| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC | 1 | Accepted-AOC Lowest |
| Sl No | Description | Qty | Unit | PRADEESH C L1 |
|---|---|---|---|---|
| 1.00Kumbalamchola ramankuttipadi well rennovation | ||||
| 1.00 | OD410629/2025-2026:Coolie | 5 | each | 1,082.18 ₹5,410.9 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 16 | hour | 345.54 ₹5,528.64 Lowest |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 86.35 | sqm | 308.96 ₹26,678.7 Lowest |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 4.32 | cum | 9,847.37 ₹42,520.94 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 129.54 | kilogram | 112.43 ₹14,564.18 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 125 | kg | 178.42 ₹22,302.5 Lowest |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 0.64 | cum | 6,831.14 ₹4,365.1 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 27.07 | sqm | 369.76 ₹10,009.4 Lowest |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 24.87 | sqm | 80.85 ₹2,010.74 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,204
Closing Date
18 Mar 2026, 6:00 pmClosed
Assistant Engineer
LID and EW Kanjirapuzha GP
KANJIRAPUZHA GP 2025-26 PRO.NO.38/26-PUBLIC WELL RENOVATION OF KUMBALAMCHOLA CENTRE- KUMBALAMCHOLA RAMANKUTTIPPADI KUMBALAMCHOLA CHANDRANPADI PADINJAREPPADAM KUMBALAMCHOLA IN WARD 2
2026_LSGD_832147_9
07/25-26/AE/LIDEW/KPGP
Open Tender
Civil Works - Water Works
Item Rate
180 days
Kanjirapuzha
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹6,204
Yes
23 Oct 2026
11 Mar 2026
21 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Kumbalamchola ramankuttipadi well rennovation | |||||
| 1.001 | OD410629/2025-2026:Coolie | 5 | each | - | - |
| 1.002 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 16 | hour | - | - |
| 1.003 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 86.35 | sqm | - | - |
| 1.004 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 4.32 | cum | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 129.54 | kilogram | - | - |
| 1.006 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 125 | kg | - | - |
| 1.007 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 0.64 | cum | - | - |
| 1.008 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 27.07 | sqm | - | - |
| 1.009 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 24.87 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429439.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.03 MB
Tendernotice_3.pdf
PDF • 0.02 MB
Tendernotice_4.pdf
PDF • 0.02 MB
Tendernotice_5.pdf
PDF • 0.16 MB
Tendernotice_6.pdf
PDF • 0.25 MB
BOQ_1429439.xls
BOQ • 0.31 MB
viewnit.pdf
Tender Documents • 0.02 MB
viewsbd.pdf
Tender Documents • 1.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .