the documents
except in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum or correction before submission
tender duly filled in by the contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or
correction published by A.M.C through its website www.egovamc.com. Tenderes shall verify the number of addendum
issued and enclose the same with the tender documents,failing which the tender shall be liable for rejection and no any
complaint in respect to this shall be entertained under any circumstances.
Clause : 5 Schedule Of Maintanance
Contractor Should have to manage following condition for maintanance work as per Engineer instruction
Sr.no. Mode Of Complaint Required machinory / Labour Remarks
Either Whatsup or Email Required as per site Condition or
3 Engineer Instruction
Complaint Received by higher
Authority / Councilor/ by Public
If Contractor Not Follow Schedule Of Maintanance
1. Whenever a work is allotted by Engineering staff, whether minor or major of part thereof of any
amount, the contractor shall be bound to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS ,ViaWhatsapp and through letter /E-mail shall be
considered legal and binding for the same.
2. Failure of comply to start the works in 48 hours of intimation as above by contractor the contractor
shall be levied penalty of (1) Rs.1000/-per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500
per day (for tenders amounting above 10 Lakhs and upto 30Lakhs), (3) Rs.5000 per day (for all
tenders amounting above 30Lakhs).
3. Three times failures by
contractor shall make contractor responsible to be blacklisted unless and otherwise justified properly
in writing/binding within 15days of last notice of penalty.
4. The Contractor shall adhere to the maintenance schedule outlined in the tender documents
and comply with the prevailing AMC circulars issued from time to time.
Contractor's Sign Addl.C.E.(westzone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 57.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].