| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹4.6 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹4.7 LRejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | ₹4.7 L | L2 | Rejected-Finance higher than L1 |
| 3 | L3₹4.7 LRejected-Finance ADAM KANAN JHARGRAM 721507 | JHARGRAM | WEST BENGAL | 721507 | ₹4.7 L | L3 | Rejected-Finance higher than L1 |
| Sl No | Description | Qty | Unit | DEY ENTERPRISE L1 | DEBJYOTI BASU L3 | EASTERN INDIA SALES AND SERVICE L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling and taken out the old damaged gaseous chlorination spares part by part after disconnection of gaseous pipe line and power line by expert chlorination mechanic complete the job as per direction of EIC. | 1 | ITEM | 3,517.5 ₹3,517.50 | 3,594.5 ₹3,594.50 | 3,587.5 ₹3,587.50 |
| 2.00Supply and delivery of gaseous chlorination unit spares at OHR sites (1 Kg/hr required of) : | ||||||
| 2.01 | Supply & fitting fixing of 0.65kW, 3000 rpm, 3 phase, 415V, 50Hz horizontal multistage type Booster pump coupled with motor at above site with following specifications :
Rated flow : 3.1 m3/hr.
Rated head : 41.8 M
Pump housing : Cast Iron
Impeller : SS
Insulation Class : 'F'
Enclosure : IP-55
[Make : Grundfos (Model No. : CM 3-6 A-R-A-V-AVB F-A-A-N) / BE / Equivalent approved make] | 1 | SET | 68,340 ₹68,340 | 69,836 ₹69,836 | 69,700 ₹69,700 |
| 2.02 | 0-1 kg. Wall mounted Vaccum Regulator with scale controler
(Part No. - VR202C1010105IND0100L)
[Make : Capital Control India Pvt. Ltd./ Equivalent Approved Make] | 1 | SET | 2,35,637.33 ₹2.4 L | 2,40,795.56 ₹2.4 L | 2,40,326.63 ₹2.4 L |
| 2.03 | 25 mm GM gate Valve [Make: Leader] | 2 | NOS. | 2,448.18 ₹4,896.36 | 2,501.77 ₹5,003.54 | 2,496.9 ₹4,993.80 |
| 2.04 | 25 mm dia inlet-outlet injection feeting complete set. | 3 | NOS. | 12,562.5 ₹37,687.50 | 12,837.5 ₹38,512.50 | 12,812.5 ₹38,437.50 |
| 2.05 | Ejector Diaphragm (D-104) | 3 | NOS. | 4,704.41 ₹14,113.23 | 4,807.39 ₹14,422.17 | 4,798.03 ₹14,394.09 |
| 2.06 | Ejector Support Diaphragm (D-105) | 4 | NOS. | 812.54 ₹3,250.16 | 830.33 ₹3,321.32 | 828.71 ₹3,314.84 |
| 2.07 | Ejector ‘O’ Ring (OV-11-210) | 4 | NOS. | 731.64 ₹2,926.56 | 747.66 ₹2,990.64 | 746.2 ₹2,984.80 |
| 3.00 | Overhauling of gaseous chlorination & header line part by part expert mechanic after disconnection of header line by through servicing and cleaning with fitting fixing and proper alignment complete. | 1 | ITEM | 5,025 ₹5,025 | 5,135 ₹5,135 | 5,125 ₹5,125 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
11 Feb 2026, 12:00 pmClosed
Executive_Engineer_NTKMD_PHED
Utility_Bldg__Beside_Delhi_Public_School_AA_ID_New_Town_Kol_700156
Repairing and overhauling for gaseous chlorination system with allied works of OHR-18 in connection with Haj Operation 2026 under NTKMD, PHE Dte.
2026_PHED_991959_3
PHE/NTKMD/e-17 of 2025-26
Open Tender
Project Work
30 days
WORK
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
2 Apr 2026
22 Jan 2026
13 Feb 2026
22 Jan 2026
11 Feb 2026
22 Jan 2026
Dismantling and taken out the old damaged gaseous chlorination spares part by part after disconnection of gaseous pipe line and power line by expert chlorination mechanic complete the job as per direction of EIC.
Supply and delivery of gaseous chlorination unit spares at OHR sites (1 Kg/hr required of) :
Supply & fitting fixing of 0.65kW, 3000 rpm, 3 phase, 415V, 50Hz horizontal multistage type Booster pump coupled with motor at above site with following specifications : Rated flow : 3.1 m3/hr. Rated head : 41.8 M Pump housing : Cast Iron Impeller : SS Insulation Class : 'F' Enclosure : IP-55 [Make : Grundfos (Model No. : CM 3-6 A-R-A-V-AVB F-A-A-N) / BE / Equivalent approved make]
0-1 kg. Wall mounted Vaccum Regulator with scale controler (Part No. - VR202C1010105IND0100L) [Make : Capital Control India Pvt. Ltd./ Equivalent Approved Make]
25 mm GM gate Valve [Make: Leader]
25 mm dia inlet-outlet injection feeting complete set.
Ejector Diaphragm (D-104)
Ejector Support Diaphragm (D-105)
Ejector ‘O’ Ring (OV-11-210)
Overhauling of gaseous chlorination & header line part by part expert mechanic after disconnection of header line by through servicing and cleaning with fitting fixing and proper alignment complete.
Fitting fixing of the above new supplied spares and departmental supplied materials with gaseous chlorination pipe line on the existing position part by part including supply of Nut bolt, washer and others errection materials with connection of gaseous pipe line and power line by expert chlorination mechanic complete the job as per direction of EIC.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.98 MB
Tendernotice_2.pdf
PDF • 0.90 MB
Tendernotice_3.pdf
PDF • 0.57 MB
BOQ_2425423.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid